Revised_Table_1_to_Work_Item_D-11.pdf
PDF 13 KB Posted
- Attached to
- United States Coast Guard Cutter (USCGC) WAESCHE (WMSL 751) Dockside (DS) Repairs FQ3 FY16
- Solicitation number
- HSCG85-16-R-P45565
About this file
ATTACHMENT to Amendment 0005 - Revised Table 1 to Work Item D-11
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
62 (Rev-1)
S12_024_53000_JSP_1015_751
S13_056_50800_TAB_1015_751
WORK ITEM 11: Piping and Valve Insulation, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew or remove miscellaneous piping and valve insulation listed in Table 1.
TABLE 1-MISCELLANEOUS VALVE AND PIPING INSULATION LIST
LOCATION SYSTEM
PIPE DIAMETER /
VALVE NUMBER
(INCHES)
APPROX.
LENGTH
(LINEAR
FEET)
COAST GUARD
DRAWING
3-64-0-E Potable Water 2 Inch / CPW1-V-011
20 750-WMSL-530-
3-64-0-E Potable Water 2 Inch / CPW2-V-011
20 750-WMSL-530-
3-22-0-Q Chilled Water
CWS-V-003
10 750-WMSL-516-
3-22-0-Q Chilled Water
CWR-V-003
10 750-WMSL-516-
3-22-0-Q Chilled Water
CWS-V-009
10 750-WMSL-516-
3-22-0-Q #1 Chill water pump housing
2 750-WMSL-516-
3-22-0-Q #1 Chill water pump vent
10 750-WMSL-516-
2-82-01-L Chilled Water 1 2 750-WMSL-516-
2-82-01-L Chilled Water 1/2 8 750-WMSL-516-
2-82-01-L Chilled Water 2 30 750-WMSL-516-
2-59-01-L Chilled Water 1 2 750-WMSL-516-
2-36-3-L Potable Water 1/2 6 750-WMSL-530-
1-29-0-L Chilled Water 2 25 750-WMSL-516-
3-64-0-E Potable Water V-3-67-13 Valve 750-WMSL-530-
3-64-0-E Potable Water V-3-67-15 Valve 750-WMSL-530-
3-64-0-E Potable Water V-3-67-17 Valve 750-WMSL-530-
63 (Rev-1)
3-64-0-E Potable Water V-3-67-19 Valve 750-WMSL-530-
3-64-0-E Potable Water V-3-68-19 Valve 750-WMSL-530-
3-64-0-E Potable Water V-3-68-21 Valve 750-WMSL-530-
3-64-0-E Potable Water V-3-68-23 Valve 750-WMSL-530-
1.2 Government-furnished property.
None.
2. REFERENCES*plain
COAST GUARD DRAWINGS
Coast Guard Drawing 750-WMSL-100-001, Rev L, General Arrangements (ASC100001)
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M (ASC508001)
Coast Guard Drawing 750-WMSL-530-001, Rev F, Potable Water Systems Diagram
(ASC530001)
Coast Guard Drawing 750-WMSL-514-001, Rev C, Chilled Water System Schematic
(ASC514014)
Coast Guard Drawing 750-WMSL-516-002, Rev J, Chilled Water System Diagram (ASC516002)
Coast Guard Drawing 750-WMSL-516-009, Rev B, Chilled Water Unit 2130 (ASC516213-Cw)
Coast Guard Drawing 750-WMSL-530-011, Rev A, Potable Water Unit 2130 (ASC530213-PW)
Coast Guard Drawing 750-WMSL-516-013, Rev C, Chilled Water Unit 2330 (ASC516233-Cw)
Coast Guard Drawing 750-WMSL-516-015, Rev B, Chilled Water Unit 3130 (ASC516313-Cw)
Coast Guard Drawing 750-WMSL-516-017, Rev C, Chilled Water Unit 3230 (ASC516323-Cw)
Coast Guard Drawing 750-WMSL-530-019, Rev D, Potable Water Unit 3120 (ASC530312-Pw)
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
File details come from the government source that posted it. Updated .