Amendment_0002.pdf
PDF 77 KB Posted
- Attached to
- USCGC WAESCHE (WMSL 751) DRY DOCK & REPAIRS FY15
- Solicitation number
- HSCG85-15-R-P45282
About this file
Amendment 0002
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. CONTRACT ID CODE PAGE OF PAGES
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable) 0002 Jan 7, 2015
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
USCG COMMAND
Surface Forces Logistics Centers, C&PD2-LREPL 1301 Clay Street, Suite 800N, Oakland, CA 94612
SAME AS BLOCK #6
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
TO ALL PROSPECTIVE OFFERORS
HSCG85-15-R-P45282
9B. DATE (SEE ITEM 11)
December 19, 2014
10A. MODIFICATION OF CONTRACT/ORDER
NO. ?
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SUBJECT: RFP No. HSCG85-15-R-P45282 CGC WAESCHE (WMSL 751), Dry Dock & Repairs FY15
SEE PAGE 2 FOR DESCRIPTION
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)PREVIOUS
EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243
HSCG85-15-R-P45282
CGC WAESCHE (WMSL 751) Dry Dock & Repairs FY15 Amendment No. 0002
The purpose of this amendment is to:
1. Extend the proposal due date to January 22, 2015, 5:00 p.m. Pacific Time. Due to the time constraint for this requirement, we can only extend the solicitation until this date.
2. Extend the Requests for Clarification due date to January 13, 2015 at 1:00 p.m.
3. Reply to the following Requests for Clarification:
Question 1: This is in reference to Definite Item D-10; Propulsion Shaft Alignment Check and Bearings (External) Check Clearances – Please provide a copy of drawing No. 750- WMSL-244-001, entitled “Propulsion Shafting Alignment Analysis and Weardown Study” NGS Drawing No. ASC835006.
Answer: A copy of this drawing is attached to this amendment.
Question 2: This is in reference to Optional Item O-46; Ballast Tanks, Preserve 100% -
Paragraph 3.2 – This paragraph calls out for the surface preparation of the tanks listed in Table 1 (Section 1.1) to be power tool cleaned in lieu of using abrasive blasting. Request clarification if these tanks be blasted in lieu of power tooling.
Answer: The Contractor may elect to abrasive blast to SSPC-10/near-white in lieu of mechanical prep.
Question 3: This is in reference to Optional Item O-48; Tanks (JP-5), Preserve 100%;
Paragraph 3.4 – This paragraph calls out to power tool the tank listed in Table 1 (Section 1.1) in lieu of using abrasive blasting. Request clarification if this is to be blasted in lieu of power tooling and request clarification on the % of Tank coating repair to be accomplished.
Answer: The Contractor may elect to abrasive blast to SSPC-10/near-white in lieu of mechanical prep. The area of work is 100% of surface area to include all structural members in addition to the requirements of 3.1.4.
| Amendment 0002 |
| Amendment 0002 page 2 |
File details come from the government source that posted it. Updated .