Solicitation RFQ HSCG85-16-Q-P45B27 DOCKSIDE REPAIRS FY2016 FOR USCGC HENRY BLAKE (WLM-563)

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTICE TO VENDORS

SOLICITATION NUMBER: HSCG85-16-Q-P45B27

TITLE: DOCKSIDE REPAIRS FY2016 FOR USCGC HENRY BLAKE (WLM-563)

The U.S. Department of Homeland Security, U.S. Coast Guard Surface Forces Logistics Center (SFLC) will acquire the work outlined in the solicitation utilizing procedures in FAR Part 12, Acquisition of Commercial Items and FAR Subpart 13.5, Simplified Procedures for Certain Commercial Items.

THE FOLLOWING INFORMATION IS HIGHLIGHTED FOR YOUR ATTENTION:

1. This cover sheet is not intended to be all-inclusive. Please read the entire solicitation including any attachments, to ensure completion of all required representations, certifications, and submissions.

Acknowledge all Solicitation Amendments (SF-30) issued by the Government.

2. Your offer shall include all of the documents and information listed on page 31 (FAR Provision 52.212-1

(b) Submission of Offers) and your offer shall be received by our office at or before the exact date and time specified on page 1 of the SF 1449, Block 8 to be eligible for award. Also, see FAR Provision 52.212-2 page 41 for Evaluation Factors.

3. Submit your offer, with all required documentation via one of the following methods:

Mail to:

United States Coast Guard Surface Forces Logistics Center Attn: Mei Chan 1300 Clay Street, Suite 807N Oakland, CA 94612

Email to:

Attn: Mei S Chan

Email: Mei.S.Chan@uscg.mil

4. QUESTIONS/CONCERNS/REQUEST FOR DRAWINGS: It shall be the obligation of the vendor to exercise due diligence to discover and to bring to the attention of the Government any ambiguities, inconsistencies or concerns regarding the information in this solicitation. All questions/ concerns regarding this solicitation shall be submitted in writing to the Contract Specialist at Mei.S.Chan@uscg.mil no later than 15 April 2016 at 10:00 am PST. Follow-up/additional questions will not be accepted after this date and time due to time constraints. Vendors shall reference the solicitation number and provide enough information in their email so the Government can easily respond to their questions/concerns. Questions/concerns will be compiled and addressed on an Amendment of Solicitation (SF-30) and will be posted on the FedBizOpps website for viewing by all potential vendors. Answers to questions will be available after the due date for questions/concerns has past.

HSCG85-19-Q-P45279

USCGC WIRE (WYTL 65612)

DRYDOCK REPAIRS F

NOTICE FOR FILING AGENCY PROTESTS

United States Coast Guard Ombudsman Program

It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).

Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.

Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process, the agency is not required to suspend contract award performance.

Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum.

In order to ensure a timely response, interested parties should provide the following information to the Ombudsman:

solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).

Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program. Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103. If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted to:

COMMANDANT (CG-9131)

U S COAST GUARD

OMBUDSMAN PROGRAM FOR AGENCY PROTESTS

EMAIL: OPAP@uscg.mil Fax: 202-372-8447 Phone: 202-475-5786

More information about the Ombudsman Program for Agency Protests (OPAP) can be found at http://www.uscg.mil/acquisition/business/ombudsman.asp

Alternative Point of Contact:

United States Coast Guard Surface Forces Logistics Center Attn: Natalie J. Rodriguez 1301 Clay Street, Suite 807N Oakland, CA 94612 Email: natalie.j.rodriguez@uscg.mil

Commander U.S. Coast Guard

Surface Forces Logistics Center

CPD-C&P2-IBCT

1301 Clay Street, Suite 807N Oakland, California 94612-5249

REQUEST FOR QUOTATION: HSCG85-16-Q-P45B27

DOCKSIDE REPAIRS FY2016 FOR USCGC HENRY BLAKE (WLM-563)

TABLE OF CONTENTS

DESCRIPTION PAGE NUMBER

SF 1449, Solicitation/Contract/Order for Commercial Items Continuation of SF 1449

Contract Clauses FAR 52.212-4 Contract Terms and Conditions Addendum 9 FAR 52.212-5 Contract Terms and Conditions Required to Implement 24 Statutes and Executive Orders HSAR 3052.212-70 Contract Terms and Conditions Applicable to DHS 30 Acquisition of Commercial Items.

