REQUEST FOR PROPOSAL
SOLICITATION NO. HSCG85-18-R-P45G41
Dockside Repairs of CGC MIDGETT (WHEC 726)
ATTACHMEN 3 – Schedule of Items
SCHEDULE OF ITEMS – PRICES
Provide all labor, materials, and equipment, except as specified, to perform DOCKSIDE REPAIR OF CGC MIDGETT (WHEC 726) during the period of 05 December 2017 through 26 January 2018. All work will be performed at the cutter’s home moorage facility in Seattle, WA.
NOTE: Award of this procurement will be made contingent to funds availability. FAR 52.232-18, Availability of Funds (APR 1984), is hereby incorporated by reference (see page 4, Attachment 2, Continuation of Combined Synopsis /Solicitation – Clauses). No award will be made until funds are available.
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
CLIN 0001 - DEFINITE ITEMS
| D-ITEM NO. |
| Description |
| QTY |
| UNIT |
| AMOUNT |
| D-01 |
| Tanks (MP Fuel Stowage & Overflow) Clean & Inspect |
| 1 |
| JOB |
| $ |
| D-02 |
| Tank (Ballast) Clean & Inspect |
| 1 |
| JOB |
| $ |
| D-03 |
| Evaporator (General), Overhaul |
| 1 |
| JOB |
| $ |
| D-04 |
| Potable Water Pneumatic Tank (s) Clean & Inspect |
| 1 |
| JOB |
| $ |
| D-05 |
| Commissary Hoist, Level 2 Inspect & Repair |
| 1 |
| JOB |
| $ |
| D-06 |
| Anchor Windlasses, Level 2 Inspect & Repair |
| 1 |
| JOB |
| $ |
| D-07 |
| Warping Capstan, Service & Inspect |
| 1 |
| JOB |
| $ |
| D-08 |
| Oily Water Separator, Overhaul |
| 1 |
| JOB |
| $ |
| D-10 |
| Insulation Renewal, Various Locations |
| 1 |
| JOB |
| $ |
| D-11 |
| Deck Covering (Interior Wet) Renew |
| TOTAL AMOUNT OF DEFINITE ITEMS |
| $ |
CLIN 0002 – OPTIONAL ITEM
Optional item(s) listed under CLIN 0002 of the Schedule of Items may be awarded if inspection reports reveal the necessity for activation, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 14 November 2017, the Contractor shall have the right to refuse to accept the award of such Optional Items.
| O-ITEM NO. |
| Description |
| QTY |
| UNIT |
| AMOUNT |
| O-09 |
| Tank Preserve Partial |
| 1 |
| JOB |
| $ |
| O-09(a) |
| Tank Preserve Partial |
| 1 |
| JOB |
| $ |
| O-09(b) |
| Tank Preserve Partial |
| 1 |
| JOB |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEM |
| $ |
| TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS |
| $ |
CLIN 0003 - COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (17) entitled “COMPOSITE LABOR HOUR RATE.”
| LABOR HOUR RATE |
| ESTIMATED QUANTITY** |
| EXTENDED AMOUNT* |
| $__________ |
| per hour |
| 463 hours |
| $________________ |
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.