Invitation For Bid Number: HSCG88-16-B-PQQ034
SOUTHERN OREGON MULTI-YEAR AID-TO-NAVIGATION (ATON) STRUCTURES
REPLACEMENT FOR COOS BAY, TILLAMOOK, BROOKINGS, YAQUINA BAY
AND OTHER INLETS IN SOUTHERN OREGON; PSN-7337310
To access pages 1 & 2 of Standard Form (SF) 1442, access from uploaded documents. After obtaining the SF-1442, continue scrolling down from this point to obtain the remainder of the Invitation For Bid (IFB).
YOU MUST RETURN THE FOLLOWING. FAILURE TO DO SO
MAY DEEM YOUR BID NON-RESPONSIVE.
A. ONE (1) COMPLETE COPY OF THE STANDARD FORM 1442
(SOLICITATION OFFER AND AWARD) AND ALL AMENDMENTS.
B. SECTION B (SCHEDULE OF PRICES).
C. SECTION J (CONTRACTOR’S RESPONSIBILITY
QUESTIONNAIRE).
D. SECTION K (REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFEROR’S).
E. SECTION L (BID BOND (STANDARD FORM 24) IN THE AMOUNT
OF $10,000.
PLEASE MAIL YOUR BID TO THE FOLLOWING ADDRESS:
CONTRACTING OFFICER
Attn: Tony Flores
IFB HSCG88-16-B-PQQ034
USCG Civil Engineering Unit 1301 Clay Street 7th Floor, Suite 700N Oakland, CA 94612-5203
Please do not call to inquire about the status of your bid as this information will not be released.
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the Coast Guard to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the General Accounting Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within USCG as an Alternative Dispute Resolution (ADR) forum, rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.
Informal forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy the concerns, the interested parties are encouraged to contact the Coast U.S. Coast Guard Ombudsman for Agency Protests.
Under this informal process, the agency is not required to suspend contract award performance.
Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an independent review is available by the Ombudsman. The protester may file a formal agency protest either to the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth at FAR 33.103(d)(2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.
Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the Ombudsman, and while the protest is pending, the protestor agrees not to file a protest with the GAO or other external forum. If the protest is file with an external forum, the agency protest will be dismissed.
The Ombudsman Hotline telephone number is 202.372.3695.
mailto:OPAP@uscg.mil
SECTION B
LIST OF ATTACHMENTS
B.1 ATTACHMENTS
The following listed attachments are a part of this solicitation and any resulting contract:
1. Schedule of Prices, (Base Year and Option Years 1, 2, 3, and 4), Items 000001 through 492004.
ITEM
NO. DESCRIPTION EST.
QTY UNIT UNIT PRICE EST TOTAL
000001
Base Year: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile contract in Southern Oregon for US Coast Guard for the Base Period from 04/01/2016 to 05/31/2017.
010000 IMPROPER CHARACTERISTIC DELIVERY ORDER
011000 MOBILIZATION / DEMOBILIZATION:
011001 Mobilize for Improper Characteristic Delivery Order in Area No. 1. 1 per Delivery Order.
1 EA
011002 Demobilize for Improper Characteristic Delivery Order in Area No. 1. 1 Per Delivery Order.
011003 Mobilize for Improper Characteristic Delivery Order in Area No. 2. 1 Per Delivery Order.
011004 Demobilize for Improper Characteristic Delivery Order in
011005 Mobilize for Improper Characteristic Delivery Order in Area No. 3. 1 Per Delivery Order.
011006 Demobilize for Improper Characteristic Delivery Order in
011007
Mobilize and Demobilize from one site in Area No. 1 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore Construction
011008
Mobilize and Demobilize from one site in Area No. 2 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
011009
Mobilize and Demobilize from one site in Area No. 3 for land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
012000 REMOVALS – IN WATER CONSTRUCTION
012001
Remove damaged single (1) steel pipe pile structure including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
STD 02.
