ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES
B.1
CLIN 0001 - DEFINITE ITEMS
These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| ITEM NO. |
| DESCRIPTION |
| UNIT OF ISSUE |
| AMOUNT |
| D-01 |
| Hull, 3D Laser Scan |
| 1 JB |
| $ |
| D-02 |
| Tanks (Ballast), Inspect |
| 1 JB |
| $ |
| D-03 |
| Hull Plate, Repair |
| 1 JB |
| $ |
| D-04 |
| Hull Plating (U/W Body), Ultrasonic Testing |
| 1 JB |
| $ |
| D-05 |
| Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair |
| 1 JB |
| $ |
| D-06 |
| Chain Lockers, Clean and Inspect |
| 1 JB |
| $ |
| D-07 |
| Voids (Non-Accessible), Leak Test |
| 1 JB |
| $ |
| D-08 |
| Voids (Non-Accessible), Preserve Internal Surfaces |
| 1 JB |
| $ |
| D-09 |
| Propulsion Shaft Seals (Mechanical), Inspect and |
Clean
| D-10 |
| Propulsion Shaft Alignment Check and Bearings |
(External) Check Clearances
| D-11 |
| Controllable Pitch Propeller System, General |
Maintenance
| D-12 |
| Controllable Pitch Propeller Hub Assembly, General |
Maintenance
| D-13 |
| Fathometer Transducer (Shallow Water), Renew |
| 1 JB |
| $ |
| D-14 |
| Fathometer Transducer (Deep Water), General |
Maintenance
| D-15 |
| Doppler Speed Log, General Maintenance |
| 1 JB |
| $ |
| D-16 |
| Doppler Speed Log, Valve, Overhaul |
| 1 JB |
| $ |
| D-17 |
| Sea Valves and Waster Pieces, Overhaul or Renew |
| 1 JB |
| $ |
| D-18 |
| Seawater Strainers (All Sizes), Overhaul and Inspect |
| 1 JB |
| $ |
| D-19 |
| Port and Starboard Steering Actuator, Overhaul |
| 1 JB |
| $ |
| D-20 |
| Rudder, Inspect and Repair |
| 1 JB |
| $ |
| D-21 |
| Rudder Stock Seals, Clean and Inspect |
| 1 JB |
| $ |
| D-22 |
| Bow Thruster Unit (General), Overhaul |
| 1 JB |
| $ |
| D-23 |
| Anchors, Chains, and Stoppers, Inspect and |
Preserve
| D-24 |
| Transom Doors, Inspection and Repair |
| 1 JB |
| $ |
| D-25 |
| Stern Ramp, Partial Preservation |
| 1 JB |
| $ |
| D-26 |
| Tanks (JP-5), Clean and Inspect |
| 1 JB |
| $ |
| D-27 |
| Hull Plating, Underwater Body Preserve,100 % |
| 1 JB |
| $ |
| D-28 |
| Hull Plating Freeboard, Preserve “100%” |
| 1 JB |
| $ |
| D-29 |
| Cathodic Protection, Zinc Anode Renew |
| 1 JB |
| $ |
| D-30 |
| Impressed Current Cathodic Protection System, |
Inspect and Maintain
| D-31 |
| Impressed Current Cathodic Protection System |
Reference Cells, Renew
| D-32 |
| Temporary Services, Dry-dock Provide |
| 1 JB |
| $ |
| ITEM NO. |
| DESCRIPTION |
| UNIT OF ISSUE |
| AMOUNT |
| D-34 |
| Dry-docking, Accomplish |
| 1 JB |
| $ |
| D-35 |
| Deck, Preserve |
| 1 JB |
| $ |
| D-36 |
| Main Propulsion Diesel Engine Sea Chest Suctions, |
Modify
| D-37 |
| Sounding Tubes, Replace |
| 1 JB |
| $ |
| TOTAL AMOUNT OF ALL DEFINITE ITEMS |
| 1 JB |
| $ |
B.2
CLIN 0002 - OPTIONAL ITEMS
The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s). See ATTACHMENT 3, Section 19, Page 9, entitled “OPTIONAL ITEMS.”
| ITEM NO. |
| DESCRIPTION |
| UNIT OF ISSUE |
| AMOUNT |
| O-38 |
| Plate Renewal |
| 1 JB |
| $ |
| O-39 |
| Propulsion Shaft Sleeve, Skim Cut |
| 1 JB |
| $ |
| O-40 |
| Intermediate Shaft Sleeve, Skim Cut |
| 1 JB |
| $ |
| O-41 |
| Propulsion Shaft Bearing (Fwd Strut And Stern Tube) Stave Renewal |
| 1 JB |
| $ |
| O-42 |
| Propulsion Shaft Coating, Inspect, Test, and Repair- |
Optional
| O-43 |
| Propulsion Shaft Coating, Inspect, Test, and Repair–Shafts In |
| 1 JB |
| $ |
| O-44 |
| Propulsion Shafting, Remove, Inspect, and Reinstall |
| 1 JB |
| $ |
| O-45 |
| Ballast Tanks, Preserve “Partial” |
| 1 JB |
| $ |
| O-46 |
| Ballast Tanks, Preserve 100% |
| 1 JB |
| $ |
| O-47 |
| Chain Locker, Preserve 100% |
| 1 JB |
| $ |
| O-48 |
| Tanks (JP-5), Preserve 100% |
| 1 JB |
| $ |
| O-49 |
| Impressed Current Cathodic Protection System |
Anodes, Renew
| O-50 |
| Impressed Current Cathodic Protection System |
Dielectric Shield, Repair
| O-51 |
| Impressed Current Cathodic Protection System |
Dielectric Shield, Renew
| O-52 |
| Line Shaft Bearing, Shim and Adjust |
| 1 JB |
| $ |
TOTAL AMOUNT OF ALL OPTIONAL ITEMS
| TOTAL – ALL DEFINITE & OPTIONAL ITEMS |
| $ |
B.3
COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES
The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 16, Pages 6-7, entitled "COMPOSITE LABOR RATE.”
LABOR HOUR RATE
ESTIMATED QUANTITY
6,647 hours
EXTENDED AMOUNT
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.
B.4
LAY DAYS
Provide a price for dry dock Lay Days in accordance with HSAR 3052-217-94 (DEC 2003). The quoted price per day will apply to all lay days.
| PRICE PER DAY |
| ESTIMATED QUANTITY |
| EXTENDED AMOUNT |
**NOTE: The estimated quantity of Three (3) days is for evaluation purposes only.