HSCG85-12-R-P45P29 Gasconade Specification.doc
DOC document 3 MB Posted
- Attached to
- CGC GASCONADE (WLR 75401) FY13 IRESS DRYDOCKING
- Solicitation number
- HSCG85-12-R-P45P29
About this file
Specification
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0004_12RP45P29.pdf | ||
| Amendment0003_12RP45P29.pdf | ||
| GASCONADE PCB Lead Asbestos Reports | — | |
| HSCG85-12-R-P45P29 Gasconade Specification Rev 1.doc | DOC document | |
| Amendment0002_12RP45P29.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade Schedule of Supplies | — | |
| Amendment0001_12RP45P29.pdf | ||
| HSCG85-12-R-P45P29 Gasconade Solicitation.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade PP Questionnaire.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade Schedule of Supplies.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC GASCONADE (WLR 75401)
75 FOOT "C CLASS" RIVER BUOY TENDER
USCG 90 BARGE (90013)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2013
Developed By: Kristina L Lewis (Rev-0, 06 August 2012)
TABLE OF CONTENTS
ivRevisions Record vConsolidated List of References xConsolidated List of Government-furnished Property xiiiConsolidated List of Critical Inspection Items xvPrincipal Characteristics - Tender xviPrincipal Characteristics - Barge
1General Requirements
17WORK ITEM 1: Hull Plating (U/W Body), Inspect- Tender
21WORK ITEM 2: Hull Plating (U/W Body), Inspect - Barge
25WORK ITEM 3: Hull Plating (U/W Body), Ultrasonic Testing - Tender
28WORK ITEM 4: Hull Plating (U/W Body), Ultrasonic Testing - Barge
31WORK ITEM 5: Hull and Structural Plating (General) -10.2-Pound Steel, Repair – Tender (OPTIONAL)
33WORK ITEM 6: Hull and Structural Plating (General) -10.2-Pound Steel, Repair – Barge (OPTIONAL)
35WORK ITEM 7: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Repair – Tender (OPTIONAL)
37WORK ITEM 8: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Repair – Barge (OPTIONAL)
39WORK ITEM 9: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Repair – Barge (OPTIONAL)
41WORK ITEM 10: Hull and Structural Plating (General) - Cracked Steel Welds, Repairs – Tender (OPTIONAL)
43WORK ITEM 11: Hull and Structural Plating (General) - Cracked Steel Welds, Repairs – Barge (OPTIONAL)
45WORK ITEM 12: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair - Tender (OPTIONAL)
47WORK ITEM 13: Hull and Structural Plating (General) - Degraded Weld (Steel), Repair – Barge (OPTIONAL)
49WORK ITEM 14: Appendages (U/W), Leak Test - Tender
51WORK ITEM 15: Appendages (U/W) - Internal, Preserve - Tender (OPTIONAL)
53WORK ITEM 16: Tanks (MP Fuel Service), Clean- Tender
56WORK ITEM 17: Tanks (Potable Water), Clean - Barge
59WORK ITEM 18: Voids (Non-Accessible), Leak Test - Barge
62WORK ITEM 19: Voids (Non-Accessible), Preserve Internal Surfaces- Barge (OPTIONAL)
64WORK ITEM 20: Keel Coolers, Clean, Inspect and Hydro
68WORK ITEM 21: Sea Strainers (All Sizes), Renew
71WORK ITEM 22: Sea Strainers - Duplex (All Sizes), Overhaul
74WORK ITEM 23: Hull Fittings (Mooring and Towing), Inspect and Test - Tender
78WORK ITEM 24: Spud, Overhaul - Tender
82WORK ITEM 25: Spud, Overhaul - Barge
86WORK ITEM 26: Spud Well, Preserve - Tender
88WORK ITEM 27: Spud Well, Preserve - Barge
90WORK ITEM 28: Tanks (Sewage Holding), Preserve “100%” - Tender
93WORK ITEM 29: Decks - Exterior(Barge Buoy), Preserve 100%
96WORK ITEM 30: U/W Body, Preserve “100%” – Tender (OPTIONAL)
99WORK ITEM 31: U/W Body, Preserve “100%” – Barge (OPTIONAL)
102WORK ITEM 32: U/W Body, Preserve “Partial – Condition A” - Tender (OPTIONAL)
106WORK ITEM 33: U/W Body, Preserve “Partial – Condition A” - Barge (OPTIONAL)
109WORK ITEM 34: U/W Body, Preserve “Partial - Condition B” - Tender (OPTIONAL)
113WORK ITEM 35: U/W Body, Preserve “Partial - Condition B” - Barge (OPTIONAL)
116WORK ITEM 36: Hull Plating Freeboard (Buoy Port Areas), Preserve - Partial
120WORK ITEM 37: Drydocking- Tender
123WORK ITEM 38: Drydocking - Barge
125WORK ITEM 39: Temporary Services, Provide
128WORK ITEM 40: Sea Trial Performance, Provide Support
132WORK ITEM 41: Boat Davit Winch, Shrink Wrap
134WORK ITEM 42: Buoy and Cargo Handling Crane, Shrink Wrap
137WORK ITEM 43: Tanks (MP Fuel Service), Clean- Barge
140WORK ITEM 44: Decks – Exterior, Prepare {and Coat} (Pre Slip-Resistant Sheet Installation)
143WORK ITEM 45: Main Diesel Engine and Propulsion Shafting, Upgrade
158WORK ITEM 46: Steering Gear and Rudder Systems, Upgrade
167WORK ITEM 47: Bulkhead Repair