012002
Remove damaged three (3) steel pipe pile structure including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
012003
Remove damaged four (4) steel pipe pile structure including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD 08.
012004
Remove damaged wood pile channel marking structure consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
012005
Remove damaged wood pile range structure consisting of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other materials.
012006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
012007
Remove pedestal assembly from either a break wall or submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
Contractor shall dispose of all other materials.
012008 Remove and dispose of one NON ATON piling using vibratory method 1 EA
012500 Removals - Shore Construction
012501
Remove damaged wood pile structure consisting of driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
012502
Remove sectional tower assembly and disassemble.
Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other materials. See drawings ATON STD 08.
012503 Remove concrete foundation up to 6 Cubic Yards.
012504 Remove an additional 1 Cubic Yard of concrete foundation. Contractor shall dispose of all other
1 CY
013000 INSTALLATIONS
013100 IN WATER CONSTRUCTION - INSTALLATIONS
013101
Install single-pile steel beacon structure including single steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.
Remove and return temporary buoy.
013102
Install single-pile steel range structure including single steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
013103
Install three-pile steel beacon structure including three steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary buoy.
013104
Install three-pile steel range structure, including: three steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove and return temporary buoy.
013105
Install four-pile steel structure including four steel piles, install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and return temporary buoy.
013106
Assemble and install on a four-pile steel structure a sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD
013107
Assemble and install on a four-pile steel structure an additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD
013108 Install a concrete pedestal foundation on a break wall.
Using up to 5 Cubic Yards of concrete in accordance with drawing ATON STD 05.
013109 Install an additional 1 cubic Yard of concrete for a pedestal foundation on a break wall in accordance with drawing ATON STD 05.
013110
Install a submerged obstruction concrete foundation.
Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In accordance with drawing ATON STD 05 .
013111 Install an additional 1 foot of submerged obstruction concrete foundation. Includes concrete pipe, rebar and concrete fill. In accordance with drawing ATON STD 05.
013112
Install a pedestal beacon structure on a new or existing concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10 and ATON STD 13.
013113
Install a pedestal range structure on a new or existing concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, ATON STD 10 and ATON STD 12.
013114
Install on any type of steel pile structure, one each, 7 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON
STD 03, ATON STD 04, ATON STD 05, ATON STD 06,
ATON STD 09, ATON STD 10 and ATON STD 11.
013115 Install one (1) NON ATON steel pile using the vibratory method 1 EA
013500 SHORE CONSTRUCTION - INSTALLATION
013501 Install four “H” piles to receive a sectional tower assembly. In accordance with drawing ATON STD 07.
013502 Install a concrete foundation to receive a sectional tower
013503 Install a concrete foundation as a pile cap to receive a sectional tower assembly. In accordance with drawing
ATON STD 07.
013504 Install a concrete pedestal foundation on a land location.
As per drawing ATON STD 05.
013505 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON
STD 03, ATON STD 04, ATON STD 05 ATON STD 06,
013506 Provide and install a chain link fence around a shore structure 10 foot by 10 foot including gate, razor wire
013507 Provide and install an additional 4 linier feet of fence.
020000 EMERGENCY DELIVERY ORDERS
021000 EMERGENCY MOBILIZATION / DEMOBILIZATION:
021001 Mobilize and Demobilize for EMERGENCY Delivery Order in Area No. 1. 1 per Delivery Order.
021002 Mobilize and Demobilize for EMERGENCY Delivery Order in Area No. 2. 1 Per Delivery Order.
021003 Mobilize and Demobilize or EMERGENCY Delivery Order in Area No. 3. 1 Per Delivery Order.
022000 REMOVALS
022001 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON STD 02.
022002 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD 04.
022003 including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Delivery Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.
022004 consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose of all other materials.
022005 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
030000 TRANSIT COSTS
030001 A. Transit from one in water work location to another in water work location on the same Delivery Order per nautical mile (NM).
