IFB.HSCG8816BPQQ034.Solicitation.(MYAC_Structures_Replacement_Southern_Oregon).01-28-2016.pdf

PDF 730 KB Posted

Attached to
INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT FOR MULTI-YEAR ATON STRUCTURES REPLACEMENT FOR SOUTHERN OREGON
Solicitation number
HSCG88-16-B-PQQ034
Issued by

About this file

IFB.HSCG8816BPQQ034.Solicitation.(MYAC Structures Replacement Southern Oregon).01-28-2016

View the file

Other files

File Type Posted
IFB.HSCG8816BPQQ034.Amend_Solicitation_Offer_ _Offer_Award_SF-1442_(REV._82014)_(MYAC_ATON_Southern_Oregon).pdf PDF
IFB.HSCG8816BPQQ034.Solicitaion_Amendment_0002.(MYAC_ATON_Southern_Oregon).SF-30.pdf PDF
IFB.HSCG8816BPQQ034.Contractor_Request_for_Clarification.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
IFB.HSCG8816BPQQ034.Solicitation_Amendment_0001_(MYAC_ATON_Southern_Oregon).SF-30.pdf PDF
IFB.HSCG8816BPQQ034.Specification_Amendment_0001.(MYAC_ATON_Southern_Oregon).Final.pdf PDF
IFB.HSCG8816BPQQ034.Solicitation_Amendment_0001_(MYAC_ATON_Southern_Oregon).SF-30._Word.pdf PDF
IFB.HSCG8816BPQQ034.Appendix_B_Marine_Mammal_Monitoring.pdf PDF
IFB.HSCG8816BPQQ034.Appendix_A_Oregon_Fish_ _Wildlife_In_Water_Work_Windows.pdf PDF
ATON-STD 06 sheet 1 of 3 Platform 10x10.tif TIF image
ATON-STD 12 sheet 2 of 4.pdf PDF
ATON-STD 06 sheet 2 of 3.pdf PDF
IFB.HSCG8816BPQQ034.Contractor_Responsibility_Questionaire.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
ATON-STD 12 sheet 3 of 4.pdf PDF
ATON-STD 11 sheet 1 of 1 Ladder Details.pdf PDF
IFB.HSCG8816BPQQ034.WageRate(Lincoln_County_for_Yaquina_Bay).OR150072.07-03-2015.OR72.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD 03 sheet 1 of 1 Three Pile.tif TIF image
ATON-STD-08 sheet 5 of 6 7x7 Tower.tif TIF image
ATON-STD-08 sheet 2 of 6 7x7 Tower.tif TIF image
IFB.HSCG8816BPQQ034.WageRate(Tillamook_County).OR150076.07-03-2015.OR76.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
IFB.HSCG8816BPQQ034.Contractor_Request_for_Clarification.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
ATON-STD 01 sheet 1 of 1 Single Pile.tif TIF image
ATON-STD 12 sheet 4 of 4.pdf PDF
ATON-STD 05 sheet 1 of 2 Pedestals Bases.pdf PDF
ATON-STD 04 sheet 1 of 1 Three Pile Range.tif TIF image
IFB.HSCG8816BPQQ034.Specs(PSN-7337310).(MYAC_Structures_Replacement_Southern_Oregon).doc.pdf PDF
IFB.HSCG8816BPQQ034.WageRate(CoosCounty).OR150064.07-03-2015.OR64.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD-08 sheet 6 of 6 7x7 Tower.tif TIF image
ATON-STD 15 sheet 1 of 1 Subcable.tif TIF image
ATON-STD 10 sheet 1 of 1 7x7 Platform.tif TIF image
ATON-STD 12 sheet 1 of 4 Range Board Frames.pdf PDF
ATON-STD-08 sheet 4 of 6 7x7 Tower.tif TIF image
IFB.HSCG8816BPQQ034.Solicitation_Offer_ _Offer_Award_(SF-1442).(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
ATON-STD-09 sheet 1 of 1 5x5 Platform.pdf PDF
ATON-STD 14 sheet 1 of 1 Safety Climb.tif TIF image
ATON-STD-02 sheet 1 of 1 Single Pile Range.pdf PDF
ATON-STD 05 sheet 2 of 2 Pedestals Bases.tif TIF image
ATON-STD 06 sheet 3 of 3.tif TIF image
IFB.HSCG8816BPQQ034.Forecast.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD-08 sheet 1 of 6 7x7 Tower.tif TIF image
ATON-STD 07 sheet 1 of 3 H-Pile.tif TIF image
ATON-STD 07 sheet 3 of 3.tif TIF image
ATON-STD-08 sheet 3 of 6 7x7 Tower.tif TIF image
IFB.HSCG8816BPQQ034.Historical_Information.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
IFB.HSCG8816BPQQ034.WageRate(Curry_County_for_Brookings).OR150065.07-03-2015.OR65.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD-13 sheet 1 of 1 Dayboards.pdf PDF
ATON-STD 07 sheet 2 of 3.tif TIF image
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Invitation For Bid Number: HSCG88-16-B-PQQ034

