Pages 2 thru 7 of SF 30 - Amendment 001

View the file

Other files

File Type Posted
SF30-A002.pdf PDF
Amend._002.doc DOC document
SF30-A001.pdf PDF
ATTACHMENT_3_-_SCHEDULE_OF_ITEMS_-_PRICES.doc DOC document
ATTACHMENT_4_-_Request_for_Clarification_Form.doc DOC document
ALEX_HALEY_(WMEC_282)_DS_FQ1_APW_18_R0.pdf PDF
ATTACH._2-Continuation.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. HSCG85-18-R-P45002

Dockside Repairs of CGC ALEX HALEY (WMEC 39)

Amendment No.001

The purpose of this amendment is as follows:

a.

The due date to submit a proposal for this requirement is extended until 21 August 2017. Therefore, the due date for proposal submission is changed to read as follows:

FROM: 15 August 2017 at 2:00 P.M., Pacific Standard Time

TO: 22 August 2017 at 2:00 P.M., Pacific Standard Time b.

All references made to the period of performance for this requirement is changed to read as follows:

FROM: 24 October 2017 through 20 November 2017

TO: 10 October 2017 through 21 November 2017 c.

Answers to the following Request for Clarifications (RFC) are as follows:

QUESTION NO.1: Work Item D-06, 5 Year Boiler Certification; : 1: Lead Time on the new valves will likely be longer than the performance period will allow, should this be the case, contractor recommends a clean and visual inspection of existing Re-Install to be replace by CG once the New Valves arrive on site post performance period. Would that be acceptable?

2. Any chance to make the 28 day performance period will require Both Boilers to be shut down

And worked together, is that acceptable?

3. Can the base Kodiak Support Services take the boiler water, I believe that may even be a requirement?

4. Can the CG provide the Distilled/Demineralized Water?

5. At this point, we believe the Boiler 5 Year and Tube Renewal will require 7 days a week throughout the performance period, does the CG have any availability on either the front side or the back side of this performance period?

ANSWER: (1) Period of Performance has been extended and contractor should have time to replace valves as needed. (2) As shown on paragraph (b) above, the new period of performance has been changed. (3) Cutter will handle water. (4) Cutter will provide distilled water. (5) same response as (2).

QUESTION NO. 2: Work Item No. D-05, Vane Axial Fan Overhaul, Table 1; 1: Please provide the Horse Power for each fan listed in the table. 2: Each fan listed in the table could have either a 3 inch flex Boot or 6 inch flex boot, can CG Identify each fan listed in the table as to what size the flex boots are? (Para 3.4)

ANSWER: For question #1 of the RFC, the horsepower are provided as follows:

Location
Type
Fan Number
Fan and Motor Description
01-19-4-Q
HP: 4/1.25
01-19-2
Vaneaxial A5A4W6
1-30-0-L
HP: 3/1
1-31-1
Vaneaxial A3A4W6
2-33-1-Q
HP: 1.1/1.75
2-39-2
Vaneaxial A6A4W6
01-13-0-L
HP: 7.5/3.3
01-14-1
Vaneaxial 9W58013A8A4W6
01-13-0-L
HP: 7.5/3.3
01-14-2
Vaneaxial 9W58013A8A4W6
1-25-0-L
HP: 5/2.2
1-25-3
Vaneaxial A3A4W6
02-18-1-Q
HP: 5/2.2
02-18-3
Vaneaxial A3A4W6
02-18-1-Q
HP: 5/2.2
02-18-7
Vaneaxial A3A4W6

FOR question #2 of the RFC, contractor will need to measure on site and fabricate seal. The drawing cited on paragraph 3.4 of the specification of D-05 will be send to the contractor upon request to the Contract Specialist. Contractor will request a copy of the drawing, via e-mail, to Valerie.s.riverachase@uscg.mil.

QUESTION NO. 3: Pier Services & Laydown Area; What services are available at the cutter’s pier? How much laydown area can the contractor expect to have available?

ANSWER: For water, comp. air, sewage Contractor will have access to office space in Naval Engineering Detachment building during business hours. There is room pier side for laydown area, and room in the parking area in front of Naval Engineering Detachment building.