1 NM
040000 REPAIRS
040001
Replace a beacon structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON
STD 12, ATON STD 13 and ATON STD 14.
040002
Replace a range structure platform either 5’x5’ or 7’x7’ on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, ATON STD 11, ATON STD 12 and ATON STD 14.
040003
Replace one damaged ladder including ladder brackets on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD
02, ATON STD 03, ATON STD 04, ATON STD 05,
ATON STD 06, and ATON STD 11.
050000 MATERIALS
050001 Provide 40 foot length of 18 inch diameter 3/8 inch wall strait seam steel pipe, priced per linear foot (LF).
1 LF
050002 Perform one (1) weld to join two (2) pieces of 18” diameter pile pipe together.
050003
Provide one fabricated pedestal base. To include all flat steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line item “050001”.
050004 Provide galvanizing of one pedestal base including base plate and 10 feet of pipe. In accordance with drawing
ATON STD 05.
050005
Provide galvanizing of 10 feet of pipe. In accordance with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD 06.
1 LFT
050006 Provide one fabricated 5’’x5’ platform in accordance with drawing ATON STD 09.
050007 Provide one fabricated 7’x7’ platform in accordance with drawing ATON STD 10.
050008 Provide one fabricated 7 foot ladder extension in accordance with drawing ATON STD 11.
050009
Provide 1 set, consisting of 2 each brackets, fabricated ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with drawing ATON STD 11.
1 Set
050010 Provide a fabricated 10 foot square 4 pile platform. In accordance with drawing ATON STD 06.
050011
Provide a fabricated unassembled 5 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
STD 08.
050012
Provide a fabricated unassembled 10 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
050013
Provide a fabricated unassembled 15 foot section of sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
050014 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
ATON STD 08.
050015 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
ATON STD 10.
050016 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
050017 Provide a fabricated set of 4 each Tower Base Column Connector Bracket, including all fasteners. As per drawing ATON STD 08.
1 SET
050018 Provide a fabricated set of 4 each splice brackets, including all fasteners. As per drawing ATON STD 08.
050019 Provide a fabricated 8KRW (8’x16’) Range Board Frame, including all fasteners. In accordance with drawing ATON STD 12.
050020 Provide a fabricated 6KRW (6’x12’) Range Board Frame, including all fasteners. In accordance with
050021 Provide a fabricated 4KRW (4’x8’) Range Board Frame, including all fasteners. In accordance with drawing
ATON STD 12.
050022 Provide a fabricated 3KRW (3’x6’) Range Board Frame, including all fasteners. In accordance with drawing
050023 Provide a manufactured cable type Safety Climb Device.
In accordance with drawing ATON STD 14.
060000 RETURN OF GOVERNMENT MATERIALS
060001
At the completion of a Delivery Order return all government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this delivery order.
070000 AS-BUILT PHOTOGRAPHS
070001
Take photographs of new structure from 3 positions 90 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)
NOTE: All photos taken under one Delivery Order may be combined on one CD.)
080000 DIVING SERVICES
080001
Diving services to search a 75 yard radius of last known position of old structure, attending retrieval process for found structure and cut of any metal pile extending above the mud line.
080002 Diving services to investigate underwater condition of underwater portion of structure. Provide written report of dive findings.
090000 FIELD ENGINEERING
090001 Perform a geodetic survey as per the requirements of
VERTICAL AND HORIZONTAL POSITIONING
METHOD.
091000 MARINE MAMMAL MONITORING
091001
Geographical Area 1 (South of Seaside, OR to the waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water. 1 EA
091002
Geographical Area 2 (South of Yaquina Head, OR to the waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary
091003
Geographical Area 3 (South of Coquille Point, OR to the waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary reporting for one ATON structure within/per body of water. 1 EA
091004
Onsite Monitoring Services/per day: Includes labor, equipment and supplies for the biologist and team to perform monitoring services on the ATON site for one 8-hour day. Applies to Geographical Areas 1,2 and 3. 1 DY
091005
Standby for Marine Mammal(s): Includes labor and equipment for the construction crew to standby while waiting for a marine mammal to vacate the construction area. 1 HR
092000 EELGRASS SURVEY
092001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary
092002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary
092003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the
092004 equipment and supplies for the biologist and team to perform eelgrass surveys on the ATON site for one 8-
TOTAL SUM OF BASE YEAR PERIOD: $__________________
100001
Option Year 1: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile
Option Year 1 from 04/01/2017 to 05/31/2018.