172WORK ITEM 48: Hull Repair
178WORK ITEM 49: Towing Knees Modifications
183WORK ITEM 50: Hull Fittings (Mooring and Towing), Inspect and Test - Barge
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 75 WAGL 0700-004, Rev -, Docking Plan
Coast Guard Drawing 75 WAGL 0700-004, Rev -, Docking Plan
Coast Guard Drawing 75 WAGL 4301-005, Rev L, Shafting Machining Details to suit IF 1312 MDE
Coast Guard Drawing 75 WAGL 4301-006, Rev F, Shaft Brake to suit IF 1312 MDE
Coast Guard Drawing 75 WAGL 4400-003, Rev J, Propeller to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 0103-23, Rev 4, Gen Design Plns & Outbd Profile (75401-05)
Coast Guard Drawing 75C WAGL 0700-025, Rev -, Docking Block Arrangement (‘C’ Class)
Coast Guard Drawing 75C WAGL 1101-001, Rev 1, Dk Plate Plan & Shell Expansion
Coast Guard Drawing 75C WAGL 1101-003, Rev C, Grid Cooler Pockets to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 1101-1, Rev 1, Dk Plate Plan & Shell Expansion
Coast Guard Drawing 75C WAGL 1103-024, Rev 2, Transverse Frames #15-22
Coast Guard Drawing 75C WAGL 1103-025, Rev -, Hull Framing Plan
Coast Guard Drawing 75C WAGL 1103-026, Rev -, Transverse Frames #23-28
Coast Guard Drawing 75C WAGL 1105-002, Rev 4, Longitudinal Girder XA17 R/L XD17 R/L – Longitudinal Bulkhead XB17 R/L and Longitudinal Deck Ls XG17
Coast Guard Drawing 75C WAGL 1107-008, Rev -, Stack Modifications to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 1108-021, Rev 3, Stack Details (75401 – 75405)
Coast Guard Drawing 75C WAGL 1112-005, Rev C, Main Engine Foundation Modifications to Suit 1312 MDE
Coast Guard Drawing 75C WAGL 1112-014, Rev -, Miscellaneous Foundations for Water Fog System
Coast Guard Drawing 75C WAGL 1112-015, Rev -, Miscellaneous Foundations to Suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 2200-004, Rev 4, Rudder Details (75401)
Coast Guard Drawing 75C WAGL 252-002, Rev H, Propulsion Control System to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 2602-1, Rev 2, Towing Knees and Spudwell (75401)
Coast Guard Drawing 75C WAGL 2602-2, Rev 5, 75 FT Towboat Spud Derrick and Spud (75401)
Coast Guard Drawing 75C WAGL 2901-021, Rev -, Tank CAPACITY - 95% Tables
Coast Guard Drawing 75C WAGL 3801-002, Rev F, Engine Room Vent Modifications to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 3801-024, Rev -, Engine Room Vent Sys Upgrade Vent & Plenum Arrg’t & Dets
Coast Guard Drawing 75C WAGL 3801-025, Rev D, Engine Room Ventilation System Power Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4000-002, Rev E, Machinery Arrgt Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4103-006, Rev G, Jacket Water Piping Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4103-024, Rev -, Main Engine Control Piping Arrgt
Coast Guard Drawing 75C WAGL 4103-033, Rev -, Exhaust Piping Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4103-034, Rev -, Misc Piping Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4105-001, Rev C, Remote Engine Shutdown to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4301-005, Rev 2, Stern Strut, Shaft Log, Stern Tube & Bulkhead Stuffing Box
Coast Guard Drawing 75C WAGL 4301-006, Rev F, Shafting Installation to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4301-021, Rev 2, Propulsion Shaft Layout
Coast Guard Drawing 75C WAGL 4803-004, Rev -, Engine Room Water Fog System
Coast Guard Drawing 75C WAGL 4803-023, Rev D, Machinery Space Fire Extinguishing System Wiring Diagram to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 4823-006, Rev -, Oily Water Holding Tank & Associated Piping
Coast Guard Drawing 75C WAGL 4901-006, Rev -, Compressed Air Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 5501-005, Rev -, Fuel Oil Service Mods to suit IF 1312 MDE
Coast Guard Drawing 75C WAGL 6201-008, Rev -, Electrical One line Block & Elementary Wiring Diag (GASCONADE)
Coast Guard Drawing 75C WAGL 6504-024, Rev -, 24VDC Alarms, Warnings and Gen. Shutdown Systems
Coast Guard Drawing 75C WAGL 700-025, Rev-, Docking Block Arrangement (‘C’ Class)
Coast Guard Drawing 75C-WAGL 103-1, Rev 2, Gen Design Plan & Otbd Profile (75401)
Coast Guard Drawing 75C-WAGL 1105-01, Rev 3, LONG BHDS & LONG & FR (75401)
Coast Guard Drawing 75C-WAGL 1901-21, Rev -, Painting Insul Sheath Dk Covering Sched
Coast Guard Drawing 75C-WAGL 2602-01, Rev 5, Towing Knees & Spudwell (75401)
Coast Guard Drawing 75C-WAGL-3802-22
Coast Guard Drawing 75C-WAGL-4803-1
