The file's text, extracted by GovTribe without its formatting.
REQUEST FOR PROPOSAL
SOLICITATION NO. HSCG85-17-C-P45157
DRY-DOCK & REPAIRS OF CGC ALEX HALEY (WMEC 39)
ATTACHMENT 2 – SCHEDULE OF ITEMS – PRICES (REVISED)
SCHEDULE OF ITEMS - PRICES
Provide all labor, materials, facility, and equipment, except as specified, to perform Dry-Dock & Repairs of CGC ALEX HALEY (WMEC 39) during the period of 08 March 2017 through 09 May 2017. All work will be performed at the certified dry-dock facility provided by the Contractor.
NOTE: Award of this procurement will be made contingent to funds availability. FAR 52.232-18, Availability of Funds (APR 1984), is hereby incorporated by reference (see page 4, Attachment 3, Continuation of Combined Synopsis /Solicitation – Clauses). No award will be made until funds are available.
CLIN 001: DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The offer shall be evaluated to include the offer price for each definite item.
| ITEM NO. |
| DESCRIPTION |
| PRICE |
| D-02 |
| Temporary Services, Provide – Cutter |
| $ |
| D-03 |
| Seal Trial Performance, Support, Provide |
| $ |
| D-04 |
| Hull Plating (Underwater body) Inspect |
| $ |
| D-05 |
| Hull Plating (Underwater body) Ultrasonic Test |
| $ |
| D-07 |
| Appendages (Underwater) Leak Test |
| $ |
| D-09 |
| Cathodic Protection/Zinc Anodes Renew |
| $ |
| D-10 |
| Anchor Chain & Ground Tackle Inspect & Restore Shot Markings |
| $ |
| D-11 |
| Chain Locker(s) Clean & Inspect |
| $ |
| D-12 |
| Chain Locker(s) Touch Up Preservation |
| $ |
| D-13 |
| Anchor Windlass, Service & Repairs |
| $ |
| D-14 |
| Voids (Non Accessible) Leak Test |
| $ |
| D-16 |
| Propulsion Shaft Fairwaters and Rope Guards, Inspect & Repair |
| $ |
| D-17 |
| Propulsion Shaft Coating Inspect |
| $ |
| D-18 |
| Propulsion Shaft Seals Mechanical Overhaul & Inflatable |
Renewal
| D-19 |
| Propulsion Shaft Bearings (External) Check Clearances |
| $ |
| D-20 |
| Controllable Pitch Propellers, Clean and Inspect |
| $ |
| D-21 |
| Controllable Pitch Propellers, System Maintenance |
| $ |
| D-22 |
| CPP Hubs General Maintenance |
| $ |
| D-23 |
| Propulsion Shaft Alignment (Drydock), Check |
| $ |
| D-33 |
| Rudder Stock Bearing Check Clearance and Carrier Bearings Recess Preservation |
| $ |
| D-34 |
| Rudders, Inspect and Repair |
| $ |
| D-36 |
| Rudders (100%) Preserve |
| $ |
| D-37 |
| Fathometer Transducers, General Maintenance |
| $ |
| D-38 |
| Sea Strainers (All Sizes), Inspection & Renew via Modification |
| $ |
| D-39 |
| Seawater Strainers (All Sizes), Perform Minor Service & |
Inspections
| D-40 |
| Sea Valves (<=2.5 inch) Renewal |
| $ |
| D-41 |
| Sea Valve Overhaul |
| $ |
| D-42 |
| Thruster Unit (General), Overhaul |
| $ |
| D-43 |
| Tanks (Aviation Fuel Service) Clean & Inspect |
| $ |
| D-44 |
| Tanks (MP Fuel Service), Clean & Inspect |
| $ |
| D-45 |
| Tanks (MP Fuel Stowage & Overflow), Clean & Inspect |
| $ |
| D-48 |
| Tanks (Potable Water), Clean & Inspect |
