1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0001 19 July 2017 2118858***001
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
USCG COMMAND
Surface Forces Logistics Centers, C&PD2-LREPL 1301 Clay Street, Suite 800N, Oakland, CA 94612
SAME AS BLOCK #6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-18-R-P45001
9B. DATE (SEE ITEM 11)
07 July 2017
10A. MODIFICATION OF CONTRACT/ORDER
NO. ?
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: RFP No. HSCG85-18-R-P45001 USCGC STRATTON (WMSL 752), Dockside Repairs FQ1 FY18
SEE PAGE 2 FOR DESCRIPTION
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Wilma L. Estrada, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG85-18-R-P45001
USCGC STRATTON (WMSL 752) Dockside Repairs FQ1 FY18 Amendment No. 0001
The purpose of this amendment is to reply to the following Requests for Clarification noted during a site visit:
Definite Work Item D-01 Question 1: Will there be growth requiring a crane?
Answer to Question 1: Coast Guard personnel will not need access to contactor’s heavy lift equipment. If, however, the Contractor feels a Work Item might require heavy lift equipment to complete work, they should bid accordingly.
Definite Work Item D-04 Question 2: Request clarification on preparation method and application of Mascoat? Is insulation required in addition to the Mascoat?
Answer to Question 2: Surface Preparation: Prepare surface in accordance with Work Item 4, part 3.4. In regard to the manufacturer’s specification, you reference the “Surface Preparation for Fiberglass Application”; however, the piping and valves are not fiberglass. You should reference “Surface Preparation for Metal Applications”.
Paint the piping IAW Work Item 4, part 3.4.1. We understand that the manufacturer recommends spray application. This has been specifically addressed in the Work Item under 3.4.1. The Coast Guard explicitly authorized brush application.
New insulation is to be installed in addition to the Mascoat coating. As Work Item 4 describes, after application of the Mascoat system, the Contractor shall verify piping diameter (as the Mascoat application is thick) to order correct piping insulation material. Part 3.5 details the insulation installation requirements.
Definite Work Item D-06 Question 3: Can you clarify which platforms require coating renewal as the figure provided is unclear?
Answer to Question 3: We understand that the image provided in the specification is not clear in pointing out exactly which area of the mast is the TCDL and which is the Lower Mast. Please reference Coast Guard Drawing 750-WMSL 100-062, Rev B, Topside Configuration for NSC 3 Only (AS3100004), Sheet 1 for clarification. TCDL is detail 'MAST PLATFORM 104'-9 7/16"'.
Lower Mast location is found in detail 'MAST YARDARM 92'-6 1/2"' as 'MAST PLATFORM 91'-0 7/16"'.
Definite Work Item D-08 Question 4: Would we have to back flush the coolant system after replacing hoses?
Answer to Question 4: The specification does not call out a back flush for the coolant system.
The Contractor is responsible for maintaining existing system cleanliness as specified in Work Item 8, part 3.2.4.
Definite Work Item D-10 Question 5: What finish is required on the hand rails and grab rails?
Answer to Question 5: The finish on the grab rails and handrails is specified in the applicable drawings. Touch-up preservation shall be done in accordance with Work Item 10, part 3.8.