Solicitation Provisions FAR 52.212-1 Instructions to Offerors Addendum 31 FAR 52.212-2 Evaluation Commercial Items or other Evaluation Factors for Award 41 FAR 52.212-3 Representations and Certifications-Commercial Items 45

Contract Documents/Exhibits and/or Attachments Attachment Section B – Schedule of Supplies/Services 1 Work Specification 2 Government Property Report 3 Past Performance Questionnaire 4 Request for Clarification Form 5

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

2116856P45B27

2. CONTRACT NO.

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER

5. SOLICITATION NUMBER

HSCG85-16-Q-P45B27

6. SOLICITATION ISSUE

DATE

03/25/2016

7. FOR

SOLICITATION

INFORMATION

CALL:

a. NAME

Mei S Chan

b. TELEPHONE NUMBER (No collect calls)

(510) 637-5813

8. OFFER DUE DATE/

LOCAL TIME

04/25/2016 /10:00am PST

9. ISSUED BY CODE 75174

Commander, USCG Surface Forces Logistics Center Attn: Mei S Chan 1301 Clay Street, Suite 807N Oakland, California 94612-5249

E-mail: Mei.S.Chan@uscg.mil

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: 100 % FOR:

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

HUB ZONE SMALL SMALL BUSINESS PROGRAM NAICS:

BUSINESS 336611

EDWOSB SIZE STANDARD:

SERVICE-DISABLED 1250

VETERAN-OWNED

SMALL BUSINESS 8(A)

11. DELIVERY FOR FOB

DESTINATION UNLESS

BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER DPAS (15

CFR 700)

13b. RATING

DO-N5

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE

See schedule

CONTINUED ON PAGES 3

16. ADMINISTERED BY CODE

Same as block 9

CONTINUED ON PAGES 3

17a. CONTRACTOR/ CODE FACILITY

OFFEROR CODE

DUNS:

TELEPHONE NO:

18a. PAYMENT WILL BE MADE BY CODE

USCG Finance Center 1430A Kristina Way Chesapeake, VA 23326

CONTINUED ON PAGES 4

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH

ADDRESS IN OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

DOCKSIDE REPAIRS FY2016 FOR USCGC

HENRY BLAKE (WLM-563)

The Contractor shall furnish all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified to perform dockside repairs and alternations to the USCGC HENRY Blake (WLM-563) in accordance with this solicitation and attachment specifications.

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (FOR GOVT USE ONLY)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 & 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4, FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND

RETURN 1 COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO

FURNISH AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE

IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

29. AWARD OF CONTRACT: REFERENCE

OFFER DATED . YOUR OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY

ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN, IS ACCEPTED AS TO

ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER

30c. DATE SIGNED

31b. NAME OF CONTRACTING OFFICER

31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012) PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212

USCGC HENRY BLAKE (WLM-563)

DOCKSIDE REPAIRS FY2016

19.

ITEM

NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

SEE SEPARATE ATTACHMENT 1 FOR SECTION – B, SCHEDULE OF

SUPPLIES/SERVICES

All work is to be performed in accordance with USCGC HENRY BLAKE (WLM-563), a 175 foot Coastal Buoy Tender Specification for Dockside Repairs FY2016 and applicable references (Rev-0, 19 February 2016).

Work covered by this contract shall be completed within the availability schedules as depicted in the following schedules of supplies and services from the date the vessels becomes available to the contractor. This availability is scheduled to start on or about 08/02/2016 and end on or about 09/23/2016 for 52 days. Scope of services shall include ship repair and associated support work, and may include work that is not currently listed as Definite Items.

"NO AWARD WILL BE MADE UNTIL FUNDS ARE AVAILABLE."

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER

34. VOUCHER NUMBER

35. AMOUNT VERIFIED

CORRECT FOR

36. PAYMENT

COMPLETE PARTIAL FINAL

37. CHECK

NUMBER

PARTIAL FINAL

38. S/R ACCOUNT

NUMBER

39. S/R VOUCHER NUMBER

40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

42 a. RECEIVED BY (Print)

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC’D (YY/MM/DD)

42d. TOTAL

CONTAINERS

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (Rev. 2/2012 PREVIOUS EDITION IS NOT USABLE Prescribed by GSA – FAR (48 CFR) 53.212

Continuation of SF 1449 – BLOCKS 15 - 26

(1) Block 15: Deliver To

Place of Performance: All dockside repairs shall be performed at the cutter’s home port or Coast Guard Base Seattle, Pier 36/37.

