Questions_and_Answers_1.doc

DOC document 23 KB Posted

Attached to
DRY DOCK REPAIRS FY2016 FOR USCGC WIRE (WYTL-65612)
Solicitation number
HSCG85-16-Q-P45279
Issued by

About this file

Questions and Answers 1 - DRY DOCK REPAIRS FY2016 FOR USCGC WIRE (WYTL-65612) - HSCG85-16-Q-P45279

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers #1

Solicitation Number: HSCG85-16-Q-P45279 - DRY DOCK REPAIRS FY2016 FOR USCGC WIRE (WYTL-65612) Q: Item O-007 Please, provide QTY of FT:

A: APPROXIMATELY 6 FT TOTAL, NON-LINEAR

Q: Item D-027 Under paragraph 3.1.2 there is no Tech. Rep required but paragraph 3.2 & 3.3 calls for a Technical Rep to supervise work. Please, clarify. Also, piano wire is acceptable for alignment or laser alignment is required?

A: NO TECH REP IS NECESSARY UNLESS THE CONTRACTOR CANNOT COMPLETE THE WORK IN HOUSE. LASER ALIGNMENT IS REQUIRED.

Q: Item D-030 Scope calls for 18 sqft and paragraph 3.2 for 10 sqft. Is 18 sqft a typo mistake? Please, clarify.

A: 18 ft…the 10 ft is the typo mistake.

Q: For items 003, 004, 005 & 006 repair up to 8 sqft of steel plate and 030, 031 & 032 repair up to 10 sqft of steel plate – will the repairs be done in one increment? If there are small increments, what is the minimum plating size?

A: They are small increments; the smallest being approximately 6”x6” of each item.

Q: For item 029: Please, provide minimum sqft of spot abatement of lead-based paint

A: 140 sq ft is the minimum.

File details come from the government source that posted it. Updated .