Coast Guard Drawing 90 CGB 1101-1, Rev 3, 90-Ft. Barge Deck & Bottom Plating
Coast Guard Drawing 90 CGB 1101-2, Rev 1, 90-Ft Long'l Truss Diagonals & Side Plating
Coast Guard Drawing 90 CGB 1101-3, Rev 1, 90-Ft. Barge Hull Framing Plan
Coast Guard Drawing 90 CGB 2602-1, Rev 1, Spud and Spud Well Details
Coast Guard Drawing 90 CGB 4103-001, Rev 2, Barge Skin Cooling
Coast Guard Drawing 90B CGB 0103-1, Rev C, Outboard Profile and Arrangement for 90’x 24’x 6’-6” Barge
Coast Guard Drawing 90B CGB 0700-001, Rev -, Docking Plan for 90’ x 24’ x 6’-6” Spec Barge
Coast Guard Drawing 90B CGB 1103-002, Rev 1, Transverse Frames and Sections
Coast Guard Drawing 90B CGB 2901-002, Rev -, Tank CAPACITY - 95% Tables
Coast Guard Drawing 90B CGB 5501-001, Rev -, Fuel Oil Piping System
Coast Guard Drawing 90B CGB-0700-001, Rev -, Docking Plan for 90’ x 24’ x 6’-6” Spec Barge
Coast Guard Drawing 90B CGB-0700-001, Rev-, Docking Plan for 90’ x 24’ x 6’-6” Spec Barge
Coast Guard Drawing 90B CGB-1101-001, Rev 4, Fwd Rake, Deck, Bottom, & Side Long’l Truss- Ladder and Layout for 90’ x 24’ x 6’-6” Spec Barge
Coast Guard Drawing 90B CGB-1101-002, Rev -, Midship Deck, Bottom, & Side Plating for 90’ x 24’ x 6’-6” Spec Barge
Coast Guard Drawing 90B CGB-1101-003, Rev -1, After Rake Details for 90’ x 24’ x 6’-6” Spec Barge
Coast Guard Drawing 90B-CGB 1101-01, Rev 4, Fwd Rake Deck, Bottom & Side Plate - Long'l Truss Ladder & Layouts Special Barge
Coast Guard Drawing 90B-CGB 1101-02, Rev -, Midship Deck, Bottom & Side Pltg Spec. Barge
Coast Guard Drawing 90B-CGB 1101-03, Rev 1, After Rake Details For Special Barge
Coast Guard Drawing 90B-CGB 1103-02, Rev 1, Transv Fr & Sect for 90'x24'x6'-6" Spec Barge
Coast Guard Drawing 90B-CGB 1103-02, Rev 1, Transv Frames & Sections for 90'x24'x6'-6" Special Barge
Coast Guard Drawing 90B-CGB 1901-01, Rev -, Barge Painting, Insul & Sheathing Schedule
Coast Guard Drawing 90-CGB-4803-1, Jetting Fire & Diversion Piping Systems for 90’x24’x6’6” Special Barge Coast Guard Drawing 90CGB-4901-1, Air Piping System for 90’x 24’ x 6’-6” Special Barge Coast Guard Drawing 90B-CGB-8201-1, Boat Derrick, Stowage and Slings for 90’ x 24’ x 6’-6” Special Barge Coast Guard Drawing 90B-CGB-103-4, Outbd. Profile & Arrg’t 90’ x 24’ x 6’-6” Spec. Barge Coast Guard Drawing 75-WAGL-1112-2, Sewage Tank & Pump Fdns Coast Guard Drawing75C WAGL 0103-23, Rev 4, Gen Design Plns & Outbd Profile (75401-05)
Coast Guard Fleet Drawing FL 2602-10, Rev D, Spud Arrangements and Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual
Naval Sea Systems Command (NAVSEA) 0900-LP-060-4010, 1981, Fabrication, Welding & Inspection of Metal Boat & Craft Hulls
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, Jan 2009, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), Jan 2009, Shipboard Electric Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), Jan 2009, Shipboard Electrical Cable Removal, Relocation, Splice, Repair and Installation
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, Jan 2009, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning
OTHER REFERENCES
American Institute of Steel Construction (AISC), 2005 Specifications, Section M2.1
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects
American Welding Society (AWS) D1.1/D1.1M:2002, Structural Welding Code – Steel, Sections 5.26.5 and C8.5.5
ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D1709, 2008, Standard Test Methods for Impact Resistance of Plastic Film by the Free-Falling Dart Method
ASTM International (ASTM) D1922, 2008, Standard Test Method for Propagation Tear Resistance of Plastic Film and Thin Sheeting by the Pendulum Method
ASTM International (ASTM) D4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An)
ASTM International (ASTM) D882, 2009, Standard Test Method for Tensile Properties of Thin Plastic Sheeting
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
Commercial Item Description (CID) A-A-52624, Nov 2008, Antifreeze, Multi Engine Type, Ethylene Glycol (For Caterpillar equipment applications, use CAT Extended Life Pre-Mix coolant.)
Commercial Item Description (CID) A-A-52624, Sep 2001, Antifreeze, Multi Engine Type, Ethylene Glycol
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-D-16791, Jan 1993, Detergent, General Purpose (Liquid, Nonionic)
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
Ship Structure Committee (SSC) 207, Effects of Flame and Mechanical Straightening on Material Properties of Weldments, 1970.
