Attachment 1 Draft Spec Lead and Asbestos Abatement
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment__6_IBCT_Cutters_and_Barges_by_Homeport_Location.xlsx | XLSX spreadsheet | |
| Attachment__4_Draft_Sample_Task_Order_IDIQ_Lead_Asbestos_Abatement.pdf | ||
| Attachment__2_Draft_SLFC_Std_Spec_0000.pdf | ||
| Attachment__3_Draft_Pricing_Schedule.pdf | ||
| Attachment__5_Customer_Survey_Questions_IDIQ_Lead_and_Asbestos.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment #1: Draft Lead & Asbestos Abatement
IDIQ Specification for Abatement FY2015
Lead & Asbestos Abatement
SPECIFICATION FOR ABATEMENT
FY2015
(Draft-3, 10 February 2015)
LEAD AND ASBESTOS ABATEMENT FY2015
ii (Draft-3)
TABLE OF CONTENTS
Revisions Record ............................................................................................................................................................. iii
Consolidated List of References ................................................................................................................................ iv
Consolidated List of Government-furnished Property............................................................................................. viii
Consolidated List of Critical Inspection Items ............................................................................................................... ix
General Requirements
WORK ITEM 1: Electrical Cable, Renew
WORK ITEM 2: Interferences, Remove and Reinstall
WORK ITEM 3: Contaminated Loose Gear, Dispose
WORK ITEM 4: Ship Structures, Test for Presence of Hazardous Material
WORK ITEM 5: Lead Dust, Clean
WORK ITEM 6: Lead-Based Paint and Asbestos-Containing Material, Abate or Encapsulate
WORK ITEM 7: Lead-Based Paint, Abate or Encapsulate
WORK ITEM 8: Ship Structures, Perform ACM Condition Assessment iii (Draft-3)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE
REV#
WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Draft-3)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 101 WTGB 801-008, Rev N, Booklets of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements and Profile
Coast Guard Drawing 160 WLIC 0103-2, Rev A, Booklet of General Plans
Coast Guard Drawing 180 TE 0103-007, Rev 3, Booklet Of General Plans
Coast Guard Drawing 180-TE 103-5, Rev J; Booklet of Plans (BLUEBELL) (313)
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklets of General Plans (65613-65615)
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 75 WAGL 0103-4, Rev A, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile (75401-05)
Coast Guard Drawing 75D WAGL 0103-3, Rev -, Booklet Of Gen Plans (75307)
Coast Guard Drawing 75E WLR 0103-3, Rev-, Booklet Of General Plans
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6”
Barge http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Draft-3)
Coast Guard Drawing 100A CGB 320-001, Rev -, Electrical One Line Diagram
Coast Guard Drawing 100A CGB 6401-001, Rev -, Isomatric & Block Diagrams of 110V Lighting &
Power for 100’-0” x 30’-0” x 6’-6” Special Barge
Coast Guard Drawing 100B CGB 320-002, Rev -, Electrical One Line Diagram
Coast Guard Drawing 100B CGB 6201-001, Rev 2, 110V Power, Lighting, & LC Systems Elementary &
Deck Wiring Diagram
Coast Guard Drawing 100B CGB 6202-001, Rev 1, Power System – 220V Elementary & Isometric
Wiring Diagram
Coast Guard Drawing 101 WTGB 320-001, Rev AE, Power System One Line Diagram
Coast Guard Drawing 120 Barge 320-002, Rev F, Electrical One Line Diagram
Coast Guard Drawing 130 CGB67 301-002, Rev 7, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB67 301-006, Rev 6, Barge Electrical List of Materials & Misc Details
Coast Guard Drawing 130 CGB68 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB68 301-006, Rev 1, Barge Electrical List of Materials & Misc Details
Coast Guard Drawing 130 CGB69 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB69 301-006, Rev 1, Barge Electrical List of Materials & Misc Details
Coast Guard Drawing 130 CGB70 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB70 301-006, Rev -, Barge Electrical List of Materials & Misc Details
Coast Guard Drawing 130 CGB71-77 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB71-77 301-006, Rev -, Barge Electrical List of Materials & Misc Details