Coast Guard Cutter and Vessel Home Port: Naval Station Everett, 200 W. Marine View Dr., Everett, WA 98207

GEOGRAPHICAL RESTRICTION – N/A

(2) Block 16: Administered By (Contract Management)

Notwithstanding the Contractor’s responsibility for total management during the performance of the contract, the administration of the contract will require maximum coordination between the Government and the Contractor. The individuals listed below will be the Government points of contact during the performance period.

Contract Administration (Contracting Officer): The U.S. Department of Homeland Security, U.S. Coast Guard, Surface Forces Logistics Center, CPD-C&P2-IBCT, 1301 Clay Street, Suite 807N, Oakland, CA 94612-5249 will perform all contract administration. Communications pertaining to contractual administrative matters shall be addressed to the Contracting Officer (KO) or Contract Specialist (KS) listed below. Changes in, or deviations from, the specification or terms and conditions of the contract shall not be effected without written modification to the contract as executed by a USCG SFLC CPD Contracting Officer.

Contracting Officer: Andrew G. Jacobs Telephone #: (510) 637-5874 E-Mail: Andrew.G.Jacobs@uscg.mil Fax #: (510) 637-5877

Alternate Contracting Officer(s): Any warranted USCG SFLC CPD Contracting Officer

Contract Administrator (Contract Specialist): Serves as the point of contact between the Contractor and the Contracting Officer(s); however, this person does not have a warrant that provides the authority to contractually commit the Government.

Contract Specialist: Mei S Chan Telephone #: (510) 637-5813 E-Mail: Mei.S.Chan@uscg.mil Fax #: (510) 637-5877

The Contracting Officer’s Representative (COR): Is a Government employee designated in writing by the Contracting Officer to act as a technical advisor for the Contracting Officer for services/items within the scope of the contract. The COR performs functions such as review and/or inspection and acceptance of supplies and services and of a technical nature. A designation letter will set forth the name of the COR and the authorities and limitations of the COR under the contract. This person does not have a warrant that provides the authority to contractually commit the Government or to modify any terms and conditions of a contract.

COR: LT Joe Holler Telephone #: 206-217-6834 E-Mail: Joseph.R.Holler@uscg.mil

(3) Block 17a: Contractor shall include company’s DUNS number

Block 17b: Remittance Address

Payment will be made by Electronic Funds Transfer (EFT) to the Financial Institution listed in the System for Award Management (SAM). To receive an award the Contractor must be registered in the System for Award Management (SAM) http://www.sam.gov.

(4) Blocks 18a and 18b: Invoice Procedures

INVOICE SUBMISSION PROCESS:

1. The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services.

(A) The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice each contract line item (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

(B) A CLIN may not be invoiced until the percentage complete reaches 25 percent. Future invoices for that CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each CLIN may be waived by the Contracting Officer on a case by case basis for large dollar CLINS.)

(C) In addition to the information required by FAR 52.212-4 (g) Invoices shall include:

1) Contract Number, Delivery Order/Task Order Number, DOC Number

2) Name and Address of the Contractor

3) Invoice Number and Invoice Date

4) DUNS Number

5) Name of the Contract Specialist and Contracting Officer’s

6) Invoice Routing Code (IRC): SFLC-2

7) Indicate Small Business Status

8) Indicate if Final Invoice, the Contractor’s final invoice submitted under the contract must be marked as follows: THIS INVOICE CONSTITUTES THE FINAL INVOICE – UPON

PAYMENT OF THIS INVOICE NO OTHER MONIES ARE DUE UNDER CONTRACT

NUMBER (to be assigned upon contract award).

9) The percentage of completion for each CLIN identified;

10) Vessel name

11) The overall percentage and dollar amount previously billed, currently billed and unbilled,

12) Shipping and Payment Terms

13) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.

All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.

2. The Contractor shall forward invoices via e-mail Joseph.R.Holler@uscg.mil or in person to the contracting Officer’s Technical Representative (COR).