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 1999, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
The Society for Protective Coatings (SSPC), June 1996, Paint Application Specification No. 2 (PA-2), Measurement of Dry Coating Thickness with Magnetic Gages
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating
US Department of Defense, United Facilities Criteria (UFC) 3-320-01A, March 2005, Welding – Design and Inspection
US Department of Transportation, Federal Highway Administration, Guide for Heat-Straightening of Damaged Steel Bridge Members, May 2011
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 21 |
| N |
| 1.5 inch Duplex Strainer |
| Hayward model #B148 |
| 1 ea |
| $1,338.90 |
| 21 |
| N |
| 1.5 inch Duplex Strainer |
| Eaton Filtration |
| 1 ea |
| $1,400.00 |
| 45 |
| Y |
| **Propeller shaft Ass’y for MDE changeout |
| From dwg 75-WAGL-4301-005 1610-01-F11-2288 |
| 2 ea. |
| $33,779.00 |
| 45 |
| N |
| Propeller for MDE changeout |
| NSN:RH 2010-01-534-9089; LH 2010-01-534-9095 |
| 2 ea. |
| $7,800 |
| 45 |
| N |
| Main Diesel Engine and Reduction Gear Set complete with all attached accessories |
| NSN: 3020-01-F11-2289 / P/N: V1312T1MLH-KC |
| 2 ea. |
| $91,545.00 |
| 45 |
| N |
| MDE & Gear Unattached Accessories including fuel filters, starting air components, jacket water 220 v hotstart, control and alarm panels, etc |
| 2 ea. |
| Included in above item |
| 45 |
| N |
| Finished Reduction Gear Shaft Coupling and Associated Bolting |
| With Propeller Shaft Ass’y, item #10 |
| 2 ea. |
| Included in above item |
| 45 |
| N |
| Strut Bearing (5.5” O.D. x 4.5” I.D. x 18” Long) |
| P/N: DURAMAX bronze, rubber NSN: 2840-01-F11-2275 |
| 2 ea. |
| 45 |
| N |
| Pedestal Pillow Block Bearing |
| COOPER P/N 02-BCP-408-EX-AT NSN: 3130-01-F11-2242 |
| 2 ea. |
| 45 |
| N |
| Bulkhead Seal Assembly |
| WARTSILA P/N: H70300 NSN: 2040-01-F11-2243 |
| 2 ea. |
| 45 |
| N |
| Stern Tube Seal Assembly |
| WARTSILA P/N: H74537-02 NSN: 2040-01-F11-2244 |
| 2 ea. |
| 45 |
| N |
| MDE Exhaust Muffler |
| NSN: 2990-01-F11-2245 / P/N: 49380U |
| 2 ea. |
| $2,100.00 |
| 45 |
| N |
| SSDG Exhaust Muffler |
| NSN: 2990-01-F11-2246 / P/N: 49440U |
| 2 ea. |
| $2,100.00 |
| 45 |
| Y |
| SSDG Grid Cooler |
| NSN: 2040-01-F11-2290 / P/N: SC-216DP-63 |
| 2 ea. |
| $3,000.00 |
| 45 |
| N |
| MDE Grid Cooler |
| NSN: 2040-01-F11-2291/ P/N: SC-418DP-114 |
| 2 ea. |
| $8,270.00 |
| 45 |
| N |
| Oily Water Pump & associated compressed air flter/regulator SANDPIPER Model P1FRS1FB1SBSYNS200 |
| NSN: 4320-01-F11-2261 |
| 1 ea. |
| $830.00 |
| 45 |
| N |
| Clear Command Processor Elec. ENG, SOL GR, 4 Station |
| P/N: MATHERS/ZF 96204 / NSN: 5865-01-F11-2249 |
| 2 ea. |
| $2,000.00 |
| 45 |
| N |
| Control Head-Heavy duty, Dual |
| P/N: MATHERS/ZF 760P NSN: 2010-01-598-5214 |
| 2 ea. |
| $2,300.00 |
| 45 |
| N |
| Serial Communication Harness, 50 Ft |
| P/N: MATHERS/ZF 13316-50 NSN: 5995-01-F11-2251 |
| 1 ea. |
| $130.00 |
| 45 |
| N |
| Wire Harness-Throttle, current, 20 Ft |
| P/N: MATHERS/ZF 13494-20 NSN: 5995-01-F11-2252 |
| 2 ea. |
| $122.00 |
| 45 |
| N |
| Clutch Wiring Harness 15 Ft |
| P/N: MATHERS/ZF 15719-15 NSN: 5995-01-F11-2253 |
| 2 ea. |
| $50,000.00 |
| 45 |
| N |
| Backup Control Panel, 3000 series |
| P/N: MATHERS/ZF 3200B NSN: 2090-01-F11-2254 |
| 1 ea. |
| 45 |
| N |
| Processor Smart Backup 4-20mA |
| P/N: MATHERS/ZF 3005BC NSN: 5998-01-F11-2255 |
| 1 ea. |
| 45 |
| N |
| Backup Panel Wiring Harness, Control |
| P/N: MATHERS/ZF 3301B-10 NSN: 5995-01-F11-2256 |
| 2 ea. |
| 45 |
| N |
| Wire Harness-Power and Start Interlock |
| P/N: MATHERS/ZF 13756-20 NSN: 5995-01-F11-2257 |
| 2 ea. |
| 45 |
| N |
| Backup Control Panel Wiring Harness, Power/Start Interlock |
| P/N: MATHERS/ZF 71708 NSN: 5995-01-F11-2271 |
| 1 ea. |
| 45 |
| N |
| Control Head Wiring Harness, Double Ended, 40 Ft. |
