Revised_Table_1_to_Work_Item_D-11.pdf

PDF 13 KB Posted

Attached to
United States Coast Guard Cutter (USCGC) WAESCHE (WMSL 751) Dockside (DS) Repairs FQ3 FY16
Solicitation number
HSCG85-16-R-P45565
Issued by

About this file

ATTACHMENT to Amendment 0005 - Revised Table 1 to Work Item D-11

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

62 (Rev-1)

S12_024_53000_JSP_1015_751

S13_056_50800_TAB_1015_751

WORK ITEM 11: Piping and Valve Insulation, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew or remove miscellaneous piping and valve insulation listed in Table 1.

TABLE 1-MISCELLANEOUS VALVE AND PIPING INSULATION LIST

LOCATION SYSTEM

PIPE DIAMETER /

VALVE NUMBER

(INCHES)

APPROX.

LENGTH

(LINEAR

FEET)

COAST GUARD

DRAWING

3-64-0-E Potable Water 2 Inch / CPW1-V-011

20 750-WMSL-530-

3-64-0-E Potable Water 2 Inch / CPW2-V-011

20 750-WMSL-530-

3-22-0-Q Chilled Water

CWS-V-003

10 750-WMSL-516-

3-22-0-Q Chilled Water

CWR-V-003

10 750-WMSL-516-

3-22-0-Q Chilled Water

CWS-V-009

10 750-WMSL-516-

3-22-0-Q #1 Chill water pump housing

2 750-WMSL-516-

3-22-0-Q #1 Chill water pump vent

10 750-WMSL-516-

2-82-01-L Chilled Water 1 2 750-WMSL-516-

2-82-01-L Chilled Water 1/2 8 750-WMSL-516-

2-82-01-L Chilled Water 2 30 750-WMSL-516-

2-59-01-L Chilled Water 1 2 750-WMSL-516-

2-36-3-L Potable Water 1/2 6 750-WMSL-530-

1-29-0-L Chilled Water 2 25 750-WMSL-516-

3-64-0-E Potable Water V-3-67-13 Valve 750-WMSL-530-

3-64-0-E Potable Water V-3-67-15 Valve 750-WMSL-530-

3-64-0-E Potable Water V-3-67-17 Valve 750-WMSL-530-

63 (Rev-1)

3-64-0-E Potable Water V-3-67-19 Valve 750-WMSL-530-

3-64-0-E Potable Water V-3-68-19 Valve 750-WMSL-530-

3-64-0-E Potable Water V-3-68-21 Valve 750-WMSL-530-

3-64-0-E Potable Water V-3-68-23 Valve 750-WMSL-530-

1.2 Government-furnished property.

None.

2. REFERENCES*plain

COAST GUARD DRAWINGS

Coast Guard Drawing 750-WMSL-100-001, Rev L, General Arrangements (ASC100001)

Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping and Machinery Insulation Schedule and L/M (ASC508001)

Coast Guard Drawing 750-WMSL-530-001, Rev F, Potable Water Systems Diagram

(ASC530001)

Coast Guard Drawing 750-WMSL-514-001, Rev C, Chilled Water System Schematic

(ASC514014)

Coast Guard Drawing 750-WMSL-516-002, Rev J, Chilled Water System Diagram (ASC516002)

Coast Guard Drawing 750-WMSL-516-009, Rev B, Chilled Water Unit 2130 (ASC516213-Cw)

Coast Guard Drawing 750-WMSL-530-011, Rev A, Potable Water Unit 2130 (ASC530213-PW)

Coast Guard Drawing 750-WMSL-516-013, Rev C, Chilled Water Unit 2330 (ASC516233-Cw)

Coast Guard Drawing 750-WMSL-516-015, Rev B, Chilled Water Unit 3130 (ASC516313-Cw)

Coast Guard Drawing 750-WMSL-516-017, Rev C, Chilled Water Unit 3230 (ASC516323-Cw)

Coast Guard Drawing 750-WMSL-530-019, Rev D, Potable Water Unit 3120 (ASC530312-Pw)

NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery

File details come from the government source that posted it. Updated .