SOUTHERN OREGON MULTI-YEAR AID-TO-NAVIGATION (ATON) STRUCTURES

REPLACEMENT FOR COOS BAY, TILLAMOOK, BROOKINGS, YAQUINA BAY

AND OTHER INLETS IN SOUTHERN OREGON; PSN-7337310

To access pages 1 & 2 of Standard Form (SF) 1442, access from uploaded documents. After obtaining the SF-1442, continue scrolling down from this point to obtain the remainder of the Invitation For Bid (IFB).

YOU MUST RETURN THE FOLLOWING. FAILURE TO DO SO

MAY DEEM YOUR BID NON-RESPONSIVE.

A. ONE (1) COMPLETE COPY OF THE STANDARD FORM 1442

(SOLICITATION OFFER AND AWARD) AND ALL AMENDMENTS.

B. SECTION B (SCHEDULE OF PRICES).

C. SECTION J (CONTRACTOR’S RESPONSIBILITY

QUESTIONNAIRE).

D. SECTION K (REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFEROR’S).

E. SECTION L (BID BOND (STANDARD FORM 24) IN THE AMOUNT

OF $10,000.

PLEASE MAIL YOUR BID TO THE FOLLOWING ADDRESS:

CONTRACTING OFFICER

Attn: Tony Flores

IFB HSCG88-16-B-PQQ034

USCG Civil Engineering Unit 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203

Please do not call to inquire about the status of your bid as this information will not be released.

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy the concerns, the interested parties are encouraged to contact the Coast U.S. Coast Guard Ombudsman for Agency Protests.

Under this informal process, the agency is not required to suspend contract award performance.

Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest either to the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.

Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.

Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protestor agrees not to file a protest with the GAO or other external forum. If the protest is file with an external forum, the agency protest will be dismissed.

The Ombudsman Hotline telephone number is 202.372.3695.

mailto:OPAP@uscg.mil

SECTION B

LIST OF ATTACHMENTS

B.1 ATTACHMENTS

The following listed attachments are a part of this solicitation and any resulting contract:

1. Schedule of Prices, (Base Year and Option Years 1, 2, 3, and 4), Items 000001 through 492004.

ITEM

NO. DESCRIPTION EST.

QTY UNIT UNIT PRICE EST TOTAL

000001

Base Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in Southern Oregon for US Coast Guard for the Base Period from 04/01/2016 to 05/31/2017.

010000 IMPROPER CHARACTERISTIC DELIVERY ORDER

011000 MOBILIZATION / DEMOBILIZATION:

011001 Mobilize for Improper Characteristic Delivery Order in Area No. 1. 1 per Delivery Order.

1 EA

011002 Demobilize for Improper Characteristic Delivery Order in Area No. 1. 1 Per Delivery Order.

011003 Mobilize for Improper Characteristic Delivery Order in Area No. 2. 1 Per Delivery Order.

011004 Demobilize for Improper Characteristic Delivery Order in

011005 Mobilize for Improper Characteristic Delivery Order in Area No. 3. 1 Per Delivery Order.

011006 Demobilize for Improper Characteristic Delivery Order in

011007

Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction

011008

Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

011009

Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

012000 REMOVALS – IN WATER CONSTRUCTION

012001

Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

STD 02.

012002

Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

012003

Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.

012004

Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

012005

Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.

012006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

012007

Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

Contractor shall dispose of all other materials.

012008 Remove and dispose of one NON ATON piling using vibratory method 1 EA

012500 Removals - Shore Construction

012501

Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

012502

Remove sectional tower assembly and disassemble.

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.

012503 Remove concrete foundation up to 6 Cubic Yards.

012504 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other

1 CY

013000 INSTALLATIONS

013100 IN WATER CONSTRUCTION - INSTALLATIONS

013101

Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.

Remove and return temporary buoy.

013102

Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.

013103

Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.

013104

Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.

013105

Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.

013106

Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD

013107

Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD

013108 Install a concrete pedestal foundation on a break wall.

Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.

013109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.

013110

Install a submerged obstruction concrete foundation.

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .

013111 Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.

013112

Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.

013113

Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.

013114

Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD 06,

ATON STD 09, ATON STD 10 and ATON STD 11.