| P/N: MATHERS/ZF 14261-40 NSN: 6150-01-599-8980 |
| 2 ea. |
| 45 |
| N |
| Throttle Wire Harness, 4-20ma, N Interlock Interface |
| P/N: MATHERS/ZF 3603B-20 NSN: 5995-01-F11-2258 |
| 2 ea. |
| 45 |
| N |
| Smart Backup Clutch Wire Harness |
| P/N: MATHERS/ZF 3501B-20 NSN: 5995-01-F11-2259 |
| 2 ea. |
| 45 |
| N |
| Control Head Wire Harness, Double Ended, 100 Ft. |
| P/N: MATHERS/ZF 14261-100 NSN: 2030-01-F11-2260 |
| 2 ea. |
| 45 |
| N |
| Fiberglass Wall Mount Box (30.25”x24.25”x10”) |
| P/N: Hoffman A30H2410GQRLP NSN: 5670-01-599-2924 |
| 1 ea. |
| 45 |
| N |
| Panel (27”x21”) |
| P/N: Hoffman A30P24 NSN: 5342-01-222-4898 |
| 1 ea. |
| 45 |
| N |
| Fiberglass Wall Mount Box (17.5x14”x8.78”) |
| P/N: Hoffman A18149JFGQRR NSN: 5975-01-598-4207 |
| 2 ea. |
| 45 |
| N |
| Panel (14.75”x12.88”) |
| P/N: Hoffman A16P14 NSN: 5975-01-206-0986 |
| 2 ea. |
| 45 |
| N |
| Cable, 2 Conductor, 16 AWG Stranded, TC Drain Wire |
| P/N: Belden 8720 NSN: 6145-01-598-4205 |
| 100 ft. |
| 45 |
| N |
| Cable, 3 Conductor, Shielded, 14 AWG |
| P/N: Belden 9367 NSN: 4010-01-599-3191 |
| 50 ft. |
| 45 |
| N |
| Cable, 30 Conductor, Shielded LSMSCS-30 |
| NSN: 6145-01-202-6963 |
| 200 ft. |
| 45 |
| N |
| Cable, 4 Conductor, Shielded LS4SJ-16 |
| NSN: 6145-01-204-4867 |
| 100 ft. |
| 45 |
| N |
| Cable, 2 Conductor, LSDSGU-4 |
| NSN: 6145-01-202-2795 |
| 150 ft. |
| 45 |
| N |
| Cable, 37 Conductor, Shielded, LSMSCS-37 |
| NSN: 6145-01-202-6964 |
| 50 ft. |
| 45 |
| N |
| Cable, 3 Conductor, LSTSGU-4 |
| NSN: 6145-01-201-9498 |
| 20 ft. |
| 45 |
| N |
| Cable, 3 Conductor, Shielded LS3SJ-18 |
| NSN: 6145-01-202-7750 |
| 50 ft. |
| 45 |
| N |
| Cable, 2 Conductor, Shielded, LS2SJ-14 |
| NSN: 6145-01-202-7747 |
| 200 ft. |
| 45 |
| N |
| Switchboard Wire, 16 AWG, D-16 |
| NSN: 6145-00-756-2909 |
| 20 ft. |
| 45 |
| N |
| Terminal Board, 20 Terminal, Barrier Type |
| NSN: 5940-00-983-6061 |
| 2 ea. |
| 46 |
| N |
| Steering Rudder Assembly |
| Consisting of all components contained in elevation 10B on sheet 2 of 75 WAGL 2200-010 NSN: 2040-01-530-9095 |
| 2 ea. |
| $27,325.00 |
| 46 |
| N |
| Flanking Rudder Assembly |
| Consisting of all components contained in elevation 11A on sheet 2 of 75 WAGL 2200-011 NSN: 2040-01-531-4393 |
| 2 ea. |
| $39,514.00 |
| 46 |
| N |
| Seal assembly, rudder stock face |
| WARTSILA P/N: H75492-01 NSN: 2040-01-565-9776 |
| 4 ea. |
| $5,000.00 |
| 46 |
| Y |
| Jastram Steering Components |
$146,569.65
| Circuit Breaker, 3 pole, 240VAC, 60A, bolt-on |
| P/N: Square D QOB360 NSN: 5925-00-936-3933 |
| 1 ea |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 3 |
| Hull Plating (U/W Body), Ultrasonic Testing - Tender |
| 4 |
| Hull Plating (U/W Body), Ultrasonic Testing - Barge |
| 14 |
| Appendages (U/W), Leak Test - Tender |
| 15 |
| Appendages (U/W) - Internal, Preserve - Tender (OPTIONAL) |
| 18 |
| Voids (Non-Accessible), Leak Test - Barge |
| 20 |
| Keel Coolers, Clean, Inspect and Hydro |
PC_75C_WLR_75401_0712
Principal Characteristics - Tender
75’ WLR (‘C’ Class) CGC GASCONADE, INLAND RIVER BUOY TENDER
Physical Characteristics
| Length Overall |
| 75' 5-1/2" |
| Depth |
| 7' 8-1/2" |
| Maximum Beam |
| 22' 5" |
| Height of Highest Projection |
| N/A |
| Full Load Draft |
| 4' 6" |
| Full Load Displacement |
| 136.1 short tons |
| Shore Tie Voltage Requirements |
| 220V/ 3 Phase/ 60 Hz/ 200A |
| Frame Spacing |
| 1' 6" |
Machinery Characteristics
| Number of Propellers |
| 2 |
| Number of Blades |
| 4 |
| Diameter of Propeller |
| 48" |
| Pitch |
| 47" fixed |
| RPM |
| 410 |
PC_CGB_90_0712
Principal Characteristics - Barge
90' Barge (A, B, & C-CLASSES)
Physical Characteristics
| Length Overall |
| 90' 0" |
| Depth |
| 6' 6" |
| Maximum Beam |
| 24' 7" |
| Full Load Draft |
| 4’6” |
| Full Load Displacement |
| 180 LT |
| Shore Tie Voltage Requirements |
| 220V/ 3 Phase/ 60Hz/200A |
This page was left blank intentionally. Do not delete.