3. The COR shall review and verify invoices, sign the invoice and return the invoice to the Contractor.

4. The Contractor shall complete the Contractor Invoice Submission Form (listed below).

5. The Contractor shall submit the Contractor Invoice Submission Form, a PDF file of the invoice, and any necessary documents for supplies or services via the U.S. Coast Guard Finance Center website at:

https://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm Contractor Invoice Submission Form

Directions: Please complete as much information as possible. All blocks in red text are required entries.

Note: Web-Invoices are accepted only for Coast Guard Contracts over the Simplified Acquisition Threshold (Document Type 24).

THIS WEB FORM IS NOT AN OFFICIAL INVOICE. THE OFFICIAL INVOICE MUST BE ATTACHED

Invoice Information Invoice Routing Code:

(help) Invoice Number: (help)

Contract Number: (help) Invoice Date: (help)

BPA Number: (help) Invoice Amount: (help)

Delivery/Task Order Number: (help) Discount Terms: %

Discount Days: Net Days: (help) Company Information Attachment of Official Invoice

Company Name: (help)

DUNS: Plus 4: (help)

Point of Contact Name: (help)

Point of Contact Email: (help)

Phone: (help) Fax: (help)

Please verify your entry on the next page. Attach invoice and any supporting documentation after verification.

Attachment must be a single PDF file no larger than 3 MB. Grey-scale PDFs are not compatible. This will be our official invoice. Supporting documentation must be combined in the single PDF file or submitted to your contracting office separately via email.

Need help creating a PDF file? Click here for instructions.

6. The Contractor must select the correct Invoice Routing Code for timely invoice processing. The Invoice Routing Code for this contract is SFLC-2.

7. Visit the U.S. Coast Guard Finance Center Website for instructions regarding invoice attachments.

http://www.fincen.uscg.mil/electron.htm

8. A copy of the invoice and any supporting documentation shall also be e-mailed to the following individuals:

COR: LT Joe Holler, Joseph.R.Holler@uscg.mil Contract Specialist: Mei Chan, Mei.S.Chan@uscg.mil

Payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount.

NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD UNTIL ALL DELIVERABLES,

REQUIRED BY THE CONTRACT, ARE RECEIVED AND ACCEPTED.

FURTHER CONSIDERATIONS WITH INVOICING:

SFLC-2

MM/DD/YY

0.00

00.00

0 30

Verify Reset

In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

(i) For invoices that are mailed the date a proper invoice is actually received by the designated billing office and annotates the invoice with date of receipt at the time of receipt.

(ii) For invoices electronically transmitted by the Contractor via web based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or

(iii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—

a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date;

(2) On the date placed on the invoice by the Contractor, when the agency fails to annotate the invoice with date of receipt of the invoice at the time of receipt (such invoice must be a proper invoice); or

(3) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

(4) Web based submission by the Contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

(5) For inquiries and payment status please visit: http://www.fincen.uscg.mil/electron.htm

The Data Universal Numbering System (DUNS) number is the primary identifier in System for Award Management (SAM), formally known as Central Contractor Registration (CCR), (see FAR 52.232-33, Payment by Electronic Funds Transfer-- System for Award Management (Jul. 2013)). Contractors are located and identified in SAM by their DUNS number. Therefore, to facilitate payment, the DUNS number shall be recorded on every invoice submitted to the U.S. Coast Guard.

All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.

Any amount deemed not payable will be deducted from the Contractor’s invoice. Deducted amounts may be resubmitted on the next invoice for reconsideration.

(5) Blocks 19-24: Schedule of Supplies/Services – See Attachment 1 Section B – Schedule of Supplies/Services

CONTRACT TYPE:

This solicitation is a Request for Quote (RFQ) which will result in the award of a firm fixed price contract using procedures in FAR Part 12, Acquisition of Commercial Items and FAR Subpart 13.5, Simplified Procedures for Certain Commercial Items.

CONTRACT PERIOD OF PERFORMANCE:

Work covered by this solicitation shall be completed within fifty-two (52) calendar days from the date the vessel becomes available to the Contractor. The performance period is from 08/02/2016 to 09/23/2016. The availability is scheduled to start on or about 08/02/2016.

