Amendment_0004_for_FBO.pdf
PDF 300 KB Posted
- Solicitation number
- HSCG85-17-R-P45138
About this file
Re attaching Amendment 0004 because it failed to upload correctly in previous amendment dated January 5, 2017.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 3
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0004 05 January 17 2117857P45138
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
USCG COMMAND
Surface Forces Logistics Centers, C&PD2-LREPL 1301 Clay Street, Suite 800N, Oakland, CA 94612
SAME AS BLOCK #6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-17-R-P45138
9B. DATE (SEE ITEM 11)
07 December 2016
10A. MODIFICATION OF CONTRACT/ORDER
NO. ?
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: RFP No. HSCG85-16-R-P45138 CGC STRATTON (WMSL 752), Dockside Repairs FQ3 FY17
SEE PAGES 2 - 3 FOR DESCRIPTION
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Wilma L. Estrada, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG85-17-R-P45138
CGC STRATTON (WMSL 752) Dockside Repairs FQ3 FY17 Amendment No. 0004
The purpose of this amendment is to reply to the following Requests for Clarification:
Question 1: This is in reference to Definite Item D-23; Cofferdam, Install; Paragraph 1.2
– Contractor believes when the two (2) cofferdams are installed, assuming both cofferdams provide the same function of ASW Supply to all (3) A/C units, how does the CG propose supply water to the (2) operating A/C units yet to be modified while the one unit is being modified?
Answer to Question 1: Auxiliary Seawater Piping, Modify: Work on this item is above Water Line & Cofferdams is not required.
Question 2: This is in reference to Definite Item D-20; Auxiliary Seawater Piping, Modify; Paragraph 3.1.10 – For bidding purposes, how much water is expected to be recovered for ea A/C Unit?
Answer to Question 2: Approximately 500 Gallons.
Question 3: This is in reference to Definite Item D-08; Folding Boom Cranes, Biennial Maintenance, Perform; Paragraph 3.3 - Biennial (Every 2 years) Task 4 and 6 contractor believes this is to accomplish Maintenance Action Interval’s Table 4-1 W,M and Q is that correct?
Answer to Question 3: See the following table: Highlighted task.
HSCG85-17-R-P45138
CGC STRATTON (WMSL 752) Dockside Repairs FQ3 FY17 Amendment No. 0004
Question 4: This is in reference to Definite Item D-20; Auxiliary Seawater Piping, Modify; Paragraph 3.6 - Common Overboard Discharge specifies "to remove existing 5" 90-10 Cu-NI overboard discharge pipe" and install 6" 90-10 in place of existing. This description conflicts with the referenced Coast Guard Drawing 750-WMSL-520-506 RevB Section 44-D and 44-A. Please clarify if this work is to be performed.
Answer to Question 4: 750-WMSL-520-506 REV B : Sheet 6: Section 44-D & PLAN VIEW 44-A : Was old design with CORD. Sheet 6 is deleted & all installation shall be IAW with 750-WMSL-520-506 REV B : Sheet 7. Auxiliary Seawater Piping modification shall be in accordance with 750-WMSL-520-506 REV B
Delete following Para of Spec Para 3.6 :
• Common Overboard Discharge o Remove existing 5” 90-10 Cu-NI overboard discharge pipe o Install 6” 90-10 in place of existing 5” overboard discharge pipe
• Common Seawater Supply o Remove existing 5” Tee supplying AC Units #2 and #3 o Install 6” Sweep Tee in place of existing 5” Tee
Question 5: This is in reference to Definite Item D-07; Table 2, Recurring Maintenance Requirements, Task #7- Other specifies to preserve in accordance with para 3.5. There is no para 3.5 included in the specification. Please clarify the preservation requirements for the Dual Point Davit Assembly.
Answer to Question 5: Table 2, #7, should read Preserve in accordance with Para 3.4 of this specification. 3.4 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310. Abide by all touch-up requirements outlined in SFLC Std Spec 6310.
Question 6: This is in reference to Definite Item D-22; Intake Ventilation, Modify;
Paragraph 3.3 – This paragraph references CG DWG 750-WMSL-512-527. This drawing only has removal, fabrication & installation detailed for the CPO Mess (1-52-4- L), but para 1.1 includes the DC Shop (2-55-2-Q). Please clarify if the DC Shop is included in the scope of work.
Answer to Question 6: Paragraph 1.1. Revised as follows :
1.1 Intent. This work item describes the requirements for the Contractor to modify intake ventilation System SS-256-2.