Coast Guard Drawing 140 WTGB 320-001, Rev -, Power System One Line Diagram
Coast Guard Drawing 160 WLIC 6202-015, Rev K, One Line Electrical Diagram
Coast Guard Drawing 180 TE 6201-012, Rev A, BLUEBELL Electrical One Line Diagram
Coast Guard Drawing 180 TE 6202-009, Rev H, Electrical Distribution One Line Diagram
Coast Guard Drawing 642 WAGL 6201-009, Rev -, Electrical One Line Diagram (USCGC
BUCKTHORN)
Coast Guard Drawing 642 WAGL 6401-003, Rev -, Electrical Power & Lighting Arrangement/Details
Coast Guard Drawing 65 WD 6201-006, Rev A, Electrical One Line Block & Elementary Wiring
Diagram (OUACHITA)
Coast Guard Drawing 65 WD 6201-007, Rev -, Electrical One Line Block & Elementary Wiring Diagram
(CIMARRON)
Coast Guard Drawing 65B WD 6201-004, Rev E, Electrical One Line Block & Elementary Wiring
Diagram (OBION)
Coast Guard Drawing 65B WD 6201-007, Rev D, Electrical One Line Block & Elementary Wiring
Diagram (SANGAMON)
Coast Guard Drawing 65B WD 6201-008, Rev C, Electrical One Line Block & Elementary Wiring
Diagram (SCIOTO)
Coast Guard Drawing 65B WD 6201-009, Rev C, Electrical One Line Block & Elementary Wiring
Diagram (OSAGE) vi (Draft-3)
Coast Guard Drawing 65 WYT 6201-001, Rev F, Electrical Systems Diagrammatic
Coast Guard Drawing 65 WYT 6201-002, Rev -, Electrical System One Line Diagram (CAPSTAN
65601)
Coast Guard Drawing 65 WYT 6202-005, Rev B, Electrical Systems Diagrammatic
Coast Guard Drawing 65B WYT 6202-001, Rev F, Elementary Wiring Diagram, Light, Power, & Nav
Lights (65607-12)
Coast Guard Drawing 65B WYT 6202-004, Rev E, Elementary Wiring Diagram, Light, Power, & Nav
Lights (65614-15)
Coast Guard Drawing 65B WYT 6202-005, Rev A, Power & Light Deck Plan (65613-15)
Coast Guard Drawing 65B WYT 6202-006, Rev -, Elementary Wiring Diagram, Light, Power, & Nav
Lights (65613)
Coast Guard Drawing 68 CGB 6202-001, Rev A, Electrical Installation
Coast Guard Drawing 68B CGB 6401-001, Rev -, Electrical System
Coast Guard Drawing 68B CGB 6401-002, Rev -, Electrical System
Coast Guard Drawing 70 CGB 6000-001, Rev 1, 70'-0" x 30'-0" x 7'-6" Steel Barge Electrical Plan
Coast Guard Drawing 75 WAGL 6201-012, Rev G, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75 WAGL 6201-013, Rev F, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75B WAGL 6201-012, Rev M, Electrical Distribution One Line Diagram
Coast Guard Drawing 75B WAGL 6201-013, Rev F, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75B WAGL 6201-014, Rev G, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75C WAGL 6201-006, Rev A, Electrical One Line Block Wiring Diagram
(CHEYENNE)
Coast Guard Drawing 75C WAGL 6201-008, Rev B, Electrical One Line Block Wiring Diagram
(GASCONADE)
Coast Guard Drawing 75C WAGL 6201-027, Rev C, Electrical One Line Block Wiring Diagram
(MUSKINGUM)
Coast Guard Drawing 75C WAGL 6201-028, Rev C, Electrical One Line Block Wiring Diagram
(CHIPPEWA)
Coast Guard Drawing 75D WAGL 6201-005, Rev A, Electrical One Line Block Wiring Diagram
(WEDGE)
Coast Guard Drawing 75D WAGL 6201-012, Rev G, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75D WAGL 6201-014, Rev F, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75D WAGL 6201-015, Rev -, Electrical One Line Block & Elementary Wiring
Diagram
Coast Guard Drawing 75E WLR 6201-004, Rev A, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75E WLR 6201-005, Rev -, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75E WLR 6201-006, Rev -, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75E WLR 6201-007, Rev -, Electrical One Line Block Wiring Diagram vii (Draft-3)
Coast Guard Drawing 75F WLR 0300-001, Rev 12, Electrical One Line Diagram
Coast Guard Drawing 75 WLIC 320-001, Rev E, Power System One Line
Coast Guard Drawing 75 WLIC 321-001, Rev A, Power System Deck Plan
Coast Guard Drawing 75 WLIC 321-002, Rev -, Main Cableways Arrangement & Details
Coast Guard Drawing 75 WLIC 331-001, Rev A, Lighting System Deck Plan
Coast Guard Drawing 84 CGB 6201-001, Rev 1, Electrical System
Coast Guard Drawing 90B CGB 6201-002, Rev -, Isometric & Block Diagram of 220V Power Schematic of Jetting Pump Control Circuit (24 VDC) for 90’ x 24’ x 6’6” Special Barge
