REVISEDSECTIONBSMILAX.xls
XLS spreadsheet 39 KB Posted
- Attached to
- DRYDOCK REPAIRS FOR THE USCGC SMILAX
- Solicitation number
- HSCG85-17-Q-P45253
About this file
REVISED SECTIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SMILAX_(WLIC_100)_DD_FQ2_RLM_17Rev-2_DD_15_DEC_2016.doc | DOC document | |
| 180-TE_4302_1_1_-_A.pdf | ||
| USCGC_SMILAXQUESTIONS_3.doc | DOC document | |
| A0003SMILAX.pdf | ||
| 180-TE_8201_10_1_-_B.pdf | ||
| 180-TE_4400_5_1_-_-_SMILAX_Propeller.pdf | ||
| QUESTION_ASKED_FOR_SMILAX2.doc | DOC document | |
| A0002SMILAX.pdf | ||
| SMILAX_SPEC_REVISION1.doc | DOC document | |
| QUESTION_ASKED_FOR_SMILAX.doc | DOC document | |
| A0001SMILAX.pdf | ||
| SMILAX-Attachment_4_Request_for_Clarification.docx | DOCX document | |
| SMILAX-Attachment_3_Past_Performance_Information_Form.doc | DOC document | |
| SMILAXSOLICITATION.pdf | ||
| SMILAX-USCG_Ombudsman_Notice.doc | DOC document | |
| SMILAX_SECTION_B.xls | XLS spreadsheet | |
| SMILAX_SPECS.doc | DOC document |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC SMILAX (WLIC-100) DRYDOCK AVAILABILITY FY2017 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect - Tender | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-003 | Hull Plating (Freeboard), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-004 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | |
| D-005 | Propulsion Shaft Rope Guards, Inspect and Repair | JOB | 1 | $0.00 | |
| O-006 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | |
| D-007 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $0.00 | |
| D-008 | Propulsion Shafting, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-009 | Propulsion Shafting, Straighten | JOB | 1 | $0.00 | |
| D-010 | Propeller, Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| O-011 | Propeller, Minor Repairs and Reconditioning, Perform | JOB | 1 | $0.00 | |
| D-012 | Fathometer Transducer, Renew – Tender | JOB | 1 | $0.00 | |
| D-013 | Rudder Stock Bearings Clearances, Check | JOB | 1 | $0.00 | |
| D-014 | Spud Wells Preserve - Tender | JOB | 1 | $0.00 | |
| D-015 | Cathodic Protection / Zinc Anodes, Renew - Tender | JOB | 1 | $0.00 | |
| D-016 | Drydock | JOB | 1 | $0.00 | |
| D-017 | Temporary Services, Provide - Tender | JOB | 1 | $0.00 | |
| D-018 | Lead-Based Paint and Asbestos 100% Abatement, Perform | JOB | 1 | $0.00 | |
| D-019 | Deck Covering (Interior Wet/Dry), Renew | JOB | 1 | $0.00 | |
| D-020 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-021 | Rudder Assembly Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| D-022 | Sewage Piping, Clean and Flush | JOB | 1 | $0.00 | |
| D-023 | Buoy and Cargo Crane, Inspect and Service | JOB | 1 | $0.00 | |
| D-024 | Airports, Overhaul | JOB | 1 | $0.00 | |
| D-025 | Wardroom AC Cofferdam Plating, Renew | JOB | 1 | $0.00 | |
| D-026 | Wardroom Aft Bulkhead Plating, Renew | JOB | 1 | $0.00 | |
| D-027 | Closed Chocks, Repair | JOB | 1 | $0.00 | |
| D-028 | Hull Plating Tender, Renew | JOB | 1 | $0.00 | |
| D-029 | Tender Rub Rail, Inspect and Test | JOB | 1 | $0.00 | |
| D-030 | Port & Stbd Dry Stores Structural Members, Repair & Renew | JOB | 1 | $0.00 | |
| D-031 | Spud Winch Cable Deck Attachment, Reconfigure | JOB | 1 | $0.00 | |
| D-032 | U/W Body Preserve (100%) Tender | JOB | 1 | $0.00 | |
| D-033 | Hull Plating Freboard Preserve (100%) | JOB | 1 | $0.00 | |
| D-034 | Buoy and Cargo Crane, Shrink Wrap | JOB | 1 | $0.00 | |
| D-035 | Tanks (Potable Water) Preserve (100%) | JOB | 1 | $0.00 | |
| D-036 | Mechanical Shaft Seal Assemblies, Renew | JOB | 1 | ||
| D-037 | Propulsion Shaft Bulkhead Seals, Renew | JOB | 1 | ||
| D-038 | Potable Water Man Hole Covers, Renew | JOB | 1 | ||
| D-039 | Stern Tubes and Strut Barrels, Renew | JOB | 1 | ||
| O-040 | Weather Tight Doors & Frames (External), Renew | JOB | 1 | ||
| D-041 | Appleton Crane Hydraulic Power Unit, Oil TK cover, Repair | JOB | 1 | $0.00 | |
| D-042 | Appleton Crane Fuel Valve & Seawater Valve, Install | JOB | 1 | $0.00 | |
| O-043 | Temporary Services Provide - Barge | JOB | 1 | ||
