DOCKSIDE REPAIRS OF CGC MIDGETT FY 18
Solicitation number
HSCG85-18-R-P45G41
Issued by

About this file

ATTACHMENT 1 - SPECIFICATION

View the file

Other files

File Type Posted
PAGE_2_-_AMEND._002.doc DOC document
SF30-A002.pdf PDF
SF30-A001.pdf PDF
PAGE_2_-_AMEND._001.doc DOC document
ATTACHMENT_4_-_Request_for_Clarification_Form.doc DOC document
ATTACHMENT_3_-_SCHEDULE_OF_ITEMS_-_PRICES.doc DOC document
ATTACH._2-Continuation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC MIDGETT (WHEC 726)

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2018

Developed By: Leemelvin D Gavino

(Rev-0, 26 April 2017)

USCGC MIDGETT (WHEC-378W) DOCKSIDE AVAILABILITY FY2018

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items .......................................................................................... viii Principal Characteristics ............................................................................................................................... ix General Requirements WORK ITEM 1: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect WORK ITEM 2: Tanks (Ballast), Clean and Inspect WORK ITEM 3: Evaporator (General), Overhaul WORK ITEM 4: Potable Water Pneumatic Tank(s), Clean and Inspect WORK ITEM 5: Commissary Hoist, Level 2 Inspect and Repair WORK ITEM 6: Anchor Windlasses, Level 2 Inspect and Repair WORK ITEM 7: Warping Capstan, Service and Inspect WORK ITEM 8: Oily Water Separator, Overhaul WORK ITEM 9: Tank, Preserve Partial (Optional) WORK ITEM 10: Insulation Renewal, Various Locations WORK ITEM 11: Deck Covering (Interior Wet), Renew iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 378-FRAM-W 117-11, Rev -, Forepeak Coast Guard Drawing 378-FRAM-W 131-1, Rev -, Main Deck Plating & Framing Forward Coast Guard Drawing 378-FRAM-W 131-2, Rev -, Main Deck Plating & Framing Aft Coast Guard Drawing 378-FRAM-W 132-1, Rev A, 2nd Deck Plating & Framing Forward Coast Guard Drawing 378-FRAM-W 508-1, Rev C, Insulation Schedule Coast Guard Drawing 378-FRAM-W 521-2, Rev C, Diagram Countermeasure Washdown Coast Guard Drawing 378-FRAM-W 533-1, Rev F, Potable and Freshwater Service System Diagram Coast Guard Drawing 378-FRAM-W 533-2, Rev H, Potable Water System in Machinery Space Coast Guard Drawing 378-FRAM-W 533-4, Rev G, Diagram - Distillation Plant Piping Coast Guard Drawing 378 FRAM-W 572-2, Rev F, Commissary Hoist Control System Wiring Diagram Coast Guard Drawing 378-FRAM-W 572-3, Rev A, Commissary Hoist Arrangement & Details Coast Guard Drawing 378 FRAM-W 572-4, Rev -, Outline Commissary Hoist Coast Guard Drawing 378 FRAM-W 572-5, Rev -, Section & Assembly Commissary Hoist Coast Guard Drawing 378 FRAM-W 572-6, Rev -, Mech Bill of Material List for Commissary Hoist Coast Guard Drawing 378-FRAM-W 581-6, Rev -; Capstan – Windlass Assy Coast Guard Drawing 378-FRAM-W 582-14, Rev -, Warping CAPSTAN Assembly Coast Guard Drawing 378-FRAM-W 582-15, Rev-, Warping CAPSTAN Assembly Coast Guard Drawing 378-FRAM-W 635-1, Rev M, Insulation a&D Coast Guard Drawing 378-FRAM-W 801-1, Rev J, Booklet of General Plans http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)

NAVSEA Drawing 803-1385828, Rev P, Nozzles AFFF and Washdown Systems

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 2718, SWBS 555, Jun 2006, Fire extinguishing Systems (270

WMEC A-Class) Coast Guard Technical Publication (TP) 3274, SWBS 531, May 1997, Distillation Plant, Riley Beaird, Inc. Six Stage Flash Type, 10,000 Gpd, Model TU-106 H.