Coast Guard Drawing 90B CGB 6401-002, Rev -, Isometric & Block Diagram of 115V Lighting & Power for 90’ x 24’ x 6’6” Special Barge
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST)_M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electric Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair and Installation
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards
Code of Federal Regulations (CFR) Title 33 CFR, Jul 2013, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment
Code of Federal Regulations (CFR) Title 49, Oct 2013, Transportation
MIL-STD-2003-3, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships &
Submarines (Penetrations)
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal viii (Draft-3)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
This section is not applicable to this package.
ix (Draft-3)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
This section page is not applicable to this specification package.
1 (Draft-3)
00000_1214_FLT
REC_00000_FLT_ MATOC Dockside (1014)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting Vessel repairs performed for assets under MATOC by Commercial Contractor at CG Facility for Coast Guard vessels.
2. REFERENCES
None
Coast Guard Commandant Instruction (COMDTINST)_M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
ASTM International (ASTM) 6966, 2008, Standard Practice for Collection of Settled Dust Samples Using
Wipe Sampling Methods for Subsequent Determination of Metals
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2008, Occupational Safety and Health
Standards
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Draft-3)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with (COMDTINST)_MI0360.3C , Chapter 11 (Cutter and Boat Colors Exterior and Interior).
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is as designated in the
Task Order.
3.5.2.2 Plans and permits. As designated in the Task Order, the CG Facility has unit specific permits including the following:
3.5.3 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.
3 (Draft-3)
3.5.4 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.5 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40
CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.6 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.7 Additional Requirements. The Contractor shall be aware of the following:
3.5.7.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.7.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.7.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
4 (Draft-3)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
Vessel Name Hull # Work Item # Work Item Title
Location of Work (incl. frame #’s) Area (sqft)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down
(maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max.
threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _/ ; Return to service or removal from environment controls: /
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Name of QP-1/NACE Inspector Signature Cert. # Date / Time
5 (Draft-3)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE &
TIME
ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION
(Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL.
HUMID-
ITY DEW
PT.
SURFACE
AMBIENT
ΔT
| DP -
Surface |
6 (Draft-3)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
Abrasive Manufacturer and Sieve Size:
Location of Work (Frame References) Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Reading: mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:
7 (Draft-3)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
Abrasive Manufacturer and Sieve Size:
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils) Min Max Mean
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading:
mils
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
8 (Draft-3)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
9 (Draft-3)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
Coating Mfg Product Name Batch # Induction
Time Coating System Sequence
(Primer/Touchup/3rd Coat, etc.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL
READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference):
SPOT 1 2 3 4 5
Overall Avg. DFT
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Avg.