| O-044 | Barge Crane, Shrink Wrap | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 2740 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $500.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&CREVISED SECTION B 12/07/2016
CostEstimateBreakdowns
| Composite Labor Rate | 55 | ||||||||||||||||||||||||
| Assumed G&A Factor | 15% | ||||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | ||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData | |
| 1 | 62 | Baltimore, MD | |||||||||||||||||||||||
| 1 | 52 | Biloxi, MS | |||||||||||||||||||||||
| 1 | 56 | Boston, MA | |||||||||||||||||||||||
| 1 | 50 | Charleston, SC | |||||||||||||||||||||||
| 1 | 60 | Corpus Christi, TX | |||||||||||||||||||||||
| O-006 | 1 | 51 | Hampton Roads | ||||||||||||||||||||||
| 1 | 64 | Honolulu, HI | |||||||||||||||||||||||
| Propulsion Shafting, Remove, Inspect, and Reinstall | 1 | 55 | Houston, TX | ||||||||||||||||||||||
| O-009 | Propulsion Shafting, Straighten | 1 | 56 | Los Angeles, CA | |||||||||||||||||||||
| Propeller, Remove, Inspect, and Reinstall | 1 | 55 | Median Rate | ||||||||||||||||||||||
| O-011 | Propeller, Minor Repairs and Reconditioning, Perform | 1 | 49 | Miami | |||||||||||||||||||||
| Fathometer Transducer, Renew – Tender | 1 | 50 | Narragansett Bay, RI | ||||||||||||||||||||||
| D-013 | Rudder Stock Bearings Clearances, Check | 1 | 55 | New London, CN | |||||||||||||||||||||
| Spud Wells Preserve - Tender | 1 | 45 | New Orleans | ||||||||||||||||||||||
| Cathodic Protection / Zinc Anodes, Renew - Tender | 1 | 62 | NYNY | ||||||||||||||||||||||
| Drydock | 1 | 49 | Panama City, FL | ||||||||||||||||||||||
| Temporary Services, Provide - Tender | 1 | 60 | Philadelphia, PA | ||||||||||||||||||||||
| Lead-Based Paint and Asbestos 100% Abatement, Perform | 1 | 51 | Portland, ME | ||||||||||||||||||||||
| Deck Covering (Interior Wet/Dry), Renew | 1 | 57 | Portland, OR | ||||||||||||||||||||||
| Sea Trial Performance, Support, Provide | 1 | 55 | San Diego, CA | ||||||||||||||||||||||
| D-021 | Rudder Assembly Remove, Inspect and Reinstall | 1 | 67 | San Francisco, CA | |||||||||||||||||||||
| Sewage Piping, Clean and Flush | 1 | 55 | Santa Barbara, CA | ||||||||||||||||||||||
| Buoy and Cargo Crane, Inspect and Service | 1 | 55 | SE North Carolina | ||||||||||||||||||||||
| Airports, Overhaul | 1 | 65 | Seattle, WA | ||||||||||||||||||||||
| D-025 | Wardroom AC Cofferdam Plating, Renew | 1 | 48 | Tampa-St. Petersburg | |||||||||||||||||||||
| Wardroom Aft Bulkhead Plating, Renew | 1 | 60 | Wilmington, DE | ||||||||||||||||||||||
| Closed Chocks, Repair | 1 | ||||||||||||||||||||||||
| Hull Plating Tender, Renew | 1 | ||||||||||||||||||||||||
| Tender Rub Rail, Inspect and Test | 1 | ||||||||||||||||||||||||
| Port & Stbd Dry Stores Structural Members, Repair & Renew | 1 | ||||||||||||||||||||||||
| Spud Winch Cable Deck Attachment, Reconfigure | 1 | ||||||||||||||||||||||||
| U/W Body Preserve (100%) Tender | 1 | ||||||||||||||||||||||||
| Hull Plating Freboard Preserve (100%) | 1 | ||||||||||||||||||||||||
| Buoy and Cargo Crane, Shrink Wrap | 1 | ||||||||||||||||||||||||
| Tanks (Potable Water) Preserve (100%) | 1 | ||||||||||||||||||||||||
| D-036 | Mechanical Shaft Seal Assemblies, Renew | JOB | 1 | ||||||||||||||||||||||
| D-037 | Propulsion Shaft Bulkhead Seals, Renew | JOB | 1 | ||||||||||||||||||||||
| D-038 | Potable Water Man Hole Covers, Renew | JOB | 1 | ||||||||||||||||||||||
| D-039 | Stern Tubes and Strut Barrels, Renew | JOB | 1 | ||||||||||||||||||||||
| O-040 | Weather Tight Doors & Frames (External), Renew | JOB | 1 | ||||||||||||||||||||||
| D-041 | Appleton Crane Hydraulic Power Unit, Oil TK cover, Repair | 1 | |||||||||||||||||||||||
| D-042 | Appleton Crane Fuel Valve & Seawater Valve, Install | 1 | |||||||||||||||||||||||
| O-043 | Temporary Services Provide - Barge | JOB | 1 | ||||||||||||||||||||||
| O-044 | Barge Crane, Shrink Wrap | JOB | 1 | ||||||||||||||||||||||
| 2740 |
&CREVISED SECTION B 12/07/2016
CostEstimateTemplate
| 1 | |
| 2740 |
&CREVISED SECTION B 12/07/2016
File details come from the government source that posted it. Updated .