ATTACHMENT 2 - Schedule of Supplies/Services

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES

B.1

CLIN 0001 - DEFINITE ITEMS

These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.

ITEM NO.
DESCRIPTION
AMOUNT
D-02
Sea Valves and Waster Pieces, Overhaul or Renew
$
D-03
Sea Strainers - Duplex (All Sizes), Overhaul
$
D-04
Port Steering Actuator, Overhaul
$
D-05
Rudder Stock Seals, Clean and Inspect
$
D-06
Rudder, Inspect and Repair
$
D-07
Doppler Speed Log, General Maintenance
$
D-08
Doppler Speed Log, Valve, Overhaul
$
D-09
Hull Plating (U/W Body), Ultrasonic Testing
$
D-11
Hull Plating, Underwater Body Preserve,100 %
$
D-12
Stern Ramp, Preservation
$
D-13
Bilges (Machinery Space) Preserve – Aft Main Machinery Room, Forward Main Machinery Room, and Auxiliary Machinery Room
D-14
Sideport Shell Door, Inspect and Repair
$
D-15
Hull Plating Freeboard, Preserve - Partial
$
D-16
Voids (NonAccessible), Leak Test
$
D-17
Voids (Non-Accessible), Preserve Internal Surfaces
$
D-18
Controllable Pitch Propeller System General Maintenance
$
D-19
Propulsion Shaft Fairwaters and Rope Guards, Inspect and Repair
$
D-20
Propulsion Shaft Coating, Inspect, Test, and Repair – Shafts In Place
$
D-21
Propulsion Shaft Alignment Check and Bearings (External) Check Clearances
$
D-22
Propulsion Shaft Seals (Mechanical), Inspect and Clean
$
D-24
Hubs General Maintenance
$
D-26
Bow Thruster Unit, General Overhaul
$
D-28
Impressed Cathodic Protection System, Inspect and Maintain
$
D-32
Hull Plate Repair
$
D-33
Tanks (Ballast), Preserve “Partial”
$
D-34
Tanks (Ballast), Inspect
$
D-35
Tanks (JP-5), Preserve
$
D-36
Tanks (Potable Water), Clean and Inspect
$
D-37
Tank Sounding Tube, Replacement
$
D-38
Chain Lockers, Clean and Inspect
$
D-39
Anchors, Chains, and Stoppers, Inspect and Preserve
$
D-40
Main Diesel Engine Sea Chest Suction Modification
$
D-41
Transom Doors, Inspection and Repair
$
D-42
SSDG #3 Exhaust Piping, Cleaning & Inspection
$
D-43
#3 SSDG Exhaust Valve, Overhaul
$
D-44
Temporary Services, Dry-dock Provide
$
D-45
Drydocking Accomplish
$
D-46
Sea Trials
$
TOTAL AMOUNT OF ALL DEFINITE ITEMS
$

B.2

CLIN 0002 - OPTIONAL ITEMS

The following optional items may be exercised at time of award based on the availability of funds, but before December 24, 2013 to maintain performance schedule. See ATTACHMENT 3, Section 17, Page 8, entitled “OPTIONAL ITEMS.” The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

O-01
Chain Locker, Preserve 100%
$
O-10
Plate Renewal
$
O-23
Propulsion Shafting, Remove, Inspect, and Reinstall
$
O-25
Propulsion Shaft Bearing, (i.e. Strut Bearing or Stern Tube Bearing) Stave Renew – Shaft In Place
$
O-27
Impressed Current Cathodic Protection System Anodes, Renew
$
O-29
Impressed Current Cathodic Protection System Reference Cells, Renew
$
O-30
Impressed Current Cathodic Protection System Dielectric Shield, Repair
$
O-31
Impressed Current Cathodic Protection System Dielectric Shield, Renew
$
O-47
Tanks (Potable Water) Preserve “100%”
$
TOTAL AMOUNT OF ALL OPTIONAL ITEMS
$

B.3

COMPOSITE LABOR HOUR RATE APPLICABLE TO CONTRACT CHANGES

The following labor hour rate shall be used in pricing all contract changes in accordance with ATTACHMENT 3, Section 14, Page 5, entitled "COMPOSITE LABOR RATE.”

LABOR HOUR RATE

ESTIMATED QUANTITY

8,162 hours

EXTENDED AMOUNT

**NOTE: The estimated quantity and extended amount indicated above are for evaluation of proposals only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.

B.4

LAY DAYS

Provide a price for dry dock Lay Days in accordance with HSAR 3052-217-94 (DEC 2003). The quoted price per day will apply to all lay days.

PRICE PER DAY
ESTIMATED QUANTITY
EXTENDED AMOUNT
$
X 3 DAYS
$

**NOTE: The estimated quantity of Three (3) days is for evaluation purposes only.