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
ADJUSTMENTS
1 Avg. BMR Deviation 3 Before
Adjustments After Adjustments
Application Method (Airless, Conventional Spray, Rolled) Average DFT
10 (Draft-3)
1_MATOC_30432_ElctrclCblRnew_PWB_1214_ALLDDDSS
WORK ITEM 1: Electrical Cable, Renew
1.1 Intent. This work item describes the requirements for the Contractor to renew ACM contaminated electrical cables, as designated in the Task Order.
1.2 Government-furnished property.
None.
Coast Guard Drawing 100A CGB 320-001, Rev -, Electrical One Line Diagram
Coast Guard Drawing 100A CGB 6401-001, Rev -, Isomatric & Block Diagrams of 110V
Lighting & Power for 100’-0” x 30’-0” x 6’-6” Special Barge
Coast Guard Drawing 100B CGB 320-002, Rev -, Electrical One Line Diagram
Coast Guard Drawing 100B CGB 6201-001, Rev 2, 110V Power, Lighting, & LC Systems
Elementary & Deck Wiring Diagram
Coast Guard Drawing 100B CGB 6202-001, Rev 1, Power System – 220V Elementary &
Isometric Wiring Diagram
Coast Guard Drawing 101 WTGB 320-001, Rev AE, Power System One Line Diagram
Coast Guard Drawing 120 Barge 320-002, Rev F, Electrical One Line Diagram
Coast Guard Drawing 130 CGB67 301-002, Rev 7, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB67 301-006, Rev 6, Barge Electrical List of Materials & Misc
Details
Coast Guard Drawing 130 CGB68 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB68 301-006, Rev 1, Barge Electrical List of Materials & Misc
Details
Coast Guard Drawing 130 CGB69 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB69 301-006, Rev 1, Barge Electrical List of Materials & Misc
Details
Coast Guard Drawing 130 CGB70 301-002, Rev -, Barge Electrical Power & Lighting One Lone
Diagram
Coast Guard Drawing 130 CGB70 301-006, Rev -, Barge Electrical List of Materials & Misc
Details
11 (Draft-3)
Coast Guard Drawing 130 CGB71-77 301-002, Rev -, Barge Electrical Power & Lighting One
Lone Diagram
Coast Guard Drawing 130 CGB71-77 301-006, Rev -, Barge Electrical List of Materials & Misc
Details
Coast Guard Drawing 140 WTGB 320-001, Rev -, Power System One Line Diagram
Coast Guard Drawing 160 WLIC 6202-015, Rev K, One Line Electrical Diagram
Coast Guard Drawing 180 TE 6201-012, Rev A, BLUEBELL Electrical One Line Diagram
Coast Guard Drawing 180 TE 6202-009, Rev H, Electrical Distribution One Line Diagram
Coast Guard Drawing 642 WAGL 6201-009, Rev -, Electrical One Line Diagram (USCGC
BUCKTHORN)
Coast Guard Drawing 642 WAGL 6401-003, Rev -, Electrical Power & Lighting
Arrangement/Details
Coast Guard Drawing 65 WD 6201-006, Rev A, Electrical One Line Block & Elementary Wiring
Diagram (OUACHITA)
Coast Guard Drawing 65 WD 6201-007, Rev -, Electrical One Line Block & Elementary Wiring
Diagram (CIMARRON)
Coast Guard Drawing 65B WD 6201-004, Rev E, Electrical One Line Block & Elementary
Wiring Diagram (OBION)
Coast Guard Drawing 65B WD 6201-007, Rev D, Electrical One Line Block & Elementary
Wiring Diagram (SANGAMON)
Coast Guard Drawing 65B WD 6201-008, Rev C, Electrical One Line Block & Elementary
Wiring Diagram (SCIOTO)
Coast Guard Drawing 65B WD 6201-009, Rev C, Electrical One Line Block & Elementary
Wiring Diagram (OSAGE)
Coast Guard Drawing 65 WYT 6201-001, Rev F, Electrical Systems Diagrammatic
Coast Guard Drawing 65 WYT 6201-002, Rev -, Electrical System One Line Diagram
(CAPSTAN 65601)
Coast Guard Drawing 65 WYT 6202-005, Rev B, Electrical Systems Diagrammatic