013115 Install one (1) NON ATON steel pile using the vibratory method 1 EA

013500 SHORE CONSTRUCTION - INSTALLATION

013501 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07.

013502 Install a concrete foundation to receive a sectional tower

013503 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing

ATON STD 07.

013504 Install a concrete pedestal foundation on a land location.

As per drawing ATON STD 05.

013505 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD 06,

013506 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire

013507 Provide and install an additional 4 linier feet of fence.

020000 EMERGENCY DELIVERY ORDERS

021000 EMERGENCY MOBILIZATION / DEMOBILIZATION:

021001 Mobilize and Demobilize for EMERGENCY Delivery Order in Area No. 1. 1 per Delivery Order.

021002 Mobilize and Demobilize for EMERGENCY Delivery Order in Area No. 2. 1 Per Delivery Order.

021003 Mobilize and Demobilize or EMERGENCY Delivery Order in Area No. 3. 1 Per Delivery Order.

022000 REMOVALS

022001 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.

022002 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.

022003 including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Delivery Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

022004 consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.

022005 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

030000 TRANSIT COSTS

030001 A. Transit from one in water work location to another in water work location on the same Delivery Order per nautical mile (NM).

1 NM

040000 REPAIRS

040001

Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON

STD 12, ATON STD 13 and ATON STD 14.

040002

Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD 14.

040003

Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD

02, ATON STD 03, ATON STD 04, ATON STD 05,

ATON STD 06, and ATON STD 11.

050000 MATERIALS

050001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF).

1 LF

050002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together.

050003

Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”.

050004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing

ATON STD 05.

050005

Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06.

1 LFT

050006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09.

050007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10.

050008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11.

050009

Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11.

1 Set

050010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06.

050011

Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

STD 08.

050012

Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

050013

Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

050014 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 08.

050015 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

ATON STD 10.

050016 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

050017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08.

1 SET

050018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08.

050019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.

050020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with

050021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing

ATON STD 12.

050022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing

050023 Provide a manufactured cable type Safety Climb Device.

In accordance with drawing ATON STD 14.

060000 RETURN OF GOVERNMENT MATERIALS

060001

At the completion of a Delivery Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this delivery order.

070000 AS-BUILT PHOTOGRAPHS

070001

Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)

NOTE: All photos taken under one Delivery Order may be combined on one CD.)

080000 DIVING SERVICES

080001

Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line.

080002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings.

090000 FIELD ENGINEERING

090001 Perform a geodetic survey as per the requirements of

VERTICAL AND HORIZONTAL POSITIONING

METHOD.

091000 MARINE MAMMAL MONITORING

091001

Geographical Area 1 (South of Seaside, OR to the waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water. 1 EA

091002

Geographical Area 2 (South of Yaquina Head, OR to the waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary

091003

Geographical Area 3 (South of Coquille Point, OR to the waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water. 1 EA

091004

Onsite Monitoring Services/per day: Includes labor, equipment and supplies for the biologist and team to perform monitoring services on the ATON site for one 8-hour day. Applies to Geographical Areas 1,2 and 3. 1 DY

091005

Standby for Marine Mammal(s): Includes labor and equipment for the construction crew to standby while waiting for a marine mammal to vacate the construction area. 1 HR

092000 EELGRASS SURVEY

092001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary

092002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary

092003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the

092004 equipment and supplies for the biologist and team to perform eelgrass surveys on the ATON site for one 8-

TOTAL SUM OF BASE YEAR PERIOD: $__________________

100001

Option Year 1: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile

Option Year 1 from 04/01/2017 to 05/31/2018.

110000 IMPROPER CHARACTERISTIC DELIVERY ORDER

111000 MOBILIZATION / DEMOBILIZATION:

111001 Mobilize for Improper Characteristic Delivery Order in

111002 Demobilize for Improper Characteristic Delivery Order in

111003 Mobilize for Improper Characteristic Delivery Order in

111004 Demobilize for Improper Characteristic Delivery Order in

111005 Mobilize for Improper Characteristic Delivery Order in

111006 Demobilize for Improper Characteristic Delivery Order in

111007 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

111008 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

111009 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

112000 REMOVALS – IN WATER CONSTRUCTION

112001 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

112002 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD

112003 including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD

112004 consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose

112005 of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other

112006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

112007 submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

112008 Remove and dispose of one NON ATON piling using

112500 Removals - Shore Construction

112501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

112502

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

112503 Remove concrete foundation up to 6 Cubic Yards.

112504 foundation. Contractor shall dispose of all other

113000 INSTALLATIONS

113100 IN WATER CONSTRUCTION - INSTALLATIONS

113101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.