QUESTION NO. 4: Work Item D-02, Compressed Air Receivers (All) Clean, Inspect & Hydro, paragraph 3.3.5; Is the intent of this paragraph to clean & preserve the entire surfaces of all the air receivers or is intent to restore receiver surfaces to condition prior to ultrasonic & magnetic particle testing?

ANSWER: Restore the receivers to what they were when testing started.

QUESTION NO. 4: Work Item No. D-05, Vane Axial Fan Overhaul, paragraph 3.4.2;

Paragraph 3.4.2 states to utilize CG Dwg 400 WAGB 3803-32, sheets 53 & 53A. This is not a listed reference in section 2. Is this drawing guidance correct?

ANSWER: Same answer to QUESTION NO. 2 will apply to this RFC. Contractor is advised to submit a request of the drawings, via email, to address shown above. But as a reminder to all contractors that paragraph 3.4.2 still applies. “Disassemble the flexible couplings. Renew the neoprene coated fiber glass material inside of the flexible couplings.”

QUESTION NO. 5: Work Item No. D-05, Vane Axial Fan Overhaul, paragraph 3.3;

Can the government provide the nameplate data (horsepower, frame size, etc.) of the vane axial fans requiring overhaul?

ANSWER: See the Table shown on QUESTION NO. 2 as it will apply to this RFC.

QUESTION No. 6: Work Item D-02, Compressed Air Receivers (All) Clean, Inspect & Hydro;

Will the contractor be allowed to take down all receivers at same time to accomplish work item?

If yes, will the contractor be required to supplement services in relation to this work item (i.e. compressed air)?

ANSWER: Yes, contractor will not need to supplement service in relation to this work.

QUESTION NO. 7: Work Item D-02, Compressed Air Receivers (All) Clean, Inspect & Hydro, paragraph 3.4; Contractor has found that system relief valve availability is excessive (in excess of 60 days). Will the government accept refurbishment, test & set of existing relief valves?

ANSWER: Yes, Coast Guard (CG) will accept refurbish, test and set of existing relief valves. However, CG will look into providing the valve as GFE for renewal.

QUESTION NO. 8: Work item D-03, Deck (Covering Phoenix One Step) Renew, Table 1;

Will the contractor be allowed access to all areas at the same time and during normal working hours to accomplish work item? If yes, will the contractor be required to supplement services in relation to this work item (i.e. galley, lodging, etc.)?

ANSWER: No, but CG reps will discuss with contractor to accommodate most advantageous means while maintaining safe traffic patterns about the ship.

QUESTION NO. 9: Work Item D-04, Deck Covering Interior Polymeric Reseal, Table 1;

Will the contractor be allowed access to all areas at the same time and during normal working hours to accomplish work item?

ANSWER: No, but CG reps will discuss with contractor to accommodate most advantageous means while maintaining safe traffic patterns about the ship.

QUESTION NO. 10: Work Item No. D-05, Vane Axial Fan Overhaul, paragraph 3.3;

Paragraph 3.3 calls out for contractor to provide air handling equipment to provide continuous positive ventilation to affected compartments. Will standard commercial grade blowers (i.e. UB-30, 115 VAC blowers and ducting be sufficient for this requirement? Is there a required SCFM that the contractor must meet?

ANSWER: Yes, standard commercial grade blowers will be sufficient. No, there is no required SCFM that the contractor must meet.

QUESTION NO. 11: Work Item No. D-06 Boiler 5 Year Certification, paragraph 3.21;

Paragraph 3.21 calls out for contractor to restore lagging around boiler mounts and then pop rivet aluminum covers to protect new lagging. Is the intent to restore the previously removed lagging and sheathing or renew the lagging and sheathing around the boilers’ mounts?

ANSWER: Renew lagging and sheathing.

QUESTION NO. 12: Work Item D-07, Boiler, Tube Renewal Partial, paragraph 3.1.2.1;

This question also references Work Item 6: Boiler 5 Year Certification. Work Item 7 paragraph

3.1.2.1 calls out for all repairs to inspected by a NBCI and all repairs are to be stamped by same.