00000_PWB_0312_FLT
REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0212) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings
None.
Coast Guard Publications
Coast Guard Commandant Instruction (COMDTINST) M10360.3C, Change 1, Jun 2006, Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes
Other References
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:
3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.
3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.
3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.
3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.
3.5 Interim changes and additions to SFLC Std Spec 0000. The Contractor shall be aware of the following interim changes and additions to the 2009 Edition of SFLC Std Spec 0000:
3.5.1 Acronyms and term definitions – paragraph 1.3 (Acronym and term definitions).
3.5.1.1 The term “COTR” has been replaced with “COR”, which is defined as follows:
“COR”: Contracting Officer’s Representative – the person delegated by the KO as the on-scene representative for matters concerning performance of work; this includes correctness, timeliness, and quality of the Contractor’s work. Normally, the CO/OINC is designated the COR.”
3.5.1.2 Definition addition for the term “Ungrounded, as follows:
· “Ungrounded”: A power system where all of the current-carrying conductors and windings (including any neutral connection) are insulated from ground. In contrast, a generator or transformer in which at least one conductor or point (usually the midpoint or corner of a delta winding or the common center of a wye winding) is intentionally grounded, either solidly or through an impedance, is considered grounded. Note that the distinction concerns only current-carrying conductors; for both ungrounded and grounded power systems, non-current carrying metal parts and equipment grounding conductors are always bonded to earth ground for personnel safety. At non-Governmental facilities, dockside wye connected transformer secondary windings are almost always grounded and are generally not suitable for connection to a Coast Guard cutter without a separate Contractor furnished isolation transformer.”
3.5.2 Changes to paragraph 3.2.4 2.3 (QP-1 Inspector or Tech Rep duties).
“3.2.4.2.3 QP 1 Inspector or Tech Rep duties.
3.2.4.2.3.1 The Coating Inspector for the “QP 1-certified” Contractor or the Contractor-provided NACE-certified Tech Rep shall remain on site, to perform the following duties, as applicable, for each work item that involves preservation of “critical-coated surfaces”:
· Verify inspection instrument calibration.
· Verify and approve the suitability of ambient conditions before surface preparation is begun, and before each coat of paint is applied.
· Verify all aspects of surface preparation – including, but not limited to:
· Cleanliness of compressed air.
· Adequacy of solvent cleaning.
· Proper handling of blast media.
· Actual surface preparation procedure.
· Inspect and approve final surface preparation, before application of primer coat.
· Supervise and approve coating system preparation and application procedures, including but not limited to: mixing and thinning, stripe coating application, spray techniques, and film thickness measurements and recordings.
· Determine when applied coats have sufficiently cured for overcoating, or for system service resumption (see paragraph A2.1.18 (Critical drying time requirements)).
· Complete and sign the quality assurance (QA) inspection forms (see QA-1 thru QA-5), provided in Appendix A (Requirements for Preservation of Ship Structures) of this document.
· Submit all completed QA inspection forms to the COR (through the Contractor), upon completion of work.
3.2.4.2.3.2 The Contractor shall ensure the NACE Inspector is formally informed - via suitable subcontract documentation- and is willing and able to perform of all duties listed above. Submit documentation of this contract and assumption of duties to the KO at the Arrival Conference.”
3.5.3 Changes to contents of paragraph 3.2.5 (Planning document).
“3.2.5 Planning document. The Contractor shall generate a legible Planning Document (PD) with the following characteristics:
· Graphical in format (see Fig. 1 (Sample Planning Document Submittal)).
· Shows overall period of performance for each CLIN, with start and stop dates of major sub-tasks.
· Contains due dates for Critical Inspection Reports (CIR) and any events requiring Coast Guard Inspector presence.
· Identifies all work item time periods that require OEM Tech Rep assistance.
· Identifies the “critical paths” for the project.
· Shows calculations for the “float” along the critical paths and labels the critical paths with the number of delay days the critical paths can absorb without affecting the final delivery date.
NOTE
Float is the number of days that the critical paths can be delayed without affecting the final delivery date.
3.2.5.1 Ensure that the PD also includes the names, contact information, and written commitment from all Tech Reps required by the Contract - indicating they are available for work during the proposed time period.
3.2.5.2 Submit a preliminary electronic copy of the PD to the COR - for Government review - no later than one week after contract award.
3.2.5.3 Submit 3 copies of the PD to the COR, 15 days prior to the start of the performance period, and at all weekly Progress Meetings.
NOTE
A separate document, specifically prepared for the Government is not desired or required. A copy or summary of the Contractor’s internal scheduling document is preferred.
FIG. 1 - SAMPLE PLANNING DOCUMENT SUBMITTAL
3.2.5.4 When the critical path extends beyond or encroaches upon the final delivery date, provide a resource constraint and scheduling evaluation of the critical path before any request for extension will be entertained. Submit the resource constraint and scheduling evaluation via a CFR.
NOTE
The intent of the resource constraint and scheduling evaluation is to identify the resources necessary to ‘crash’ the critical path or make adjustments to the production schedule to meet the delivery date in lieu of a project extension.”
3.5.4 Additional sub-paragraphs to paragraph to 3.2.6.5 (Inspection report particulars).
“3.2.6.5.3 CFR tracking system. The Contractor shall create and maintain a CFR tracking system for the project. At a minimum, ensure that the CFR tracking system shall list all required reports, broken down by the following:
· Work item and paragraph number.
· Due dates.
· Submission dates.
· CFR/CIR submission number.