Coast Guard Drawing 65B WYT 6202-001, Rev F, Elementary Wiring Diagram, Light, Power, &
Nav Lights (65607-12)
Coast Guard Drawing 65B WYT 6202-004, Rev E, Elementary Wiring Diagram, Light, Power, &
Nav Lights (65614-15)
Coast Guard Drawing 65B WYT 6202-005, Rev A, Power & Light Deck Plan (65613-15)
Coast Guard Drawing 65B WYT 6202-006, Rev -, Elementary Wiring Diagram, Light, Power, &
Nav Lights (65613)
Coast Guard Drawing 68 CGB 6202-001, Rev A, Electrical Installation
Coast Guard Drawing 68B CGB 6401-001, Rev -, Electrical System
Coast Guard Drawing 68B CGB 6401-002, Rev -, Electrical System
Coast Guard Drawing 70 CGB 6000-001, Rev 1, 70'-0" x 30'-0" x 7'-6" Steel Barge Electrical
Plan
Coast Guard Drawing 75 WAGL 6201-012, Rev G, Electrical One Line Block & Elementary
Wiring Diagram
Coast Guard Drawing 75 WAGL 6201-013, Rev F, Electrical One Line Block & Elementary
Wiring Diagram
12 (Draft-3)
Coast Guard Drawing 75B WAGL 6201-012, Rev M, Electrical Distribution One Line Diagram
Coast Guard Drawing 75B WAGL 6201-013, Rev F, Electrical One Line Block & Elementary
Wiring Diagram
Coast Guard Drawing 75B WAGL 6201-014, Rev G, Electrical One Line Block & Elementary
Wiring Diagram
Coast Guard Drawing 75C WAGL 6201-006, Rev A, Electrical One Line Block Wiring Diagram
(CHEYENNE)
Coast Guard Drawing 75C WAGL 6201-008, Rev B, Electrical One Line Block Wiring Diagram
(GASCONADE)
Coast Guard Drawing 75C WAGL 6201-027, Rev C, Electrical One Line Block Wiring Diagram
(MUSKINGUM)
Coast Guard Drawing 75C WAGL 6201-028, Rev C, Electrical One Line Block Wiring Diagram
(CHIPPEWA)
Coast Guard Drawing 75D WAGL 6201-005, Rev A, Electrical One Line Block Wiring Diagram
(WEDGE)
Coast Guard Drawing 75D WAGL 6201-012, Rev G, Electrical One Line Block & Elementary
Wiring Diagram
Coast Guard Drawing 75D WAGL 6201-014, Rev F, Electrical One Line Block & Elementary
Wiring Diagram
Coast Guard Drawing 75D WAGL 6201-015, Rev -, Electrical One Line Block & Elementary
Wiring Diagram
Coast Guard Drawing 75E WLR 6201-004, Rev A, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75E WLR 6201-005, Rev -, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75E WLR 6201-006, Rev -, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75E WLR 6201-007, Rev -, Electrical One Line Block Wiring Diagram
Coast Guard Drawing 75F WLR 0300-001, Rev 12, Electrical One Line Diagram
Coast Guard Drawing 75 WLIC 320-001, Rev E, Power System One Line
Coast Guard Drawing 75 WLIC 321-001, Rev A, Power System Deck Plan
Coast Guard Drawing 75 WLIC 321-002, Rev -, Main Cableways Arrangement & Details
Coast Guard Drawing 75 WLIC 331-001, Rev A, Lighting System Deck Plan
Coast Guard Drawing 84 CGB 6201-001, Rev 1, Electrical System
Coast Guard Drawing 90B CGB 6201-002, Rev -, Isometric & Block Diagram of 220V Power
Schematic of Jetting Pump Control Circuit (24 VDC) for 90’ x 24’ x 6’6” Special Barge
Coast Guard Drawing 90B CGB 6401-002, Rev -, Isometric & Block Diagram of 115V Lighting
& Power for 90’ x 24’ x 6’6” Special Barge
13 (Draft-3)
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electric Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation
MIL-STD-2003-3, Sep 2009, Electric Plant Installation Standard Methods for Surface Ships &
Submarines (Penetrations)
3.1 General.
3.1.1 CIR.
3.1.2 Tech Rep
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec
0000, paragraph 3.3.5 (Interferences).
