ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
Provide all labor, materials, facility, and equipment, except as specified, to perform Dockside Repairs of CGC WAESCHE (WMSL 751) during the period of 21 November 2016 through 10 January 2017. All work will be performed at the cutter’s home moorage in Alameda, CA.
B.1 DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
ITEM
NO.
DESCRIPTION AMOUNT
D-01 SSDG #3 Exhaust Piping, Clean & Inspect $ D-02 SSDG #3 Exhaust Valve, Renew $ D-03 Galley Grease Fire Extinguishing System, Inspect and Test $
D-04 Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect and Test
D-05 Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test
D-06 Water Mist Fire Extinguishing System, Inspect and Test $ D-07 Gypsy Winch, Annual Inspection and Test, Perform $ D-08 Cargo Handling Elevator Biannual, Inspect and Repair $ D-09 Helo Hangar Door Curtain Assembly, Renew $ D-10 Temporary Services, Dockside, Home Pier $ D-11 Deck Covering (Spacia Wood LVT), Repair $ D-12 Auxiliary Seawater System (ASW) Valves, Renew $ D-13 Deck Covering (Ceramic Tile), Renew $ D-14 Shower Stall, Seal $ D-15 Shower and Toilet Deck, Replace $ D-16 Vent Ducts, Renew $ D-17 Cofferdam, Install $
TOTAL AMOUNT OF ALL DEFINITE ITEMS $
B.2 OPTIONAL ITEMS
All optional items will be awarded if inspection reports reveal the necessity for activation, but before 05 Dec 2016, see Section 14, Page 11, entitled “Optional Items”
ITEM
NO.
DESCRIPTION AMOUNT
O-18 Tanks (Water Mist), Preserve “100%” $ O-19 Tanks (Water Mist), Preserve “Partial” $
B.3 COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with
ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
ATTACHMENT 3, Section 11, Page 09, entitled "COMPOSITE LABOR RATE.”
LABOR HOUR RATE
ESTIMATED QUANTITY
689 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.