DISCOVERIES AND CHANGES TO CONTRACT:

Work requests can be transmitted electronically by using email. The bullets below display the process of how work requests are to be followed during an availability:

Work Request Process will occur in the following order:

1. Condition Found Report-Generated by the contractor and provided to COR (Contracting Officer’s Representative)

2. Condition Report Reply-Generated by the COR and provided to Contractor

3. Work Request- WR and IGE are generated by the COR and forwarded to KO

4. COR provides copy of Work Request to the Contractor

5. Contractor’s Proposal- Provided to the KO for the identified tasking on WR

6. Negotiations- If needed, take place to establish pricing

7. Approved Work Request- Forwarded to Contractor and COR by the KO

8. Modification to Contract- The KS/KO will issue a modification covering all WR’s

SCHEDULE OF SUPPLIES/SERVICES:

Insert individual prices in Attachment 1- Section B Schedule of Supplies/ Services and insert totals of extended prices.

Base Contract Line Item Numbers (CLINs) are marked as “D” for Definitive. Option CLINS are marked “O” for Optional. Insert unit prices all CLINs listed in the schedule unless “NSP” is printed in the Unit Price column for any CLIN. “NSP” is printed in the Unit Price column for any CLIN. “NSP” in the section means “Not Separately Priced”.

Additional Work Items may be added on the comprehensive List of Work items as determined necessary by the contracting officer to accommodate work efforts that may be required during the dockside repair of a 175 foot Coastal Buoy Tender.

(6) Blocks 25: Accounting and Appropriation Data

ACCOUNTING AND APPROPRIATION DATA: To be included on contract award document.

(7) Blocks 26: Total Award

DESCRIPTION OF WORK:

This requirement is for contractor to provide all necessary labor, material, services, equipment, supplies, power, accessories, facilities and such other things as are necessary, except as otherwise specified to perform dockside repairs to the U.S. Coast Guard Cutter (USCGC) HENRY BLAKE (WLM-563) in accordance with this solicitation and attachment specifications. All work will be performed at the cutter’s home port or Coast Guard Base Seattle, Pier 36/37.

(a.) Failure to read the specifications in their entirety will not relieve the offeror from the responsibility for properly estimating the difficulty or price of successfully performing the work. Failure to do so will be at the offeror's risk.

b.) This acquisition will be solicited in accordance with FAR Part 19.502-2 Total Small Business set aside.

REQUIRED DOCUMENTS:

Each offeror shall furnish the information required by the solicitation, which includes:

1. Signed 1449 with offeror’s address, DUNS and other information completed.

2. Attachment 1- Section B Schedule of Supplies/Services filled out with a cost associated with each

Contract Line Item Number (CLIN).

3. Solicitation RFQ Amendments

4. Past Performance Documentation

5. Small Business Self Certification for applicable set-aside (i.e.HUBZone, Small Business, SDVOSB, 8(a))

6. Welding Certifications and Procedures

7. Proof of Insurance (Statement of Coverage from current Insurance carrier)

8. List the names of ALL Sub-Contractor’s that your company intends to subcontract for the CLIN

Item(s) listed in the Schedule of Supplies/Services.

9. **ALL Technical Representative Certifications for BOTH PRIME AND

SUBCONTRACTORS as specified in the specification

PLEASE NOTE: QUOTES THAT DO NOT INCLUDE ALL REQUIRED DOCUMENTS MAY BE

CONSIDERED INCOMPLETE AND MAY NOT BE CONSIDERED.

All proposals submitted in response to this solicitation shall stand firm for 120 calendar days from the response date of this solicitation.

DELIVERABLES: Seven days after the contract has been awarded the contractor will generate a legible planning document as outlined in SFLC Standard Specification 0000 (3.2.5) to the KO and PE for a preliminary government review. Also a copy of the current planning document will be submitted to the KO and PE for weekly progress meetings. An arrival conference normally will be held within 48 hours of the scheduled start date.

ANTICIPATED AWARD DATE: This contract is expected to be awarded in May 2016. Work covered by this solicitation shall be completed within fifty-two (52) calendar days from the date the vessel becomes available to the Contractor. The performance period is from 02 August 2016 thru 23 September 2016.

QUESTIONS AND REQUEST FOR DRAWINGS: Orders for U.S. Coast Guard specification reference drawings must be placed within 10 days of the solicitation issue date and the last day to ask questions regarding this solicitation is 15 April 2016 10:00AM PST. After this date, further requests may not be accepted due to time constraint.