110000 IMPROPER CHARACTERISTIC DELIVERY ORDER
111000 MOBILIZATION / DEMOBILIZATION:
111001 Mobilize for Improper Characteristic Delivery Order in
111002 Demobilize for Improper Characteristic Delivery Order in
111003 Mobilize for Improper Characteristic Delivery Order in
111004 Demobilize for Improper Characteristic Delivery Order in
111005 Mobilize for Improper Characteristic Delivery Order in
111006 Demobilize for Improper Characteristic Delivery Order in
111007 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
111008 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
111009 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
112000 REMOVALS – IN WATER CONSTRUCTION
112001 including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
112002 including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD
112003 including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD
112004 consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose
112005 of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other
112006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
112007 submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
112008 Remove and dispose of one NON ATON piling using
112500 Removals - Shore Construction
112501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
112502
Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
112503 Remove concrete foundation up to 6 Cubic Yards.
112504 foundation. Contractor shall dispose of all other
113000 INSTALLATIONS
113100 IN WATER CONSTRUCTION - INSTALLATIONS
113101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.
113102 steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return
113103 steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary
113104 steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove
113105 install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and
113106 sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD
113107 additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD
113108
Using up to 5 Cubic Yards of concrete in accordance
113109 pedestal foundation on a break wall in accordance with
113110
Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In
113111 concrete foundation. Includes concrete pipe, rebar and
113112 concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10
113113 concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, 113114 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON
STD 03, ATON STD 04, ATON STD 05, ATON STD 06,
113115 Install one (1) NON ATON steel pile using the vibratory
113500 SHORE CONSTRUCTION - INSTALLATION
113501 Install four “H” piles to receive a sectional tower
113502 Install a concrete foundation to receive a sectional tower
113503 sectional tower assembly. In accordance with drawing
113504 Install a concrete pedestal foundation on a land location.
113505 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON
STD 03, ATON STD 04, ATON STD 05 ATON STD 06,
113506 Provide and install a chain link fence around a shore
113507 Provide and install an additional 4 linier feet of fence.
120000 EMERGENCY DELIVERY ORDERS
121000 EMERGENCY MOBILIZATION / DEMOBILIZATION:
121001 Mobilize and Demobilize for EMERGENCY Delivery
121002 Mobilize and Demobilize for EMERGENCY Delivery
121003 Mobilize and Demobilize or EMERGENCY Delivery
122000 REMOVALS
122001 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See
122002 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See
122003 including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Delivery Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.
122004 consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall
122005 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
130000 TRANSIT COSTS
130001 water work location on the same Delivery Order per
140000 REPAIRS
140001 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON
140002 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, 140003 on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD
02, ATON STD 03, ATON STD 04, ATON STD 05,
150000 MATERIALS
150001 Provide 40 foot length of 18 inch diameter 3/8 inch wall
150002 Perform one (1) weld to join two (2) pieces of 18”
150003 steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line
150004 plate and 10 feet of pipe. In accordance with drawing
150005 with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD
150006 Provide one fabricated 5’’x5’ platform in accordance with
150007 Provide one fabricated 7’x7’ platform in accordance with
150008 Provide one fabricated 7 foot ladder extension in
150009 ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with
150010 Provide a fabricated 10 foot square 4 pile platform. In
150011 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
150012 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
150013 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
150014 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
150015 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
150016 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
150017
Connector Bracket, including all fasteners. As per
150018 Provide a fabricated set of 4 each splice brackets, 150019
Frame, including all fasteners. In accordance with
150020
Frame, including all fasteners. In accordance with
150021 including all fasteners. In accordance with drawing
150022 including all fasteners. In accordance with drawing
150023 Provide a manufactured cable type Safety Climb Device.
160000 RETURN OF GOVERNMENT MATERIALS
160001 government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this delivery
170000 AS-BUILT PHOTOGRAPHS
170001 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)
NOTE: All photos taken under one Delivery Order may
180000 DIVING SERVICES
180001 position of old structure, attending retrieval process for found structure and cut of any metal pile extending
180002 underwater portion of structure. Provide written report of
190000 FIELD ENGINEERING
190001
VERTICAL AND HORIZONTAL POSITIONING
191000 MARINE MAMMAL MONITORING
191001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary
191002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary
191003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the
191004 equipment and supplies for the biologist and team to
191005 equipment for the construction crew to standby while
192000 EELGRASS SURVEY
192001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary
192002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary
192003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the
192004 equipment and supplies for the biologist and team to
TOTAL SUM OF OPTION YEAR PERIOD 1: $__________________
200001
Option Year 2: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile
Option Year 2 from 04/01/2018 to 05/31/2019.
210000 IMPROPER CHARACTERISTIC DELIVERY ORDER
211000 MOBILIZATION / DEMOBILIZATION:
211001 Mobilize for Improper Characteristic Delivery Order in
211002 Demobilize for Improper Characteristic Delivery Order in
211003 Mobilize for Improper Characteristic Delivery Order in
211004 Demobilize for Improper Characteristic Delivery Order in
211005 Mobilize for Improper Characteristic Delivery Order in
211006 Demobilize for Improper Characteristic Delivery Order in
211007 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
211008 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
211009 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
212000 REMOVALS – IN WATER CONSTRUCTION
212001 including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
212002 including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD
212003 including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD
212004 consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose
212005 of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other
212006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
212007 submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
212008 Remove and dispose of one NON ATON piling using
212500 Removals - Shore Construction
212501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
212502
Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
212503 Remove concrete foundation up to 6 Cubic Yards.
212504 foundation. Contractor shall dispose of all other
213000 INSTALLATIONS
213100 IN WATER CONSTRUCTION - INSTALLATIONS
213101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.
213102 steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board. In accordance with drawing ATON STD 02, ATON STD 10 and ATON STD 12. Remove and return
213103 steel piles, king pile, install platform, install platform ladder, and install up to 3 day boards. In accordance with drawing ATON STD 03, ATON STD 09, ATON STD 10 and ATON STD 13. Remove and return temporary
213104 steel piles, king pile, install platform, platform ladder, range board frame, range board frame support brackets, and range board. In accordance with drawing ATON STD 04, ATON STD 10 and ATON STD 12. Remove
213105 install platform, platform ladder/safety rail, and fiberglass grating, may include installing up to 3 day boards. In accordance with drawing ATON STD 06. Remove and
213106 sectional tower either a 5 feet, 10 feet or 15 feet tall including top platform with fiberglass grating. In accordance with drawing ATON STD 06 and ATON STD
213107 additional 5 foot, 10 foot or 15 foot sectional tower in accordance with drawing ATON STD 06 and ATON STD
213108
Using up to 5 Cubic Yards of concrete in accordance
213109 pedestal foundation on a break wall in accordance with
213110
Includes one 6 foot section of concrete pipe, drilling, anchoring, grouting, rebar and concrete fill. In
213111 concrete foundation. Includes concrete pipe, rebar and
213112 concrete breakwater foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing up to 3 day boards. In accordance with drawing ATON STD 05, ATON STD 09, ATON STD 10
213113 concrete breakwater foundation or submerged obstruction foundation. Includes installing pedestal, platform, one ladder extension and brackets, drilling and anchoring (if required), leveling and grouting, and installing range board frame support bracket, and range board. In accordance with drawing ATON STD 05, 213114 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02,ATON
STD 03, ATON STD 04, ATON STD 05, ATON STD 06,
213115 Install one (1) NON ATON steel pile using the vibratory
213500 SHORE CONSTRUCTION - INSTALLATION
213501 Install four “H” piles to receive a sectional tower
213502 Install a concrete foundation to receive a sectional tower
213503 sectional tower assembly. In accordance with drawing
213504 Install a concrete pedestal foundation on a land location.
213505 foot ladder extension including bolting ladder extension brackets to ladder and attaching ladder extension assembly to the structure with “U” bolts. In accordance with drawings ATON STD 01, ATON STD 02, ATON
STD 03, ATON STD 04, ATON STD 05 ATON STD 06,
213506 Provide and install a chain link fence around a shore
213507 Provide and install an additional 4 linier feet of fence.
220000 EMERGENCY DELIVERY ORDERS
221000 EMERGENCY MOBILIZATION / DEMOBILIZATION:
221001 Mobilize and Demobilize for EMERGENCY Delivery
221002 Mobilize and Demobilize for EMERGENCY Delivery
221003 Mobilize and Demobilize or EMERGENCY Delivery
222000 REMOVALS
222001 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See
222002 including platform assembly, ladder extensions under EMERGENCY Delivery Order. Remove and return all ATON hardware, platform, and ladders if reusable.
Contractor shall dispose of all other materials. See
222003 including pile platform assembly, ladder extensions and sectional lower assembly under EMERGENCY Delivery Order. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable.
222004 consisting of multiple pile members, platform assembly, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall
222005 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings under EMERGENCY Delivery Order. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
230000 TRANSIT COSTS
230001 water work location on the same Delivery Order per
240000 REPAIRS
240001 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure and install up to 3 day boards. In accordance with drawing ATON STD 01, ATON STD 03, ATON STD 05, ATON STD 11, ATON
240002 on either a one (1) pile structure, a three (3) pile structure or a pedestal structure. Including new range board frame and new range board. In accordance with drawing ATON STD 02, ATON STD 04, ATON STD 05, 240003 on either a one (1) pile structure, a three (3) steel pile structure a pedestal structure or a four (4) pile structure, In accordance with drawing ATON STD 01, ATON STD
02, ATON STD 03, ATON STD 04, ATON STD 05,
250000 MATERIALS
250001 Provide 40 foot length of 18 inch diameter 3/8 inch wall
250002 Perform one (1) weld to join two (2) pieces of 18”
250003 steel and welding. In accordance with drawing ATON STD 05. NOTE: Steel pipe will be cost out using line
250004 plate and 10 feet of pipe. In accordance with drawing
250005 with drawings ATON STD 01. ATON STD 02, ATON STD 03, ATON STD 04, ATON STD 05 and ATON STD
250006 Provide one fabricated 5’’x5’ platform in accordance with
250007 Provide one fabricated 7’x7’ platform in accordance with
250008 Provide one fabricated 7 foot ladder extension in
250009 ladder extension brackets; of either LEB 5x5-1, LEB 5x5-3, LEB 7x7-1, LEB 7x7-3 or LEB 10x10-1. Includes bracket, hoop and fasteners. In accordance with
250010 Provide a fabricated 10 foot square 4 pile platform. In
250011 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
250012 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
250013 sectional tower. Includes tower members, platform assembly, and 4 each tower base column connectors and all fasteners. In accordance with drawing ATON
250014 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
250015 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
250016 sectional tower, includes 4 each splice plates and all fasteners. (Does not include platform assy. or tower base column connectors) In accordance with drawing
250017
Connector Bracket, including all fasteners. As per
250018 Provide a fabricated set of 4 each splice brackets, 250019
Frame, including all fasteners. In accordance with
250020
Frame, including all fasteners. In accordance with
250021 including all fasteners. In accordance with drawing
250022 including all fasteners. In accordance with drawing
250023 Provide a manufactured cable type Safety Climb Device.
260000 RETURN OF GOVERNMENT MATERIALS
260001 government materials; ATON equipment, batteries (must be double bagged in plastic), usable platforms, ladders and brackets, and temp buoys to the ANT responsible for the structures built under this delivery
270000 AS-BUILT PHOTOGRAPHS
270001 degrees apart of completed new construction. Provide 3 CD’s of photographs. (Photos of one structure on 3 each CD’s will be used for evaluation purposes only.)