Coast Guard Technical Publication (TP) 3280A, Feb 2007, Manufacturers Instruction Book, SWBS

Group(s) 572-582, 378’ WHEC Class Cutters Coast Guard Technical Publication (TP) 3280A, Manufacturers Instruction Book, SWBS Group(s) 572-

Coast Guard Technical Publication (TP) 3280A; Feb 2007, Manufacturers Instruction Book, SWBS

Group(s) 572-582 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC

Electrical Motors Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets Brush Drive Assembly Oily Water Separator HELI-SEP Models 10000B; Dwg 10008B Brush Shaft Assembly HELI-SEP Model 10000B, Dwg 10007B2 Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Specification HH-P-151, Rev F, Not 1; Packing, Rubber Sheet, Cloth Insert Federal Specification QQ-N-281, Rev D, Amend 2; Nickel-Copper-Aluminum Alloy, Wrought (UNS)

N05500 MIL-DTL-1222, Rev J; Studs, Bolts, Screws and Nuts for Applications Where a High Degree of

Reliability Is Required MIL-F-1183, Rev J, Sup 1; Fittings, Pipe, Cast Bronze, Silver-Brazing, General Specifications for MIL-PRF-1149, Rev D; Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness vi (Rev-0)

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.15 (SSPC-SP 15), 2004, Commercial Grade Power Tool Cleaning vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

3 Y Condenser, Tube

Bundle 4420-01-555-8707 / 97622-

6 11,892.20

8 N Polypropylene Beads 4330-01-534-8618 /

FMPB0001

600 lbs 7,524.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center viii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

6 Anchor Windlasses, Level 2 Inspect and Repair ix (Rev-0)

PRINCIPAL CHARACTERISTICS

378 WHEC (W-CLASS: MIDGETT)

PHYSICAL

Length overall 378' 3" Length between perpendiculars 350' 0" Maximum beam (@ 13' 6" dwl) 42' 0" Beam @ main deck 42' 0" Depth 26' 3/8" Main deck camber 6" in 21' 0" Minimum berth depth 30' 0" Height of highest projection 116' Draft, fwd @ full load 14.78' Draft, aft @ full load 15.61' Draft, fwd @ minimum operating 14.63' Draft, aft @ minimum operating 15.33' Full load displacement 3313 long tons Minimum operating displacement 2762 long tons Light ship displacement 2433 long tons

HULL

Frame spacing 1' 0" Material Deckhouse, fwd of frame 96 HY-100 Steel Main deck frames 183 to 242-1/2 and fwd of FR 96

HY-80 Steel

01 level frames 183 to 316 HY-80 Steel Lower hull around bow thruster, port and starboard strakes A-3 and A-4, frames 56 to 96

HY-80 Steel

Masts and superstructure above the 01 deck

Type 3456 Aluminum

Remaining ASTM A-131

MACHINERY

Type of propulsion CODOG Two diesel engines Fairbanks More 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total Two gas turbines Pratt and Whitney FT4A-2; 36,000 SHP total Two controllable pitch propellers Escher Wyss 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines Two reduction gears Western Gear Electrical characteristics Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room) One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators x (Rev-0)

TANK CAPACITIES

Diesel oil 192,858 gal. (95%) Fresh water 17,695 gal. (100%) JP-5 fuel 27, 603 gal. (95%)

1 (Rev-0)

00000_1216_FLT

REC_00000_FLT_Commercial Project @ CG Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. Coast Guard Base Seattle is a Large Quantity Generator of Hazardous Waste and holds a WA State Department of Ecology permit.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

• Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

3 (Rev-0)

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

4 (Rev-0)

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:

SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for over coating or for system service resumption (see paragraph

3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for over coating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

COATING MFG PRODUCT NAME BATCH

INDUCTION

TIME

COATING SYSTEM SEQUENCE

(PRIMER/TOUCHUP/3RD COAT, ETC.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,

ROLLED)

AVERAGE DFT

11 (Rev-0)

12300_0316_FLT

REC_12311_FLT_378’ WHEC ‘W’ Class (ALL) (0310)

WORK ITEM 1: Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

TYPE OF TANK LOCATION CAPACITY -

95%

(GALLONS)

LOW SUCTION (GALLONS)

Diesel Storage 5-144-1-F 8,060 255

Diesel Overflow 5-136-1-F 3,497 110

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 378 FRAM-W 801-1, Rev J, Booklet of General Plans

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

OTHER REFERENCES

Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS)

C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets

12 (Rev-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

• Fuel

• Piping

• Tank access cover

3.1.4.1 The Contractor shall remove all remaining tank contents (approximately 2% of original CAPACITY - 95%), after the existing tank contents have been emptied by the vessel’s crew until loss of suction (using the vessel’s existing transfer systems). Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.

