Amend._002.doc
DOC document 31 KB Posted
- Attached to
- Dockside Repairs of CGC ALEX HALEY (WMEC 39)
- Solicitation number
- HSCG85-18-R-P45002
About this file
Page 2 of Amendment 002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30-A002.pdf | ||
| Amend._001.doc | DOC document | |
| SF30-A001.pdf | ||
| ATTACHMENT_3_-_SCHEDULE_OF_ITEMS_-_PRICES.doc | DOC document | |
| ATTACHMENT_4_-_Request_for_Clarification_Form.doc | DOC document | |
| ALEX_HALEY_(WMEC_282)_DS_FQ1_APW_18_R0.pdf | ||
| ATTACH._2-Continuation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. HSCG85-18-R-P45002
Dockside Repairs of CGC ALEX HALEY (WMEC 39)
Amendment No.002
The purpose of this amendment is as follows:
a.
Answers to the following Request for Clarifications (RFC) are as follows:
QUESTION NO.19: Missing References; The reference CD did not contain 282-WMEC 845-3 Booklet of General Plans. Is this reference available?
ANSWER: A copy of this reference will be provided upon request. Contractor must submit an e-mail to Valerie.s.riverachase@uscg.mil for a copy of the reference.
QUESTION NO. 20: Contractor has determined from local sources that standard procedure for the disposal of liquid & hazardous waste anticipated to be generated from this specification is via CG Base Kodiak. Will contractor be able to turn over waste (for example waste water, boiler water, paint chips decking debris) to CG Base Kodiak facility for disposal?
ANSWER: Under this requirement, contractors are advised to review and adhere to the following clauses as incorporated under this Requirement:
Paragraph 10, page 6, HSAR 3052-70 Removal or Disposal of Hazardous Substances – Applicable Licenses and Permit (JUN 2006); and
Paragraph 11, pages 7 thru 8, Hazardous Waste; and Paragraph 12, page 8, Volatile Organic Compounds (VOC) Regulations
QUESTION NO. 21: Contractor was informed that CG Base Kodiak has services contract in effect that utilizes approved equipment and credentialed personnel for pier services such as crane. Will contractor be able to utilize base crane services?
ANSWER: Yes
QUESTION NO. 22: Missing References. The following manuals were not on the reference CD. Are these references available? (1) Contractors Environmental Guide, ISC Kodiak Complex;
(2) NAVSEA S9512-A3-MMA-010 Navy Standard Vaneaxial &Tubeaxial Fans ANSWER: A copy of the Contractors Environmental Guide will be provided upon request. . Contractor must submit an e-mail to Valerie.s.riverachase@uscg.mil for a copy of the reference.
As for the NAVSEA manual, please refer to the answer on Question No. 19 under Amendment 001 dated 08/16/17.
b.
All other terms & conditions cited in the requirement will remain unchanged.