CONTRACT CLAUSES

FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL ITEMS (MAY 2015)

(ADDENDUM TO FAR 52.212-4)

FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of the Section Chief, CPD, C&P2 and shall not be binding until so approved.

(End of clause)

FAR 52.211-11 -- LIQUIDATED DAMAGES -- SUPPLIES, SERVICES, OR RESEARCH AND

DEVELOPMENT (SEPT 2000)

As prescribed in 11.503(a), insert the following clause in solicitations and contracts:

(a) If the Contractor fails to deliver the supplies or perform the services within the time specified in this contract, the Contractor shall, in place of actual damages, pay to the Government liquidated damages of $1,500.00 per calendar day of delay.

(b) If the Government terminates this contract in whole or in part under the Default -- Fixed-Price Supply and Service clause, the Contractor is liable for liquidated damages accruing until the Government reasonably obtains delivery or performance of similar supplies or services. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

(c) The Contractor will not be charged with liquidated damages when the delay in delivery or performance is beyond the control and without the fault or negligence of the Contractor as defined in the Default -- Fixed-Price Supply and Service clause in this contract.

(End of Clause)

FAR 52.217-7 OPTION FOR INCREASED QUANTITY – SEPARATELY PRICED LINE ITEM (MAR 1989) -

VARIATION

The Government may require the performance of the numbered line items, identified in the Schedule as option items, at the unit prices stated in the Schedule. The option quantities shown in the Schedule are estimates only. The Government has the right to require performance of these items at the quantities deemed necessary. Therefore, the Government may exercise an option item on more than one occasion during the contract performance period. The Contracting Officer will provide initial notification of the exercise of an option either verbally, by facsimile, or both.

When time is of essence, initial notification will be provided verbally followed within 24 hours by a facsimile of confirmation. A contract modification will be executed shortly thereafter to include those options wherein exercise notification was provided. Such options may be exercised at any phase during the contract performance period as stated herein, or any extension of the performance period. To maintain the contract performance period the Contractor shall commence performance of an option item immediately upon receiving initial notification; but, not later than 24 hours thereafter, unless proper sequencing of the work requires a delay in beginning performance of the option. In that case, the option item shall be commenced as soon as proper sequencing permits. The exercise of any option item listed in the Schedule will not normally extend the contract performance period. However, the Contracting Officer may consider a request by the Contractor for contract extension if an option is exercised after 50% of the contract performance period has expired.

FAR 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: https://www.acquisition.gov/?q=browse/far/52

FAR/HSAR Clauses incorporated by Reference

FAR

FAR 52.203-17

Contractor Employee Whistleblower Rights and Requirement To Inform Employees of Whistleblower Rights (Apr 2014)

FAR 52.204-13 System for Award Management Maintenance (Jul 2013) FAR 52.204-18 Commercial and Government Entity Code Maintenance (Jul 2015) FAR 52.211-15 Defense Priority and Allocation Requirements (APR 2008) DO N5 Rating

FAR 52.223-3

Hazardous Material Identification and Material Safety Data (JAN 1997) Alternate I (JUL 1995)

FAR 52.223-12 Refrigeration Equipment and Air Conditioners (MAY 1995)

FAR 52.228-5 Insurance – Work on a Government Installation (JAN 1997)

FAR 52.232-18 Availability of Funds (APR 1984) FAR 52.232-40 Providing Accelerated Payment to Small Business Subcontractors (DEC 2013) FAR 52.242-2 Production Progress Reports (APR 1991)

FAR 52.242-15 Stop Work Order (AUG 1989)

FAR 52.244-2 Subcontracts (Oct 2010) FAR 52.244-6 Subcontracts for Commercial Items (Oct 2015) FAR 52.245-1 Government Property (APR 2012) FAR 52.245-9 Use and Charges (APR 2012)

HSAR

HSAR 3052.211-70 Index for Specifications (DEC 2003) HSAR 3052.217-90 Delivery and Shifting of Vessel (DEC 2003) HSAR 3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work (DEC 2003) HSAR 3052.222-71 Strikes or Picketing Affecting Access to a DHS Facility (DEC 2003) HSAR 3052.223-90 Accident and Fire Reporting (DEC 2003)

HSAR 3052.223-70 REMOVAL OR DISPOSAL OF HAZARDOUS SUBSTANCES – APPLICABLE

LICENSES AND PERMITS (JUN 2006)

The Contractor shall have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s) removal or disposal services. If the Contractor does not currently possess these documents, it shall obtain all requisite licenses and permits within fifteen (15) days after date of award. The Contractor shall provide evidence of said documents to the Contracting Officer or designated Government representative prior to commencement of work under the contract.