113102 steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return

113103 steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary

113104 steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove

113105 install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and

113106 sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD

113107 additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD

113108

Using up to 5 Cubic Yards of concrete in accordance

113109 pedestal foundation on a break wall in accordance with

113110

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In

113111 concrete foundation. Includes concrete pipe, rebar and

113112 concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10

113113 concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, 113114 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD 06,

113115 Install one (1) NON ATON steel pile using the vibratory

113500 SHORE CONSTRUCTION - INSTALLATION

113501 Install four “H” piles to receive a sectional tower

113502 Install a concrete foundation to receive a sectional tower

113503 sectional tower assembly. In accordance with drawing

113504 Install a concrete pedestal foundation on a land location.

113505 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD 06,

113506 Provide and install a chain link fence around a shore

113507 Provide and install an additional 4 linier feet of fence.

120000 EMERGENCY DELIVERY ORDERS

121000 EMERGENCY MOBILIZATION / DEMOBILIZATION:

121001 Mobilize and Demobilize for EMERGENCY Delivery

121002 Mobilize and Demobilize for EMERGENCY Delivery

121003 Mobilize and Demobilize or EMERGENCY Delivery

122000 REMOVALS

122001 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See

122002 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See

122003 including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Delivery Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

122004 consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall

122005 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

130000 TRANSIT COSTS

130001 water work location on the same Delivery Order per

140000 REPAIRS

140001 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON

140002 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, 140003 on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD

02, ATON STD 03, ATON STD 04, ATON STD 05,

150000 MATERIALS

150001 Provide 40 foot length of 18 inch diameter 3/8 inch wall

150002 Perform one (1) weld to join two (2) pieces of 18”

150003 steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line

150004 plate and 10 feet of pipe. In accordance with drawing

150005 with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD

150006 Provide one fabricated 5’’x5’ platform in accordance with

150007 Provide one fabricated 7’x7’ platform in accordance with

150008 Provide one fabricated 7 foot ladder extension in

150009 ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with

150010 Provide a fabricated 10 foot square 4 pile platform. In

150011 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

150012 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

150013 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

150014 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

150015 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

150016 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

150017

Connector Bracket, including all fasteners. As per

150018 Provide a fabricated set of 4 each splice brackets, 150019

Frame, including all fasteners. In accordance with

150020

Frame, including all fasteners. In accordance with

150021 including all fasteners. In accordance with drawing

150022 including all fasteners. In accordance with drawing

150023 Provide a manufactured cable type Safety Climb Device.

160000 RETURN OF GOVERNMENT MATERIALS

160001 government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this delivery

170000 AS-BUILT PHOTOGRAPHS

170001 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)

NOTE: All photos taken under one Delivery Order may

180000 DIVING SERVICES

180001 position of old structure, attending retrieval process for found structure and cut of any metal pile extending

180002 underwater portion of structure. Provide written report of

190000 FIELD ENGINEERING

190001

VERTICAL AND HORIZONTAL POSITIONING

191000 MARINE MAMMAL MONITORING

191001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary

191002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary

191003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the

191004 equipment and supplies for the biologist and team to

191005 equipment for the construction crew to standby while

192000 EELGRASS SURVEY

192001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary

192002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary

192003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the

192004 equipment and supplies for the biologist and team to

TOTAL SUM OF OPTION YEAR PERIOD 1: $__________________

200001

Option Year 2: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile

Option Year 2 from 04/01/2018 to 05/31/2019.

210000 IMPROPER CHARACTERISTIC DELIVERY ORDER

211000 MOBILIZATION / DEMOBILIZATION:

211001 Mobilize for Improper Characteristic Delivery Order in

211002 Demobilize for Improper Characteristic Delivery Order in

211003 Mobilize for Improper Characteristic Delivery Order in

211004 Demobilize for Improper Characteristic Delivery Order in

211005 Mobilize for Improper Characteristic Delivery Order in

211006 Demobilize for Improper Characteristic Delivery Order in

211007 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

211008 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

211009 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

212000 REMOVALS – IN WATER CONSTRUCTION

212001 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

212002 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD

212003 including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD

212004 consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose

212005 of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other

212006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

212007 submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

212008 Remove and dispose of one NON ATON piling using

212500 Removals - Shore Construction

212501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

212502

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

212503 Remove concrete foundation up to 6 Cubic Yards.

212504 foundation. Contractor shall dispose of all other

213000 INSTALLATIONS

213100 IN WATER CONSTRUCTION - INSTALLATIONS

213101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.