NOTE: All photos taken under one Delivery Order may
280000 DIVING SERVICES
280001 position of old structure, attending retrieval process for found structure and cut of any metal pile extending
280002 underwater portion of structure. Provide written report of
290000 FIELD ENGINEERING
290001
VERTICAL AND HORIZONTAL POSITIONING
291000 MARINE MAMMAL MONITORING
291001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary
291002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the necessary
291003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and a biological monitor as well as the
291004 equipment and supplies for the biologist and team to
291005 equipment for the construction crew to standby while
292000 EELGRASS SURVEY
292001 waters north of Yaquina Head, OR, including inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary
292002 waters north of Coquille Point, OR, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the necessary
292003 waters north of the California-Oregon border, including all inlets, bays, and waterways.): Mobilization of a boat, operator and an eelgrass monitor as well as the
292004 equipment and supplies for the biologist and team to
TOTAL SUM OF OPTION YEAR PERIOD 2: $__________________
300001
Option Year 3: Provide all labor, materials, equipment, transportation, and supervision for the Term Pile
Option Year 3 from 04/01/2019 to 05/31/2020.
310000 IMPROPER CHARACTERISTIC DELIVERY ORDER
011000 MOBILIZATION / DEMOBILIZATION:
311001 Mobilize for Improper Characteristic Delivery Order in
311002 Demobilize for Improper Characteristic Delivery Order in
311003 Mobilize for Improper Characteristic Delivery Order in
311004 Demobilize for Improper Characteristic Delivery Order in
311005 Mobilize for Improper Characteristic Delivery Order in
311006 Demobilize for Improper Characteristic Delivery Order in
311007 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
311008 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
311009 land construction of line items in sections 012500 Removals Shore Construction and 013500 Shore
312000 REMOVALS – IN WATER CONSTRUCTION
312001 including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 01 and ATON
312002 including platform assembly, ladder extensions.
Remove and return all ATON hardware, platform, and ladders if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 03 and ATON STD
312003 including pile platform assembly, ladder extensions and sectional lower assembly. Remove return and all ATON hardware, pile platform, ladders and sectional tower parts if reusable. Contractor shall dispose of all other materials. See drawings ATON STD 06 and ATON STD
312004 consisting of one (1) or multiple driven pile members, including platform assembly, ladders and bindings.
Remove and return all ATON hardware and metal platform, if used and reusable. Contractor shall dispose
312005 of multiple driven pile members, including platform assembly, ladders and bindings. Remove and return all ATON hardware. Contractor shall dispose of all other
312006 of multiple driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
312007 submerged obstruction, consisting of a steel pipe and platform. Remove and return all ATON hardware.
312008 Remove and dispose of one NON ATON piling using
312500 Removals - Shore Construction
312501 driven pile members a platform assembly, sectional steel tower, ladders and bindings. Remove and return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
312502
Return all ATON hardware and reusable sectional tower components. Contractor shall dispose of all other
312503 Remove concrete foundation up to 6 Cubic Yards.
312504 foundation. Contractor shall dispose of all other
313000 INSTALLATIONS
313100 IN WATER CONSTRUCTION - INSTALLATIONS
313101 steel pile, install platform, platform ladder, and up to 3 day boards in accordance with drawing ATON STD 01, ATON STD 09, ATON STD 10 and ATON STD 13.
313102 steel pile, install platform, platform ladder, range board frame, range board frame support bracket, and range board.