Is this inspector the same boiler inspector provided by the government under work item 6, paragraph 3.1.2?

ANSWER: Yes, it will be the same inspector.

QUESTION NO. 13: Work Item No. D-06 Boiler 5 Year Certification, paragraph 3.4.1;

Paragraph 3.4.1 calls out for the contractor to conduct repairs on only one boiler at a time. Is the intent to complete all repairs and operational testing on 1 boiler prior to commencing the tear down and inspection of the second boiler or will the contractor be allowed to commence work on 2nd boiler after the government reviews the inspection data on boiler 1 thereby allowing both boilers to be down concurrently?

ANSWER: Yes, intent is to complete repairs and testing on 1 boiler prior to commencing any work on second boiler.

QUESTION NO. 14: Work Item No. D-06 Boiler 5 Year Certification, paragraph 3.19.1 &

3.20.1; Paragraphs 3.19.1 & 3.20.1 call out for use of distilled/de-mineralized water. Will the cutter provide distilled water for contractor use?

ANSWER: Yes. The answer to this RFC is the as cited on QUESTION NO. 1 (4) above.

QUESTION NO. 15: Performance Period; During the ship check, it became quite clear the disruption to the Cutter would require a longer performance period. Contractor recommends either a significantly longer Performance Period or a substantial reduction in flooring repairs. Please advise? This also impacts the Boiler repair approach, as we understand that ISC Kodiak does not have steam, thus will not allow both boilers to be worked in tandem. What does the CG propose?

ANSWER: As shown on paragraph (b) of this amendment, the period of performance has been changed and this should be sufficient time to perform and complete the flooring repairs IAW the specification as well as to overhaul the boilers separately allowing adequate steam for cutter’s daily operations.

QUESTION NO. 16: Work Item D-03, Deck (Phoenix One-Step) Renew, and D-04, Deck Coverings Interior Polymeric Reseal; Interferences: Please define the exact interferences for Flooring Re-Coats, many interferences such as Refrigerators, Galley Stoves, Mess Lines, Cabinets, Coffee Bars, Salad Bars, Juice Bar, Ranges, Cabinets/Cooking Utensils, VidMars, Desk, Counter Tops, and Furniture. Laundry Machines. Since this is a Sand and re-color, Contractor recommends all prep and re-color come up to the interference, since the interference hides/covers the old color which cannot be seen?

ANSWER: Coast Guard’s POP of 10OCT to 21NOV is sufficient time to complete the work as per the spec to include removing all interferences. Recommend ship checks to properly indentify all interferences pertaining to the work item QUESTION NO. 17: Work Item No. D-02, Compressed Air Receivers (All) Clean, Inspect & Hydro; Will the contractor be allowed to take down all receivers at same time to accomplish work item? If yes, will the contractor be required to supplement services in relation to this work item (i.e. compressed air)?

ANSWER: Contractors will be able to take all receivers down to perform work. Cutter will have to connect their pier side air to keep boilers running. If contractors need service air of their own, they will need to provide.

QUESTION NO. 18: Work Item No. D-06 Boiler 5 Year Certification; The Boiler Tech Manual NAVSEA 0951-LP-018-8010, Auxiliary Boiler Cyclotherm NC-2500 CGC ALEX HALEY (CG Pub TP 4803) was not on the reference CD. Is this tech manual available?

ANSWER: Unfortunately, our Distribution Center for copies of NAVSEA drawings or tech pubs are no longer able to provide them. Therefore, under this requirement, if requesting copies of any NAVSEA’s drawings or tech pub you must submit a request, via e-mail, to the Contract Specialist, Valerie.s.riverachase@uscg.mil. Upon receipt of the request, the Contract Specialist will forward the e-mail to the Availability Project Manager (APM). The APM will upload the drawings and tech pubs into the AMERAC SAFE system and distribute files to the contractors. Contractors will receive an e-mail and a ONE TIME password will be provided to download the files.

d.

All other terms & conditions cited in the requirement will remain unchange.