IFB.HSCG8816BPQQ034.Solicitation_Amendment_0001_(MYAC_ATON_Southern_Oregon).SF-30._Word.pdf

PDF 46 KB Posted

Attached to
INDEFINITE DELIVERY-INDEFINITE QUANTITY CONTRACT FOR MULTI-YEAR ATON STRUCTURES REPLACEMENT FOR SOUTHERN OREGON
Solicitation number
HSCG88-16-B-PQQ034
Issued by

About this file

IFB.HSCG8816BPQQ034.Solicitation Amendment 0001 (MYAC ATON Southern Oregon).SF-30.Word doc

View the file

Other files

File Type Posted
IFB.HSCG8816BPQQ034.Amend_Solicitation_Offer_ _Offer_Award_SF-1442_(REV._82014)_(MYAC_ATON_Southern_Oregon).pdf PDF
IFB.HSCG8816BPQQ034.Solicitaion_Amendment_0002.(MYAC_ATON_Southern_Oregon).SF-30.pdf PDF
IFB.HSCG8816BPQQ034.Contractor_Request_for_Clarification.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
IFB.HSCG8816BPQQ034.Solicitation_Amendment_0001_(MYAC_ATON_Southern_Oregon).SF-30.pdf PDF
IFB.HSCG8816BPQQ034.Specification_Amendment_0001.(MYAC_ATON_Southern_Oregon).Final.pdf PDF
IFB.HSCG8816BPQQ034.Appendix_B_Marine_Mammal_Monitoring.pdf PDF
IFB.HSCG8816BPQQ034.Appendix_A_Oregon_Fish_ _Wildlife_In_Water_Work_Windows.pdf PDF
ATON-STD 06 sheet 1 of 3 Platform 10x10.tif TIF image
IFB.HSCG8816BPQQ034.Solicitation.(MYAC_Structures_Replacement_Southern_Oregon).01-28-2016.pdf PDF
ATON-STD 12 sheet 2 of 4.pdf PDF
ATON-STD 06 sheet 2 of 3.pdf PDF
IFB.HSCG8816BPQQ034.Contractor_Responsibility_Questionaire.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
ATON-STD 12 sheet 3 of 4.pdf PDF
ATON-STD 11 sheet 1 of 1 Ladder Details.pdf PDF
IFB.HSCG8816BPQQ034.WageRate(Lincoln_County_for_Yaquina_Bay).OR150072.07-03-2015.OR72.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD 03 sheet 1 of 1 Three Pile.tif TIF image
ATON-STD-08 sheet 5 of 6 7x7 Tower.tif TIF image
ATON-STD-08 sheet 2 of 6 7x7 Tower.tif TIF image
IFB.HSCG8816BPQQ034.WageRate(Tillamook_County).OR150076.07-03-2015.OR76.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
IFB.HSCG8816BPQQ034.Contractor_Request_for_Clarification.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
ATON-STD 01 sheet 1 of 1 Single Pile.tif TIF image
ATON-STD 12 sheet 4 of 4.pdf PDF
ATON-STD 05 sheet 1 of 2 Pedestals Bases.pdf PDF
ATON-STD 04 sheet 1 of 1 Three Pile Range.tif TIF image
IFB.HSCG8816BPQQ034.Specs(PSN-7337310).(MYAC_Structures_Replacement_Southern_Oregon).doc.pdf PDF
IFB.HSCG8816BPQQ034.WageRate(CoosCounty).OR150064.07-03-2015.OR64.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD-08 sheet 6 of 6 7x7 Tower.tif TIF image
ATON-STD 15 sheet 1 of 1 Subcable.tif TIF image
ATON-STD 10 sheet 1 of 1 7x7 Platform.tif TIF image
ATON-STD 12 sheet 1 of 4 Range Board Frames.pdf PDF
ATON-STD-08 sheet 4 of 6 7x7 Tower.tif TIF image
IFB.HSCG8816BPQQ034.Solicitation_Offer_ _Offer_Award_(SF-1442).(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
ATON-STD-09 sheet 1 of 1 5x5 Platform.pdf PDF
ATON-STD 14 sheet 1 of 1 Safety Climb.tif TIF image
ATON-STD-02 sheet 1 of 1 Single Pile Range.pdf PDF
ATON-STD 05 sheet 2 of 2 Pedestals Bases.tif TIF image
ATON-STD 06 sheet 3 of 3.tif TIF image
IFB.HSCG8816BPQQ034.Forecast.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD-08 sheet 1 of 6 7x7 Tower.tif TIF image
ATON-STD 07 sheet 1 of 3 H-Pile.tif TIF image
ATON-STD 07 sheet 3 of 3.tif TIF image
ATON-STD-08 sheet 3 of 6 7x7 Tower.tif TIF image
IFB.HSCG8816BPQQ034.Historical_Information.(MYAC_Structures_Replacement_Southern_Oregon).pdf PDF
IFB.HSCG8816BPQQ034.WageRate(Curry_County_for_Brookings).OR150065.07-03-2015.OR65.(MYAC_Structures_Replacement_Southern_Oregon).pdf.pdf PDF
ATON-STD-13 sheet 1 of 1 Dayboards.pdf PDF
ATON-STD 07 sheet 2 of 3.tif TIF image
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment/Mod # Effective Date: Amendment of Solicitation #: Page#:

0001 02/23/2016 HSCG88-16-B-PQQ034 2 of 2

SOUTHERN OREGON MAYC (ATON) STRUCTURES REPLACEMENT; PSN-7337310:

Q1. Section 013529, par. 1.02 states, “The contractor shall obtain all necessary local, state and federal permits required for the work described in the delivery order.” In subparagraphs C there is further language indicating that the contractor is to obtain in-water work permits/authorizations for this work. Historically, all such permitting has been handled by the Coast Guard. It seems that the Coast Guard should continue to handle that as it bears more clout than a single marine contractor. If the contractor is to secure all such permits, will a CLIN be provided for pricing such effort?

USCG RESPONSE: THE COAST GUARD WILL OBTAIN ALL NECESSARY LOCAL, STATE,

AND FEDERAL PERMITS REQUIRED. PARAGRAPH 1.02 UNDER SECTION 01 35 29 SHALL

BE REMOVED. SEE ATTACHED REVISED SPECIFICATION TO REFLECT THIS CHANGE.

Q2. Section B “Schedule of Prices” includes 59 pages of bid forms to be filled out. Would it be acceptable to replicate this form using Microsoft Excel then print out the completed forms for submission with our bid?

This will reduce the possibility of math errors.

USCG RESPONSE: IT IS ACCEPTABLE TO REPLACATE THE SECTIN B “SCHEDULE OF

PRICES” FORM USING MICROSOFT EXCEL AS TO MIRROR THE SAME OF ALL CLIN LINE

ITEMS, DESCRIPTIONS, AND LINE ITEM COSTS FIELDS.

----END OF DOCUMENT----

File details come from the government source that posted it. Updated .