(End of clause)

REQUIRED INSURANCE

The Contractor shall, at its own expense, procure and maintain the following kinds of insurance with respect to performance under the contract. In accordance with HSAR 3052.228-70, Insurance (DEC 2003), the Contractor shall furnish the Contracting Officer with proof of insurance for the duration of the contract, including:

1. Ship Repairer's Liability - $500,000 per occurrence.

2. Comprehensive General Liability - $500,000 per occurrence.

3. Full insurance coverage in accordance with the United States’ Longshoremen's and Harbor Worker's Act.

4. Full insurance coverage in accordance with the State's Workmen's Compensation Law (or its equivalent) for all places of performance under this contract.

HAZARDOUS WASTE

Contractors are required to comply with FAR 52.223-3, Hazardous Material Identification and Material Safety Data (JAN 1997) Alt I, the U.S. Coast Guard shipboard hazardous waste policy, as prescribed in COMDINST M16478.1B, and SFLC standard specifications. Disposal of all hazardous wastes shall be performed by the Contractor and the Contractor shall meet all federal and state requirements. The Contractor is also required to submit an acceptable hazardous waste management plan to the Port Engineer at the Arrival Conference. The plan will be reviewed by the facility hazardous waste manager. An acceptable plan must address, at a minimum, the following requirements:

(a) EPA and local authority hazardous waste generator ID numbers or registration of the Contractors, his transporters, and disposal facilities (TSDFs);

(b) An inventory of all hazardous chemicals, compounds and other agents brought aboard the facility accompanied by their respective Material Safety Data Sheets;

(c) A list of all anticipated hazardous wastes to be generated and a federal/state/local regulation cross reference list for those wastes;

(d) Waste collection and containment procedures;

(e) A hazardous material spill and cleanup plan including tools and materials that will be on hand and readily available to facility containment and cleanup;

(f) Training certification for the Contractor's hazardous waste manager.

VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS

(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations.

Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state’s “State Implementation Plan” (SIP) and the type/quantity of the Contractor’s regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.

(b) Contractors, therefore, must submit the following to the designated Port Engineer not later than two weeks after contract award:

1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;

2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places.

(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Port Engineer a letter, notarized under oath, that such documents are not required.

(d) Contractors will submit the following to the designated Port Engineer not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with SFLC Standard Spec 63000N, Section 5.3.1.

FAR 52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)

(a) Definition. “Ozone-depleting substance,” as used in this clause, means any substance the Environmental Protection Agency designates in 40 CFR Part 82 as--

(1) Class I, including, but not limited to, chlorofluorocarbons, halons, carbon tetrachloride, and methyl chloroform; or

(2) Class II, including, but not limited to hydro chlorofluorocarbons.

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j (b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:

Warning

Contains (or manufactured with, if applicable) *_______, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

* The Contractor shall insert the name of the substance(s).

Welding Certifications And Qualifications

This solicitation may contain welding line items as either Definitive or Optional Items. With his/her quote the Contractor shall provide the necessary welding certifications and qualifications as required by the specification for the applicable work item(s), and MLCA/SFLC Standard Specification 0740. Subsequent to contract award, the Government will require the Contractor to submit applicable certifications and qualifications to the COR for any welding to be performed on any proposed change request.

INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the Contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

The name and telephone number of the U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

GROWTH WORK

(a) The Contractor shall not perform growth work without the Contracting Officer's authorization.

Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced CLIN.

The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm, fixed price, when it is in the best interest of the Government. If a firm-fixed price contract is awarded, and during the performance period a repair within scope is identified but the Contracting Officer and Contractor are unable to agree on the cost of the work, a bilateral modification may be incorporated into the contract using a Time and Materials modification for this specific repair.

(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted on an SFLC 002 proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.

(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each bench trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the Contractor and shall be included in the Composite Labor Rate. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., MILSPEC, FEDERAL SPEC.