3.1.5 Hazardous material disclosure. The Contractor shall be aware asbestos in excess of 1% is present in the existing coating and/or insulation wrapping that covers the electrical cables that have been designated for renewal.
3.1.6 Operational test - initial. Prior to commencement of work, the Contractor shall witness Coast
Guard Personnel perform an initial operational test of equipment, to demonstrate existing operational condition. Submit a CFR.
3.2 Abatement particulars. The Contractor shall accomplish the tasks specified below, using all applicable drawings as listed in Section 2 herein.
14 (Draft-3)
3.2.1 Removal. Disconnect, remove, and dispose of all designated ACM-covered cable segments, in accordance with Section 3.2 of SFLC Std Spec 3042. Abide by all requirements applicable to ACM abatement, as specified in SFLC Std Spec 0000, Appendix A or Appendix B.
3.2.2 New installation. Furnish, install and connect new cables, in place of removed, in accordance with
Sections 3.1 and 3.6 of SFLC Std Spec 3042. Verify that replacement wiring is equivalent in standard to the removed wiring before installation. Renew packing for each disturbed stuffing tube; materials shall not be older than manufacturer’s recommended shelf life. For new cables that are too small for existing stuffing tubes, install bevel reducing adapter assemblies in accordance with Figure 3B38 of MIL-STD-
2003-3.
3.2.3 Testing. For each disturbed circuit, ensure that the following tests are performed as applicable:
The cable insulation resistance test of SFLC Std Spec 3041, as directed by SFLC Std Spec
3042, paragraph 3.6.7.
The water hose test of Appendix C of SFLC Std Spec 0740, as directed by SFLC Std Spec
3042, paragraph 3.6.9, to verify that disturbed weather deck stuffing tube packing is watertight.
The air hose test of Appendix C of SFLC Std Spec 0740, as directed by SFLC Std Spec 3042, paragraph 3.6.9, to verify that disturbed bulkhead stuffing tube packing and multi-cable transit inserts are watertight.
The polarity verification or phase rotation test of SFLC Std Spec 3042, paragraph 3.6.12.
3.3 Operational test – post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate all items or shipboard devices that have been disturbed, used, repaired, altered, or installed to be in satisfactory operating condition. Submit a CFR.
This section is not applicable to this work item.
Coast Guard personnel will operate all shipboard machinery and equipment
NOTES
1. SFLC Std Spec 0000, Appendix A applies to availabilities performed at contractor operated (non-USCG) facilities; Appendix B pertains to work accomplished at USCG facilities.
2. Abatement specific requirements in Appendix A or B of SFLC Std Spec
0000 include, but are not limited to the following:
+ Additional protective measures.
+ HAZMAT removal.
+ Waste disposal.
3. Asbestos aggressive sampling will be addressed as part of a separate work item in this specification package.
15 (Draft-3)
2_MATOC 07000_Intrfrnc_PWB_1214_ALLDDDSS
WORK ITEM 2: Interferences, Remove and Reinstall
1.1 Intent. This work item describes the requirements for the Contractor to remove and reinstall interferences, as designated in the Task Order.
General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
3.1.2 Tech Rep.
Not applicable
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
16 (Draft-3)
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and
0000, paragraph 3.3.5 (Interferences). Be aware of the following:
List of interferences will be provided in the Task Order.
Cost of interference removal and reinstallation will negotiated upon receipt of the Task
Order.
17 (Draft-3)
3_MATOC_00021_MscGrDspsl_ PWB_0115_ALLDDDSS
WORK ITEM 3: Contaminated Loose Gear, Dispose
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and
1.1 Intent. This work item describes the requirements for the Contractor to test and dispose of various Lead dust and/or ACM-contaminated loose gear, as designated in the Task Order.
