Amendment0004_12RP45P29.pdf
PDF 29 KB Posted
- Attached to
- CGC GASCONADE (WLR 75401) FY13 IRESS DRYDOCKING
- Solicitation number
- HSCG85-12-R-P45P29
About this file
Amendment 0004
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment0003_12RP45P29.pdf | ||
| GASCONADE PCB Lead Asbestos Reports | — | |
| HSCG85-12-R-P45P29 Gasconade Specification Rev 1.doc | DOC document | |
| Amendment0002_12RP45P29.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade Schedule of Supplies | — | |
| Amendment0001_12RP45P29.pdf | ||
| HSCG85-12-R-P45P29 Gasconade Specification.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade Solicitation.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade PP Questionnaire.doc | DOC document | |
| HSCG85-12-R-P45P29 Gasconade Schedule of Supplies.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
1 2
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
0004 17 SEP 12 21-12-852P45P29
6. ISSUED BY CODE HSCG85 7. ADMINISTERED BY (If other than Item 6) CODE
COMMANDER
SURFACE FORCES LOGISTICS CENTER C&P2
1301 CLAY ST. STE 807N
OAKLAND, CA 94612-5217
8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) √ 9.A AMENDMENT OF SOLICITATION NO.
HSCG85-12-R-P45P29
9B. DATE (SEE ITEM 11)
21 AUG 12
10A. MODIFICATION OF CONTRACT/ORDER
NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copy of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
√ A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)
SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority).
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
CGC GASCONADE (WLR 75401) & BARGE (90013) FY13 IRESS DRYDOCKING REPAIRS
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remain unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY
(Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83)
)PREVIOUS EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.2
1. Response(s) to Request(s) for Clarification 0003 is/are provided as Attachment A.
2. There is no change to the proposal closing date, which remains as follows:
20 SEP 12 (1100 Eastern)
A proposal shall consist of the following:
a) Signed & dated SF1449 (2 pages) and any Amendments
b) Completed Provision (26) Pre-Award Drydock Certs & Calcs
c) Completed Provision (33) Place of Performance (1 page)
d) Completed Provision (3) Info Regarding Responsibility Matters
e) Completed Provision (5) Prohibition…Corporate Expatriates
f) Any qualifications to FAR 52.212-3 (otherwise SFLC will consider your ORCA registration current, accurate, complete, and applicable (zero pages if no qualifications). Make sure your registration in SAM.gov is current and accurate.
g) Completed Electronic Spreadsheet Schedule of Supplies (1 page - submit electronically as a spreadsheet)
In addition to the requirements at (22) FAR 52.212-1 INSTRUCTIONS TO OFFERORS, you may email a scanned copy of your proposal to the individual in Block 7.a. at james.s.altice@uscg.mil. Please economize on the size of your emailed submission and please confirm receipt. Early submission of the Pre-Award Drydock Certs and Calcs is encouraged.
3. Shipchecks may be arranged by contacting vessel’s Engineering Petty Officer, MKC Matthew Kennedy, at (402) 657-9215 (ship’s switchboard) or Matthew.W.Kennedy@uscg.mil.
ATTACHMENT A
Date: 9/11/12
Question No. Q003
REQUEST FOR CLARIFICATION
SHIP & HULL No.: CGC GASCONADE (WLR 75401) & BARGE FY12 IRESS DRYDOCKING
RFP No.: HSCG85-12-R-P45P29
SOLICITATION SECTION: PARA NO.
WORK ITEM NO. 37 PARA NO.
TITLE:
QUESTION:
On Work Item 37 Drydocking- Tender,Coast Guard Drawing 75 WAGL 0700- 004, Rev -, coul it be possible to use the boat trailer sheme position 2 as per 75C-WAGL-0700-025 page 2 , for preservation and travellift use?
RESPONSE:
Docking plan 75C-WAGL-0700-25, boat trailer positions 1 and 2 are not acceptable docking positions for CGC GASCONADE for her scheduled FY13 IRESS Drydock.
Due to new keel cooler installation associated with Work Item 45 and shown on CG Drawing 75C- WAGL-1101-3, the block required at frame 44 (or 45) centerline from Boat Trailer Scheme No2 (or No.1) would interfere with completion of this work.
Plating shall be renewed as shown on drawing 75C-WAGL-11-1-3, sheet 2.
File details come from the government source that posted it. Updated .