3.2.6.5.3.1 Be aware that the COR will respond via the CFR reply as to whether the CIR/CFR ‘fully’ or ‘partially’ satisfied the inspection and reporting requirements in the associated work item.
3.2.6.5.3.2 When submitting a CFR, ensure that the applicable work item and paragraph number for which the inspection report is being submitted is included on the CFR.
3.2.6.5.3.3 Submit a copy of the CFR tracking sheet to the COR at the arrival conference.
3.2.6.5.3.4 At a minimum the Contractor shall update and submit a copy of the CFR tracking sheet to the COR the day before each weekly progress meeting. At the required CFR due date, submit the CFR tracking sheet to the COR via a CFR for review and formal archiving with the project records.”
3.5.5 Changes to contents of paragraph 3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems).
“3.2.11.1 (Sanitary facilities for vessel-personnel due to disruption of grey water and sewage systems. When the shipboard grey water and sewage systems are disrupted due to repairs required by contract work, the Contractor shall provide vessel-personnel with a sanitary facility, within a five minute walking distance from the vessel, to include the amenities listed in Table II (Sanitary Facility Amenities). Ensure the following:
· Shower stalls are equipped with privacy screens.
· Sinks are provided with fresh hot and cold water.
· Electrical convenience GFI receptacles, in accordance with NFPA 70, National Electric Code (NEC), are located in vicinity of sinks.
· Toilets have doors or privacy dividers.
· Lockers are capable of being locked.”
3.5.6 Changes to contents of paragraph 3.3.2.1.1 (Water depth).
“3.3.2.1.1 Water depth. Ensure that water depth is sufficient at the pier to allow the vessel's lowest underwater appendage to clear the bottom by at least two feet at:
· Ordinary low water mark on non-tidal rivers.
· At all tide conditions predicted during the availability for tidal rivers and other navigable waterways (Bay, Lake, etc.).”
3.5.7 Electrical compliance planning.
“3.3.14 Electrical compliance planning. For cutter availabilities, the Contractor shall submit to the KO the following electrical compliance planning documentation during the pre-award phase of the contract.
3.3.14 1 Shore power. When ungrounded shore power is to be provided per SFLC Std Spec 8635, provide a one line electrical diagram showing how such power will be supplied, including the winding and grounding configuration and rating of any generator or isolation transformer. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.
3.3.14.2 Arc welding. When electric arc welding is to be performed per SFLC Std Spec 0740 while the vessel is waterborne, provide a diagram showing the general proposed location of each welding machine, the grounding configuration of each machine, and the return current conductor size and length. For drydock availabilities, separate diagrams may be necessary for waterborne and non-waterborne periods.
3.3.14.3 Hull bonding and lightning protection. For work periods while the vessel is not waterborne, provide a diagram showing how the hull grounding straps required by SFLC Std Spec 8635 will be sized (length and gauge) and connected.
3.3.14.4 Tool and equipment power. Provide a diagram showing how Contractor tool and equipment power will be supplied and distributed for dockside and shipboard use in accordance with SFLC Std Spec 0450. For drydock availabilities, separate diagrams should be submitted for waterborne and non-waterborne periods.”
3.5.8 Changes to paragraph to A2.1.1.3 (Document submission).
A1.1 “A2.1.1.3 Document submission.
A1.2 A2.1.1.3.1 For all work involving preservation of “critical-coated surfaces”, ensure the following is submitted to the COR at the Arrival Conference, for each coating system intended to be applied:
· Coating system manufacturer’s name.
· Product data sheets.
· MSDS.
· COC.
A1.3 A2.1.1.3.2 Documentation shall be broken out by work item, to also include the following information:
· Brand name.
· Color.
· Intended mil thickness.
· Time between coats.
· Intended final cure time prior to immersion or full duty rating, as applicable.
A1.4 A2.1.1.3.3 For work involving preservation of surfaces not designated as “critical-coated surfaces”, submit all product data sheets, MSDS, and COC to the COR, prior to commencement of work.”
3.5.9 Requirements changes to paragraphs A2.1.5 (Tenting) and A2.1.6 (Ambient condition control).
“A2.1.5 Tenting and ambient condition control – “for critical-coated surfaces”.
A2.1.5.1 When the ambient condition parameters necessary for full paint cure or to meet environmental conditions, as required in paragraph A.2.1.4 (Ambient condition parameters), cannot be met for successful application and curing of “critical-coated” surface coating systems, the Contractor shall provide the following, at no additional cost to the Government:
· Suitable tenting, as applicable, for exterior surface preservation.
· Suitable ambient condition control equipment, which may include, but not be limited to the below-listed, to create and maintain ambient conditions recommended by the coating system’s manufacturer, and facilitate successful coating application and curing.
· AC system.
· Heaters.
· Blowers.
· Dehumidifiers.
A2.1.5.2 Submit an ambient condition control plan to the COR within 24 hours prior to initiating ambient condition control process
NOTE
The Contractor is expected to be aware of the advent of environmental conditions that are adverse to preservation of critical-coated surfaces and include all costs in
3.5.10 Pre-surface preparation requirements – additional to paragraph A2.1.7 (Pre-surface preparation requirements).
“A2.1.7.4 Coupon test. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item:
A2.1.7.4.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Use a new metal plate, of the same metal type and material properties as the area to be blasted, steel or aluminum plate, as applicable. For steel plates, the new plate shall have the mill scale intact and the plate will be in a Rust Grade "A" condition, per the SSPC-VIS 1 visual standard cards. No existing anchor profile, other than the surface irregularities from the manufacturing process are permitted on the test coupon. The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot. The test coupon shall be affixed so as to not permit excessive movement during the performance test.