1.2 Government-furnished property.
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
3.1.2 Tech Rep.
Not applicable
18 (Draft-3)
3.2 Gear disposal particulars. The Contractor shall accomplish the following tasks, for the designated gear, using in accordance with SFLC Std Spec 0000, Appendix A or B, as applicable.
3.2.1 Gear suspected of being lead-contaminated.
3.2.1.1 Unship all designated loose gear to a suitable and secure location, away from weather.
3.2.1.2 Perform Toxicity Characteristics Leaching Procedures (TCLP) sampling for each gear, to determine hazard classification, in accordance with 40 CFR Part 261. Submit CFR with results.
3.2.1.3 Segregate and weigh contaminated gear and non-contaminated gear, separately. Submit a CFR with results.
3.2.1.4 Dispose of removed gear in accordance with all applicable Federal, state, and local regulations – based on hazard classification.
3.2.2 Gear designated as being asbestos-contaminated.
3.2.2.1 Unship all designated ACM-contaminated loose gear to a suitable and secure location, away from weather.
3.2.2.2 Weigh all contaminated gear. Submit a CFR with results.
3.2.2.3 Dispose of removed gear in accordance with all applicable Federal, state, and local regulations.
NOTES
1. SFLC Std Spec 0000, Appendix A applies to availabilities performed at contractor operated (non-USCG) facilities; Appendix B pertains to work accomplished at USCG facilities.
2. Equipment designated as ACM-contaminated will not require hazardous classification determination.
19 (Draft-3)
4_MATOC_59300_HZMTTstng_ PWB_0115_ALLDDDS
WORK ITEM 4: Ship Structures, Test for Presence of Hazardous Material
1.1 Intent. This work item describes the requirements for the Contractor to test for the presence of the following hazardous materials (HAZMAT) onboard various vessels, as designated in the Task Order.
Lead dust.
Lead-based paint (LBP).
Asbestos-containing material (ACM).
Airborne asbestos.
Coast Guard Drawing 65B WYT 0103-8, Rev D, Booklets of General Plans (65613-65615)
Coast Guard Drawing 75 WAGL 0103-4, Rev A, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile
(75401-05)
Coast Guard Drawing 75D WAGL 0103-3, Rev -, Booklet Of Gen Plans (75307)
Coast Guard Drawing 75E WLR 0103-3, Rev-, Booklet Of General Plans
Coast Guard Drawing 75F WLR 070-001, Rev 2, Booklet Of General Plans
Coast Guard Drawing 642 WAGL 0103-4, Rev F, Booklet Of General Plans
Coast Guard Drawing 180-TE 103-5, Rev J; Booklet of Plans (BLUEBELL) (313)
Coast Guard Drawing 180 TE 0103-007, Rev 3, Booklet Of General Plans
Coast Guard Drawing 101 WTGB 801-008, Rev N, Booklets of General Plans
Coast Guard Drawing 160 WLIC 0103-2, Rev A, Booklet of General Plans
Coast Guard Drawing 68B CGB 0103-8, Rev 1, General Arrangement Plan and Outboard Profile
Coast Guard Drawing 70 CGB 0103-1, Rev 1, Outboard Profile and Deck Plans
Coast Guard Drawing 84 CGB 0103-2, Rev 4, General Arrangement Plan, and Outboard Profile
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x
6’-6” Barge
Coast Guard Drawing 100A CGB 0103-1, Rev 1, Booklet of General Plans
Coast Guard Drawing 120 BARGE 601-001, Rev C, General Arrangement and Profile
20 (Draft-3)
Coast Guard Drawing 130 CGB 71-77 085-001, Rev B, General Arrangements and Profile
General Requirements
Code of Federal Regulations (CFR) Title 29, Part 1910, Jul 2013, Occupational Safety and Health
Standards
Code of Federal Regulations (CFR) Title 40, Jul 2013, Protection of the Environment
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the
Contractor shall remove all installed protective measures, inspect for the presence of contamination, and
3.1.5 Location identification. As part of testing process for LBP and ACM, ensure that deck numbers, compartment names and frame numbers are used to document locations where each sample has been taken. Be aware that the frames are the ribs of the ship and serve as vertical boundaries for compartments.