213102 steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return

213103 steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary

213104 steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove

213105 install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and

213106 sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD

213107 additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD

213108

Using up to 5 Cubic Yards of concrete in accordance

213109 pedestal foundation on a break wall in accordance with

213110

Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In

213111 concrete foundation. Includes concrete pipe, rebar and

213112 concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10

213113 concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, 213114 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON

STD 03, ATON STD 04, ATON STD 05, ATON STD 06,

213115 Install one (1) NON ATON steel pile using the vibratory

213500 SHORE CONSTRUCTION - INSTALLATION

213501 Install four “H” piles to receive a sectional tower

213502 Install a concrete foundation to receive a sectional tower

213503 sectional tower assembly. In accordance with drawing

213504 Install a concrete pedestal foundation on a land location.

213505 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON

STD 03, ATON STD 04, ATON STD 05 ATON STD 06,

213506 Provide and install a chain link fence around a shore

213507 Provide and install an additional 4 linier feet of fence.

220000 EMERGENCY DELIVERY ORDERS

221000 EMERGENCY MOBILIZATION / DEMOBILIZATION:

221001 Mobilize and Demobilize for EMERGENCY Delivery

221002 Mobilize and Demobilize for EMERGENCY Delivery

221003 Mobilize and Demobilize or EMERGENCY Delivery

222000 REMOVALS

222001 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See

222002 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.

Contractor shall dispose of all other materials. See

222003 including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Delivery Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.

222004 consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall

222005 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

230000 TRANSIT COSTS

230001 water work location on the same Delivery Order per

240000 REPAIRS

240001 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON

240002 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, 240003 on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD

02, ATON STD 03, ATON STD 04, ATON STD 05,

250000 MATERIALS

250001 Provide 40 foot length of 18 inch diameter 3/8 inch wall

250002 Perform one (1) weld to join two (2) pieces of 18”

250003 steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line

250004 plate and 10 feet of pipe. In accordance with drawing

250005 with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD

250006 Provide one fabricated 5’’x5’ platform in accordance with

250007 Provide one fabricated 7’x7’ platform in accordance with

250008 Provide one fabricated 7 foot ladder extension in

250009 ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with

250010 Provide a fabricated 10 foot square 4 pile platform. In

250011 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

250012 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

250013 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON

250014 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

250015 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

250016 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing

250017

Connector Bracket, including all fasteners. As per

250018 Provide a fabricated set of 4 each splice brackets, 250019

Frame, including all fasteners. In accordance with

250020

Frame, including all fasteners. In accordance with

250021 including all fasteners. In accordance with drawing

250022 including all fasteners. In accordance with drawing

250023 Provide a manufactured cable type Safety Climb Device.

260000 RETURN OF GOVERNMENT MATERIALS

260001 government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this delivery

270000 AS-BUILT PHOTOGRAPHS

270001 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)

NOTE: All photos taken under one Delivery Order may

280000 DIVING SERVICES

280001 position of old structure, attending retrieval process for found structure and cut of any metal pile extending

280002 underwater portion of structure. Provide written report of

290000 FIELD ENGINEERING

290001

VERTICAL AND HORIZONTAL POSITIONING

291000 MARINE MAMMAL MONITORING

291001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary

291002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary

291003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the

291004 equipment and supplies for the biologist and team to

291005 equipment for the construction crew to standby while

292000 EELGRASS SURVEY

292001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary

292002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary

292003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the

292004 equipment and supplies for the biologist and team to

TOTAL SUM OF OPTION YEAR PERIOD 2: $__________________

300001

Option Year 3: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile

Option Year 3 from 04/01/2019 to 05/31/2020.

310000 IMPROPER CHARACTERISTIC DELIVERY ORDER

011000 MOBILIZATION / DEMOBILIZATION:

311001 Mobilize for Improper Characteristic Delivery Order in

311002 Demobilize for Improper Characteristic Delivery Order in

311003 Mobilize for Improper Characteristic Delivery Order in

311004 Demobilize for Improper Characteristic Delivery Order in

311005 Mobilize for Improper Characteristic Delivery Order in

311006 Demobilize for Improper Characteristic Delivery Order in

311007 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

311008 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

311009 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore

312000 REMOVALS – IN WATER CONSTRUCTION

312001 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON

312002 including platform assembly, ladder extensions.

Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD

312003 including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD

312004 consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.

Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose

312005 of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other

312006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

312007 submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.

312008 Remove and dispose of one NON ATON piling using

312500 Removals - Shore Construction

312501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

312502

Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other

312503 Remove concrete foundation up to 6 Cubic Yards.

312504 foundation. Contractor shall dispose of all other

313000 INSTALLATIONS

313100 IN WATER CONSTRUCTION - INSTALLATIONS

313101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.

313102 steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board.