3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations (see 4.2 (Tank content restoration)).

NOTE

Vessel may come in with less tank fluid contents than specified above.

Initial and post repair operational tests apply only to tanks that possess TLIs.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

13 (Rev-0)

3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard personnel test TLIs for tanks listed in paragraph 1.1 (Intent) to demonstrate existing operational condition. Submit a CFR.

3.1.6 Plug log. The Contractor shall keep a written record of all plugs put in any tank vents. A separate list shall be kept for each tank being entered.

3.1.6.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.1.6.2 The plug log shall be available to the Coast Guard Inspector when the inspector is performing his close-out inspection on each tank.

3.2 Cleaning requirements. The Contractor shall refer to Coast Guard Drawing 378 FRAM-W 801-001 for guidance. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths.

3.3 Tank content and waste disposal. The Contractor shall dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.

3.4 Inspection. The Contractor shall visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Tank structural condition.

• Inaccessible areas.

• Condition of tank coating, including; measurements taken, percentage, location, and type of coating failure (if tank interior surfaces are coated).

• Tank level indicator (TLI) and/or float switch condition, as applicable.

• Sounding/vent tube and striker plate condition (including vent check valve and waster piece).

• Suction and discharge piping condition.

• Fastener material and condition (correct fastener material is stainless steel).

3.4.2 Measure up to 10 “pits” within each tank as designated by the Coast Guard Inspector using a Contractor supplied ‘Pit Gauge’. Include pit measurement results in CFR specified above, showing where pit measurements were taken and the depth of the pit.

3.5 Tank closing. The Contractor shall ensure that the tank(s) remain open for at least 24 hours after completion of any KO-authorized repair and preservation procedures. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183. Chase threads on studs to ensure even installation of the access covers. Renew any damaged nuts.

14 (Rev-0)

3.5.1 The Contractor shall renew 100% of nuts and washers.

3.6 Operational test – post repairs. After completion of work, the Contractor shall witness Coast Guard personnel test all designated tank TLIs and vent check valves to prove satisfactory operating condition. Submit a CFR.

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.7 Ultrasonic thickness (UT) measurement. The Contractor shall take a total of 50 UT measurements of tank plating, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.

4. NOTES

4.1. Coast Guard personnel. Coast Guard personnel will operate all shipboard machinery and equipment.

4.2 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.

4.3 Tank inspection. The Coast Guard Inspector will visually inspect the tank interior immediately prior to closing.

4.4 Tank content restoration. The Ship’s force will procure new fluids and refill all tanks at the appropriate time.

15 (Rev-0)

12316_0316_FLT

REC_12316_FLT_378’ WHEC ‘W’ Class (ALL) (0310)

WORK ITEM 2: Tanks (Ballast), Clean and Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):

TABLE 1 - TANKS

TYPE OF STRUCTURE LOCATION CAPACITY - 95%

(GALLONS)

LOW SUCTION

Forepeak Ballast Tank 4-D-0-W 7,123 214

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 378 FRAM-W 117-11, Rev -, Forepeak Coast Guard Drawing 378 FRAM-W 801-1, Rev J, Booklet of General Plans

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet

Gaskets

16 (Rev-0)

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.1.5 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast Guard Personnel perform an initial operational test of the TLI’s for tanks listed in paragraph 1.1 (Intent), to demonstrate existing operational condition. Submit a CFR.

3.1.6 Plug log. The Contractor shall keep a written record of all plugs put in any tanks vents. A separate list shall be kept for each tank being entered.

3.1.6.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.1.6.2 The plug log shall be available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.

3.2 Content removal. The Contractor shall remove access cover(s); remove and dispose of all fluids and/or residues in accordance with all applicable Federal, state, and local regulations. Plug all inlet and outlet piping in the tank to prevent contaminants from entering the tank. Use plugs with an attached lanyard, ring or other system that will ensure plugs are not lost in the pipe openings. Maintain a plug accountability log outside the tank(s) to prevent any of the installed temporary plugs from being lost inside the tank or forgotten inside at tank closure.

3.3 Cleaning. The Contractor shall clean the designated structure’s (see paragraph 1.1 (Intent)) interior surfaces free of all foreign materials, such as sediment, sludge and fungal growth.

