ATTACHMENT_2_-_Schedule_of_Supplies-Services.pdf

PDF 40 KB Posted

Attached to
USCGC WAESCHE (WMSL 751) Dockside Repairs FY17 FQ1
Solicitation number
HSCG85-16-R-P45K41
Issued by

About this file

Attachment 2 - Schedule of Supplies/Services

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES

Provide all labor, materials, facility, and equipment, except as specified, to perform Dockside Repairs of CGC WAESCHE (WMSL 751) during the period of 21 November 2016 through 10 January 2017. All work will be performed at the cutter’s home moorage in Alameda, CA.

B.1 DEFINITE ITEMS

These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

ITEM

NO.

DESCRIPTION AMOUNT

D-01 SSDG #3 Exhaust Piping, Clean & Inspect $ D-02 SSDG #3 Exhaust Valve, Renew $ D-03 Galley Grease Fire Extinguishing System, Inspect and Test $

D-04 Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect and Test

D-05 Heptafluoropropane (HFP) Fire Extinguishing System, Inspect and Test

D-06 Water Mist Fire Extinguishing System, Inspect and Test $ D-07 Gypsy Winch, Annual Inspection and Test, Perform $ D-08 Cargo Handling Elevator Biannual, Inspect and Repair $ D-09 Helo Hangar Door Curtain Assembly, Renew $ D-10 Temporary Services, Dockside, Home Pier $ D-11 Deck Covering (Spacia Wood LVT), Repair $ D-12 Auxiliary Seawater System (ASW) Valves, Renew $ D-13 Deck Covering (Ceramic Tile), Renew $ D-14 Shower Stall, Seal $ D-15 Shower and Toilet Deck, Replace $ D-16 Vent Ducts, Renew $ D-17 Cofferdam, Install $

TOTAL AMOUNT OF ALL DEFINITE ITEMS $

B.2 OPTIONAL ITEMS

All optional items will be awarded if inspection reports reveal the necessity for activation, but before 05 Dec 2016, see Section 14, Page 11, entitled “Optional Items”

ITEM

NO.

DESCRIPTION AMOUNT

O-18 Tanks (Water Mist), Preserve “100%” $ O-19 Tanks (Water Mist), Preserve “Partial” $

B.3 COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES

The following labor hour rate shall be used in pricing all contract changes in accordance with

ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES

ATTACHMENT 3, Section 11, Page 09, entitled "COMPOSITE LABOR RATE.”

LABOR HOUR RATE

ESTIMATED QUANTITY

689 hours

EXTENDED AMOUNT

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

File details come from the government source that posted it. Updated .