| $ |
| D-51 |
| Underwater Body, Preserve (Partial) |
| $ |
| D-52 |
| Hull Plating Freeboard, Preserve (Partial) |
| $ |
| D-53 |
| Masts (Forward Topmast, Foremast, & Singlemasts) Preserve 100% |
| $ |
| D-54 |
| Electrical Matting Renewal |
| $ |
| D-55 |
| Overboard Off-Sticker, Renewal- |
| $ |
| D-57 |
| Smoke Pipe Renewals |
| $ |
| D-58 |
| Vent Jalousies, Install Catch Basin & Drain |
| $ |
| D-59 |
| Vent Intake Plenum, Preservation & Repairs |
| $ |
| D-60 |
| Vacuum Sewage System, Hydrojet Cleaning |
| $ |
| D-61 |
| Auxiliary Machinery Room, Tank Top Repairs |
| $ |
| D-62 |
| Grey Water Tank Top, Structural Repairs |
| $ |
| D-63 |
| Vane Axial Fan Overhaul |
| $ |
| D-64 |
| Firemain System, Piping System |
| $ |
| D-65 |
| Galley Deck and Miscellaneous Repairs |
| $ |
| D-66 |
| Bilges and Tank Tops Various Areas Preservation |
| $ |
| D-67 |
| No. 2 Main Diesel Engine, Block Renewal |
| $ |
| TOTAL AMOUNT OF DEFINITE ITEMS |
| $ |
CLIN 0002
OPTIONAL ITEMS
Optional items may be awarded if inspection reports reveal the necessity for activation, or if funds are made available, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 22 March 2017, the Contractor shall have the right to refuse to accept the award of such Optional Items.
| ITEM NO. |
| DESCRIPTION |
| PRICE |
| O-06 |
| Hull & Structural Plating (General) – 15.3 Pound Steel Plate, Renew |
| $ |
| O-08 |
| Appendages (Underwater), Internal, Preserve |
| $ |
| O-15 |
| Voids (non-Accessible), Internal Surfaces, Preserve |
| $ |
| O-24 |
| Propeller Hub, Remove, Inspect & Reinstallation |
| $ |
| O-25 |
| Propulsion Shaft Liners Skim Cut |
| $ |
| O-26 |
| Propeller Shaft, Remove, Inspect & Reinstallation |
| $ |
| O-27 |
| Propeller Shaft, Renew |
| $ |
| O-28 |
| Stern Tube Shaft Inspection and Shaft Coating, Renew |
| $ |
| O-29 |
| Stern Tube Propulsion Shafting, Remove, Inspect & Reinstallation |
| $ |
| O-30 |
| Stern Tube Shaft, Renew |
| $ |
| O-31 |
| Bearing Stave Renewal Propeller Shaft (One Bearing Only) |
| $ |
| O-32 |
| Bearing Stave Renewal Stern Tube Shaft (Fore & Aft Stern Tube Bearings) |
| $ |
| O-35 |
| Rudder Removal, One Rudder Only |
| $ |
| O-46 |
| Tanks (MP Fuel Storage & Overflow) Preserve, Partial |
| $ |
| O-47 |
| Tanks (MP Fuel Storage & Overflow) Preserve, 100% |
| $ |
| O-49 |
| Tanks (Potable Water) Preserve 100% |
| $ |
| O-50 |
| Tanks (Potable Water), Preserve Touch Up |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEMS |
| $ |
| TOTAL AMOUNT OF DEFINITE & OPTIONAL ITEMS |
| $ |
CLIN 0003 - COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (18) “COMPOSITE LABOR HOUR RATE.”
| LABOR HOUR RATE |
| ESTIMATED QUANTITY** |
| EXTENDED AMOUNT* |
| $__________ |
| per hour |
| 5797 hours |
| $________________ |
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.
CLIN 0004
LAY DAYS
Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.
PRICE PER DAY:
| X 3 DAYS |
| EXTENDED AMOUNT: |