Remove all persistent residues, taking care not to damage the tank coating system. Remove cleaning media and residues continuously from the compartment during the washing process.

Remove any residual wash media and wipe up residual moisture with clean lint-free cloths.

Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance

17 (Rev-0) with all Federal, state, and local regulations. The Contractor shall refer to Coast Guard Drawing 378 FRAM-W 801-001 for guidance.

3.4 Inspection. The Contractor shall visually inspect all interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:

• Structural condition.

• Inaccessible areas, if any.

• Condition of coating, including measurements taken, percentage, location, and type of coating failure.

• Tank level indicator (TLI) and/or float switch condition.

• Sounding tube and striker plate condition.

• Suction and discharge piping condition.

• Fastener material (stainless steel) and condition.

3.5 Closing. The Contractor shall ensure that the compartment(s) remain open for at least 24 hours after completion of any KO-authorized tank repairs and preservation. Notify the COR at least 24 hours prior to closing the compartment(s). After satisfactory inspection by the Coast Guard Inspector, and completion of all authorized repairs, close the manhole cover(s) with new gasket material conforming to ASTM D1330 and new cotton grommets on each stud (as applicable).

Coast Guard personnel will operate all shipboard machinery and equipment.

3.6 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the designated tank TLI’s to be in satisfactory operating condition. Submit a CFR.

3.7 Ultrasonic thickness (UT) measurement. The Contractor shall take a total of 50 UT measurements of tank plating, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Use Coast Guard Drawing 378 FRAM-W 117-011 as guidance. Submit a CFR.

4. NOTES

This section is not applicable to this work item.

18 (Rev-0)

53100_JAH_1114_378

WORK ITEM 3: Evaporator (General), Overhaul

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to overhaul, clean, and test the evaporator and associated components.

1.2 Government-furnished property.

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

Y Condenser, Tube Bundle 4420-01-555-8707 / 97622-03 6 11,892.20

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 378 FRAM-W 533-4, Rev G, Diagram - Distillation Plant Piping

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3274, SWBS 531, May 1997, Distillation Plant, Riley Beaird, Inc. Six Stage Flash Type, 10,000 Gpd, Model TU-106 H.

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

American National Standards Institute/American Water Works Association

(ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities Federal Specification HH-P-151, Rev F, Not 1; Packing, Rubber Sheet, Cloth Insert Federal Specification QQ-N-281, Rev D, Amend 2; Nickel-Copper-Aluminum Alloy, Wrought (UNS) N05500 MIL-F-1183, Rev J, Sup 1; Fittings, Pipe, Cast Bronze, Silver-Brazing, General

Specifications for

19 (Rev-0)

MIL-PRF-1149, Rev D; Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness

MIL-DTL-1222, Rev J; Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences in way of work include, but are not limited to the below-listed:

• Insulation.

• Leslie Steam Regulating Valve

3.1.4 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4.1 All openings in the evaporator shell and piping systems shall be sealed with blank flanges and gaskets, and secured with at least three bolts when not being actively worked on.

3.1.4.2 The contractor shall tarp and mask to ensure that water does not drain to ship’s bilges.

3.2 Long lead-time parts. Past experience by the Coast Guard has revealed that the evaporator parts have long lead time (between 4 and 10 weeks). To prevent delays caused by late part ordering, the Contractor shall open and inspect all items on the evaporator within the first two weeks of the availability.

3.3 Cleaning. The Contractor shall accomplish the following for the evaporator.

3.3.1 Seal all openings in the piping systems to and from the evaporator and the evaporator shell.

Chemically clean the interior of the evaporator shell in accordance with the procedures outlined

20 (Rev-0) in TP 3274. Upon completion of cleaning, remove and dispose of all cleaning solutions in accordance with all Federal, state and local regulations.

3.3.2 Provide exhaust ventilation to exhaust all vapors safely outside the cutter.

NOTE

Observe all safety precautions and procedures during handling of the cleaning materials/solutions in accordance with manufacturer’s instructions. Immediately neutralize and cleanup any spills.

3.4 Evaporator disassembly and inspection. The Contractor shall accomplish the following in accordance with TP 3274.

3.4.1 Tag and remove all lagging and insulation on the distiller, heat exchangers and affected piping. Save as templates for fabrication of new insulation upon completion of overhaul of the evaporator.

