ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
CONTRACT NO. HSCG85-17-R-P45138
Dockside Repairs of USCGC STRATTON (WMSL 752) FQ3 FY17
B.1
CLIN 0001 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
ITEM
NO.
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| D-01 |
| Fuel Oil Manifold Valve Overhaul |
| 1 |
| JB |
| $ |
| $ |
| D-02 |
| Galley Grease Fire Extinguishing System, Inspect and Test |
| 1 |
| JB |
| $ |
| $ |
| D-03 |
| Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect and Test. |
| 1 |
| JB |
| $ |
| $ |
| D-04 |
| Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test |
| 1 |
| JB |
| $ |
| $ |
| D-05 |
| Water Mist Fire Extinguishing System, Inspect. |
| 1 |
| JB |
| $ |
| $ |
| D-06 |
| Forward and Aft Capstans, Annual Maintenance, Perform |
| 1 |
| JB |
| $ |
| $ |
| D-07 |
| Dual Point Davit ,Biennial Maintenance, Perform |
| 1 |
| JB |
| $ |
| $ |
| D-08 |
| Folding Boom Cranes, Biennial Maintenance, Perform |
| 1 |
| JB |
| $ |
| $ |
| D-09 |
| Oily Water Separator System, Groom |
| 1 |
| JB |
| $ |
| $ |
| D-10 |
| Flight Deck Net, Weight Testing |
| 1 |
| JB |
| $ |
| $ |
| D-14 |
| Temporary Services, Dockside, Home Pier |
| 1 |
| JB |
| $ |
| $ |
| D-15 |
| Deck Covering (Polymeric), Repair and Seal |
| 1 |
| JB |
| $ |
| $ |
| D-16 |
| Surfaces, Preserve |
| 1 |
| JB |
| $ |
| $ |
| D-17 |
| Steering Gear Hydraulic System, Flush |
| 1 |
| JB |
| $ |
| $ |
| D-18 |
| Deck Covering (Slip-Resistant), Renew |
| 1 |
| JB |
| $ |
| $ |
| D-19 |
| Flex Hose Assemblies, Renew |
| 1 |
| JB |
| $ |
| $ |
| D-20 |
| Auxiliary Seawater Piping, Modify |
| 1 |
| JB |
| $ |
| $ |
| D-21 |
| Laundry Electrical Circuits, Modify |
| 1 |
| JB |
| $ |
| $ |
| D-22 |
| Intake Ventilation, Modify |
| 1 |
| JB |
| $ |
| $ |
TOTAL AMOUNT OF ALL DEFINITE ITEMS
B.2
CLIN 0002 - OPTIONAL ITEMS
These are the items which may be awarded if inspection reports reveal the necessity for activation, or if funds become available. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). See ATTACHMENT 3, Section 16, Page 10, entitled “OPTIONAL ITEMS.”
ITEM
NO.
| DESCRIPTION |
| QTY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| O-11 |
| Flight Deck Safety Nets, Renew |
| O-11A |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 4 Plan-2-E |
| 1 |
| JB |
| $ |
| $ |
| O-11B |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 7 Detail 1-E |
| 1 |
| JB |
| $ |
| $ |
| O-11C |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 7 Detail 7-E |
| 1 |
| JB |
| $ |
| $ |
| O-11D |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 7 Detail 4-E |
| 1 |
| JB |
| $ |
| $ |
| O-11E |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 7 Detail 7-A |
| 1 |
| JB |
| $ |
| $ |
| O-11F |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 7 Detail 4-A |
| 1 |
| JB |
| $ |
| $ |
| O-11G |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 7 Detail 2-B |
| 1 |
| JB |
| $ |
| $ |
| O-11H |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 5 Detail 2-D |
| 1 |
| JB |
| $ |
| $ |
| O-11I |
| Flight Net Assembly, CG Drawing 750-WMS-612-003 Sheet 6 Detail 3-A |
| 1 |
| JB |
| $ |
| $ |
| O-12 |
| Tanks (Water Mist), Preserve “100%” |
| O-13 |
| Tanks (Water Mist), Preserve “Partial” |
TOTAL AMOUNT OF ALL OPTIONAL ITEMS
| TOTAL – ALL DEFINITE & OPTIONAL ITEMS |
| $ |
B.3
COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 13, Page 8, entitled "COMPOSITE LABOR RATE.”
LABOR HOUR RATE
ESTIMATED QUANTITY
1547 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The proposed rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.