Compartment numbers consist of four parts, separated by hyphens, in the following sequence (example:
2-20-3-L):
1) Deck number
2) Frame number
3) Position relative to ship centerline
4) Use of compartment
3.1.6 Report submissions. Expedite shipment and analysis of all sample results for receipt within two business days. Submit all laboratory test results as CFRs.
21 (Draft-3)
3.2 Testing particulars. The Contractor shall accomplish the following tasks:
3.2.1 Lead dust. Take lead dust wipe samples in the designated locations, as specified in the sub-paragraph paragraph titled “Lead dust wipe sampling” SFLC Std Spec 0000, Appendix A or B, as applicable, in locations designated by the Coast Guard inspector.
3.2.2 LBP. Remove paint chip samples in each designated location, ensuring each sample is approximately one square inch in size; and of a uniform cross section of all layers of paint, down to the metal substrate. In addition, ensure the following:
Each paint chip is secured in a sterile container or bag.
Each location of removed samples is marked with a suitable chalked identifier immediately adjacent to it, and the container or bag is also marked with the same identifier.
Ensure testing equipment and/or method is capable of providing results down to a lead level below .009 percent by weight (0.018 mg/cm2, or 90 ppm).
3.2.2.1 Wipe down a one square foot area surrounding each paint chip sample using a suitable lead dust cleaning solution. Dispose of all consumables in accordance with the requirements and all federal, state, and local regulations.
3.2.2.2 Ship all samples for analysis by a laboratory certified by the National Lead Laboratory
Accreditation Program (NLLAP) or the American Industrial Hygiene Association.
3.2.3 ACM - bulk sampling. Conduct bulk asbestos sampling, in locations where damage and failure are observed. Do not obtain samples in locations where coatings are found in an intact condition, unless otherwise authorized by the KO.
3.2.3.1 Method. Bulk samples shall be collected, in accordance with 29 CFR 1910.1001 and 40 CFR
763.86, submitted to an independent laboratory accredited by the National Voluntary Laboratory
Approval Program (NVLAP), and analyzed using EPA Method 600/R-93/116 by Polarized Light
Microscopy (PLM). Samples shall be placed in container, sealed, assigned unique sample identification number, and shipped.
3.2.3.2 Sample. Each bulk sample shall be one square inch or one cubic inch - depending on the type of material.
3.2.4 Airborne asbestos.
3.2.4.1 Take aggressive air samples in each designated compartment, using the Phase Contrast
Microscopy (PCM) method to determine that the level of airborne fibers for each sample.
3.2.4.2 Perform aggressive air sampling in accordance with EPA 600/4-85-049. Ensure asbestos samples are analyzed by a laboratory certified by the National Voluntary Laboratory Accreditation Program
(NVLAP) or the Environmental Laboratory Approval Program (ELAP).
NOTE
For a listing of certified laboratories, go to www.aiha.org.
http://www.aiha.org/
22 (Draft-3)
3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec
6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.).
3.3.1 If the Government selects to perform abatement in a sample location, no touch-up of that location is required.
3.3.2 If lead concentration at a sample location was detected less than what is specified in Table 1, then coat all disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.).
3.3.3 If the Government does not select to perform abatement in a sample location where lead concentrations were detected in excess what is specified in Table 1, then coat all exposed surfaces, to match existing adjacent surfaces. In lieu of abiding by the feathering guidance provided in SFLC Std
Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs), build up new coating to overlap all existing adjacent coating edges.
3.4 Chain of custody. The Contractor shall document a complete chain of custody record of the removed paint chips from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
Reason for not feathering edges is to prevent generating lead dust.
23 (Draft-3)
5_MATOC_59300_LeadDustCln_ PWB_1214_ALLDDDS
WORK ITEM 5: Lead Dust, Clean
1.1 Intent. This work item describes the requirements for the Contractor to clean and remove lead dust contamination in various locations, as designated in the Task Order.
Coast Guard Drawing 75 WAGL 0103-4, Rev A, Booklet of General Plans
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plans & Outboard Profile
(75401-05)
C…