3.4.2 Open the evaporator shell. In the presence the Coast Guard Inspector, inspect the interior of the evaporator shell, including demister screens. All soft and hard fouling shall be removed from the interior side of the evaporator. Mechanically clean it as necessary to remove any additional fouling not removed by chemical cleaning. Submit a CFR.

3.4.3 Remove all distiller access plates, stage condenser heads, top covers, front covers, side covers, kidney plates, and sight windows (also known as view ports, bulls eyes, or sight glasses).

3.4.4 Remove the six vapor separators from the distiller and discard as scrap.

3.4.5 Inspect the baffle plates, distillate trays, all tube sheets and structure in the distiller shell for cracks, holes or broken weld seams in the presence of the Coast Guard Inspector. Inspect all covers and opening flanges for warping using a straight edge in the presence of the Coast Guard Inspector. Submit a CFR.

3.4.6 Inspect all studs and fasteners on the distiller for signs of deterioration, corrosion, cracking of the threaded hole, and incorrect material. All studs and fasteners shall be silicon bronze.

Submit a CFR.

3.4.7 Remove, clean, and inspect the five orifice plates on the evaporator. Submit a CFR.

NOTE

Orifice plates to be removed are of different sizes; therefore, each plate shall be accurately labeled immediately following removal.

3.5 Valve requirements. The Contractor shall accomplish the following using Coast Guard Drawing 378 FRAM-W 533-004 as guidance.

3.5.1 Overhaul.

3.5.1.1 Drain and dispose of all SSDG jacket water in accordance with all local, state, and federal laws and regulations.

21 (Rev-0)

The engine jacket water contains NALCOOL additive.

3.5.1.2 Remove, clean, inspect, and overhaul the six (6) SSDG waste heat isolation valves.

Provide and install new valve boots/seats. Renew all disturbed O-rings using certified manufacturer’s parts.

TABLE 1 – VALVES FOR OVERHAUL

SIZE

(inches) TYPE DESIGNATION DESCRIPTION

3 Butterfly 3-244-1-GJW Distiller Heat Exchanger (return) to Dsl Gen 1 Jacket Water Cooler

3 Butterfly 3-244-2-GJW Distiller Heat Exchanger (return) to Dsl Gen 2 Jacket Water Cooler

3 Butterfly 3-246-3-GJW Dsl Gen 1 Distiller Heat Exchanger Bypass 3 Butterfly 3-247-2-GJW Dsl Gen 2 Distiller Heat Exchanger Bypass 3 Butterfly 3-247-4-GJW Dsl Gen 2 (supply) to Distiller Heat Exchanger 3 Butterfly 3-247-3-GJW Dsl Gen 1 (supply) to Distiller Heat Exchanger

3.5.2 Replacement and renewal.

3.5.2.1 Remove and replace the following valves with a 150 lbs rating bronze body with monel trim. Valve connections shall be flanged or union end silver brazed ends. Replace the existing 2 1/2” gate brine overboard (3-247-3) and 2” gate brine recirculation (3-249-1) valves with a GLOBE valve type. Modify existing piping, ie. cut section of existing piping to accommodate installation of the replacement valves.

TABLE 2 – VALVES FOR RENEWAL

SIZE

(inches) TYPE DESIGNATION DESCRIPTION

2½” Globe 3-252-3 Evaporator Discharge 1½” Globe 3-252-5 Chem Flush Inlet 2½” Gate 3-247-3 Brine Overboard 2” Gate 3-249-1 Brine Recirc

2½” Gate 3-248-1 Feedwater Bypass 1½” Gate Chem Flush Brine Outlet

3.5.2.2 Renew all bolting hardware and software. Provide all necessary bronze brazed type fittings per MIL-F-1183, monel bolting fasteners per QQ-N-281, and synthetic rubber sheet gaskets per MIL-PRF-1149 or synthetic rubber cloth inserted per HH-P-151 to complete the installation.

NOTE

An alternate gasket material shall be man-made non-asbestos compressed fiber gaskets of the same size as those removed. Suitable materials include, but are not limited to, Garlock 3400, Chesterton 195, Accord 533N, and John Crane 2160.

22 (Rev-0)

3.5.3 System replenishment. After all authorized repairs and reassembly, refill the SSDG jacket water systems with distilled water upon completion of this item.

NOTE

The Cutter will provide and add the NALCOOL jacket water treatment.

3.6 Pump requirements.