CAUTION!
Do not affix the coupon to the vessel nor shall the blast media from the performance test strike the vessel during the test
A2.1.7.4.2 Ensure that the abrasive blasting operation test on the test coupon is with the very same setup that will be used to blast the vessel. The setup shall include, but not be limited to:
· The abrasive media to be used (material and media size).
· Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).
· Delivery rate and pressure settings.
A2.1.7.4.3 Blast an one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the applicable work item and perform an anchor profile test of the blasted surface in accordance with ASTM D4417, method A or C. Notify the COR in advance of the abrasive blasting operation test, to permit the witnessing of the test by appropriate Coast Guard personnel. Submit a CFR documenting the results of the abrasive blasting operation test. CFR shall include at a minimum, the following:
· Area of the vessel that the verified setup will be used to abrasive blast with.
· The abrasive media used.
· The nozzle size and type.
· The delivery rate and pressure.
· The test coupon starting properties (material type and surface conditions).
· The resultant anchor profile readings from the test.
NOTES
1. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.
2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph A2.1.7.4 (Coupon test) are met.
A2.1.7.4.3 Repeat the abrasive blasting operation test in the following instances:
· The setup, as defined in paragraph A2.1.7.4.1 is changed.
· The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.
· Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.
· The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.
· When Directed by the COR.
NOTE
A performance test of the abrasive blasting operations on a test coupon and measuring the anchor profile prior to performing the operation on the cutter, in order to confirmed that the anchor profile range that the operation is going to produce. An abrasive blasting operation test is prudent, as there are enough variables in the equipment setup and media properties that the resulting anchor profiles from one contractor to the next vary significantly.
3.5.11 Post-surface preparation requirements - additional to paragraph A2.1.8 (Post-surface preparation requirements).
A2.1.8.8 Substrate profile measurements - during and post-surface preparation. In order to ensure production of required surface profile, the Contractor shall accomplish the following tasks, whenever abrasive-blasting is required in a work item for complete preservation of a ”critical-coated” surface:
A2.1.8.8.1 During surface preparation by abrasive blasting or waterjetting operations, spot check the existing anchor profile per 500-square feet, in order to 'project' the need to manage the excessive anchor inspect for both excessive and insufficient anchor profiles . When the Contractor elects to prepare a substrate by waterjetting, the Contractor shall inspect the substrate for areas of insufficient or excessive anchor profile, both visually and in accordance with ASTM D4417, Method A or C. Submit a CFR detailing the location, square footage, measured anchor profiles, and the anchor profile range required for the applicable coating system.
A2.1.8.8 2 Post completion of surface preparation, measure the profile of the resultant bare surfaces, in accordance with ASTM D4417, Method A or C.”
3.5.12 Caution verbiages – additional to paragraph A2.1.18 (Critical drying and cure time requirements).
“CAUTIONS!
1. Hard cure times or cure time prior to immersion for any “critical coated system” shall be met as published on the Product Data Sheets available online. No early undocking or relaxation of these published requirements is permitted without prior approval from the KO. Coating system manufacturer’s Sales or Technical Representatives may not relax these requirements. Painting and curing of all tank coating systems (except for tanks that are inboard and not touching the skin of the vessel (side and/or bottom) shall occur while the cutter is out of the water.
2. CAPAC systems shall not be energized until full cure of all underwater paint systems has occurred.”
3.5.13 Preservation Plan.
“A2.2 Preservation Plan (PP). The contractor shall submit a PP to the COR at the arrival conference, to allow for review of all work items pertaining to the preservation of the vessel. At a minimum, PP shall include the following and be broken down by work item:
· Coatings to be applied – listed by manufacturer and product identification numbers.
· Target wet and dry film thickness values.
· Authorized reducers/solvents - including maximum percent by volume for reducers/solvents.
· Colors by FED-STD-595 color number.
· Application method for each coat.
· Application pressure and nozzle size requirements listed on the manufacturer’s product data sheet(s).
· Minimum recoat windows for applying subsequent coats, maximum recoat windows to apply subsequent coats, adjusted for anticipated temperatures.
· Any special instructions or environmental limits listed by the coating manufacturer.
· Intended final cure times prior to immersion or full duty rating (as applicable).”
3.5.14 Changes to paragraph B2.2.3.3.1.
“B2.2.3.3.1 Do not release lead or lead-contaminated materials into the environment. Conduct periodic air monitoring (as appropriate) for lead in the worker’s breathing zone, during the course of any abatement work involving lead containing materials, to prevent exposure at or above the PEL. Submit results of all air monitoring samples to the COR, within 24 hours of completion of sampling.”
3.5.15 Booming requirements during the offload or on-load of petroleum products.
“B2.2.10 Booming requirements during the offload or load of petroleum products. The Contractor shall provide a containment boom system and boom off the cutter during all petroleum cargo on-loads and offloads. The cutter shall be boomed off by the contractor during both shipyard functions and the final bunkering of the cutter by ship's force. The contractor is responsible to provide the labor to deploy and recover the boom during all operations, including operations conducted by ship's force. The containment boom shall at a minimum, fullly encapsulate the cutter from the pier wall in front of the cutter to the pier wall at the stern of the cutter. When moored alongside a pier that does not provide a fully intact pier wall that will contain a spill, the containment boom shall wrap completely around the cutter on all sides to provide spill containment. For tug and barge configurations, the containment boom shall encapsulate both the cutter and the barge, as applicable.”
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .