QUESTION_ASKED_FOR_SMILAX2.doc

DOC document 24 KB Posted

Attached to
DRYDOCK REPAIRS FOR THE USCGC SMILAX
Solicitation number
HSCG85-17-Q-P45253
Issued by

About this file

QUESTIONS AND ANSWERS

View the file

Other files

File Type Posted
SMILAX_(WLIC_100)_DD_FQ2_RLM_17Rev-2_DD_15_DEC_2016.doc DOC document
180-TE_4302_1_1_-_A.pdf PDF
USCGC_SMILAXQUESTIONS_3.doc DOC document
A0003SMILAX.pdf PDF
180-TE_8201_10_1_-_B.pdf PDF
180-TE_4400_5_1_-_-_SMILAX_Propeller.pdf PDF
A0002SMILAX.pdf PDF
REVISEDSECTIONBSMILAX.xls XLS spreadsheet
SMILAX_SPEC_REVISION1.doc DOC document
QUESTION_ASKED_FOR_SMILAX.doc DOC document
A0001SMILAX.pdf PDF
SMILAX-Attachment_4_Request_for_Clarification.docx DOCX document
SMILAX-Attachment_3_Past_Performance_Information_Form.doc DOC document
SMILAXSOLICITATION.pdf PDF
SMILAX-USCG_Ombudsman_Notice.doc DOC document
SMILAX_SECTION_B.xls XLS spreadsheet
SMILAX_SPECS.doc DOC document
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTION ASKED FOR SOLICITATION HSCG85-17-Q-P45253

QUESTION #3 from Amendment 0001 –

The following references were supplied with the incorrect revision. Will the revisions of the drawings supplied be correct in estimating the repairs required?

WI 41 reference 180TE 8201-010, Rev B (Rev A was provided WI 25 reference 180TE 1106-001, Rev – (Rev A was provided)

ANSWER:

WI 41 reference 180TE 8201-010, Rev B (Rev A was provided) – This reference has been updated by 4302-10 which is on the CD provided.

WI 25 reference 180TE 1106-001, Rev – (Rev A was provided) - The correct reference drawing 180-Te-82-1-10-1_B.PDF is attached QUESTION # 1 : Paragraph 1.1of the work item generally describes the requirements for the contractor to clean the sewage piping system and renew the tank level indicator (TLI) probe. Paragraph 3.1.4, Interferences lists the toilets, and vacuum accumulators as interferences. During the ship check the contractor noted that the piping connection from the toilets to the sewage tank is completed using hose and not piping.

The normal cleaning method for sewage piping is to chemically clean the system.

Is it the government’s intention to have the contractor clean the hoses installed in the sewage system?

ANSWER: Yes. The contractor is required to clean these sections of sewage piping utilizing alternate methods that do not damage/deteriorate the Rubber/Poly connection hose QUESTION: #2 Paragraph 4.1 of the work item describes the propeller details as “Manganese Bronze alloy, 4 blades, 46” diameter x 42” pitch”. The reference drawing describes the propeller details as “Manganese Bronze, 5 blade, 46” diameter x 39” pitch. Please correctly identify the propellers installed onboard the vessel

ANSWER: SMILAX does in fact have (2 Ea.) Manganese Bronze alloy, 4 blades, 46” diameter x 42” pitch Propeller Blades. The wrong DWG was pulled in D-Spec when the initial Spec was created. The correct reference drawing (180TE 4400-005 Rev - Propellers, SMILAX) is attached