DISCOVERIES AND CHANGES TO CONTRACT:

Work requests can be transmitted electronically by using email. The bullets below display the process of how work requests are to be followed during the availability:

Work Request Process will occur in the following order:

(1) Condition Found Report (CFR)-Generated by the Contractor and provided to COR

(1) Condition Report Reply(CRR)-Generated by the COR and provided to Contractor

(2) Work Request - WR and IGE are generated by the COR and forwarded to KO

(3) COR provides copy of Work Request to the Contractor

(4) Contractor’s Proposal- Provided to the KO for the identified tasking on WR

(5) Negotiations- If needed, take place to establish pricing

(6) Approved Work Request- Forwarded to Contractor and COR by the KO

(7) Modification to Contract- The KS/KO will issue a modification covering all WR’s

In order to determine price reasonableness: All change requests that list sub-contracting and/or material must have a written proposal from the sub-contractor or the company providing the material with complete, detailed information (listing number of hours/price per hour; each part/component & associated cost; and an estimated shipping cost).

Condition Found Report and Change Orders will be transmitted electronically by using email. The below display the process of how these documents are to be followed for the duration of the contract performance period:

(a) Condition Found Report (CFR) - All readings and inspections are to be taken within 24 hours after the machinery or system is opened. All reports of reading and inspections required by the specifications shall be submitted to the COR in writing using a "Condition Found Report (CFR)" form, within 24 hours after the readings and/or inspections are made.

Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the contractor which is considered abnormal for reasons of safety, expected reliability, health, or habitability. These conditions must be brought to the attention of the Coast Guard using a CFR. Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change progress, the Contractor should include in his/her CFR the following details as a minimum:

(i) A sequential number.

(ii) The contract item which the "CFR" relates to.

(iii) A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials and dimensions as appropriate.

(iv) A proposed or recommended repair to correct the defective condition.

(v) Indicate whether the report requires Cost Guard action, or if it is provided "for info" only. If action is required, indicate the response time required by the Coast Guard and whether or not a contract extension would be needed if the additional work is authorized.

(vi) A space on the form for the Coast Guard to make comments.

(vii) All CFR's will be dated, submitted, and signed by a representative of the Contractor.

Contracting Officer’s Representative (COR) will respond to the Contractor’s within 24 hours of receiving a Condition Found Report. A copy of ALL condition found reports shall be retained in the Cutter’s file.

(b) Change Request Process will occur when the contemplated change is above $3,000.00 in the following order:

9. Condition Found Report-Generated by the contractor and provided to COR .

10. Condition Report Reply-Generated by the COR and provided to Contractor

11. Change Request- CR and IGE are generated by the COR and entered in the Contract Workbook. COR will assign the Change request number.

12. COR provides copy of Change Request to the Contractor

13. Contractor’s Proposal- Provided to the KO for the identified tasking on CR

14. Negotiations- If needed, take place to establish pricing

15. Approved Change Request- Forwarded to Contractor and COR by the KO

Change Request must be submitted by the COR to the contractor within 24 hours after responding to the CFR.

Contractor must submit proposal to the Contracting Officer within 72 hours receipt of the Change Request.

A modification will be issued to incorporate and implement all changes made by change orders.

MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT PROPERTY IN THE

PERFORMANCE OF A SHIP REPAIR CONTRACT

1. The Government Property Clause FAR 52-245-1 incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific CLIN Items.

These items and their values are listed in the specification, b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.

2. The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc. The Contractor shall sign for all government furnished property using either a DD Form 1149, entitled, “Requisition and Invoice/Shipping Document” or a DD Form 1348, entitled, “Issue Release/Receipt Document”. A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the Contractor at time of award. The Contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.

3. The Contractor shall complete the report provided herein, entitled, “Government Property Report”. This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a and b) above shall be reported on the report. At contract completion the Contractor and the Property Administrator shall ensure that all fields are appropriately completed. A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all Government property took over the course of the contract. This completed report must accompany the Contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.

4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The Contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.)

or surplus government property not used during performance of the contract.

CONTRACTING OFFICER’S AUTHORITY

No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

CONTRACTOR PERFORMANCE EVALUATION

(a) GENERAL: The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror’s past performance of this contract and prepare a Contractor Performance Assessment Report (CPAR) in accordance with FAR Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.

(b) NOTIFICATION: Upon completion of the contract, the Contractor will be notified of the assessment. The

Contracto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .