AttJ.2ElectronicSectionB(12RP45108).xls

XLS spreadsheet 27 KB Posted

Attached to
CGC MARIA BRAY (WLM 562) FY2012 DRYDOCKING AND REPAIRS
Solicitation number
HSCG85-12-R-P45108
Issued by

About this file

Attachment J.2

View the file

Other files

File Type Posted
Amendment0004(12RP45108).pdf PDF
Amendment0003(12RP45108).pdf PDF
Amendment0002(12RP45108).pdf PDF
Amendment0001(12RP45108).pdf PDF
AttJ.1MariaBrayFY12DD_Rprs(12RP45108).pdf PDF
AttJ.3Clarification_Form(12RP45108).doc DOC document
Solicitation(SchedA-M)(12RP45108).doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sect B Definite (D) Optional (O)

Work Item No.Work Item TitlePrice *
D-001Hull Plating (Side Scan), Ultrasonic Testing
D-002Hull Plating, U/W Body, Inspect
D-003Appendages (U/W), Leak Test
D-005DELETED
D-007Tanks (Potable Water), Clean and Inspect
D-009Fathometer Transducer , Renew
D-00BGFP ReportNSP
D-00CTravel and Perdiem
D-010Sea Strainers - Duplex (All Sizes), Overhaul
D-011Sea Bay , Preserve 100%
D-012Thruster Unit (General) , Overhaul
D-013Crossdeck Winches, Overhaul
D-014Mechanical Chain Stoppers , Overhaul
D-015Anchor Windlass , Level 3 Overhaul
D-016Anchor Chain (s) and Ground Tackle, Inspect and Repair
D-017Grey Water Holding Tanks , Clean and Inspect
D-018Sewage Holding Tanks , Clean and Inspect
D-019Grey Water Piping , Clean and Flush
D-020Sewage Piping , Clean and Flush
D-021Chain Locker, Preserve 100%
D-022Tanks (Potable Water), Preserve “ 100% ”
D-023Decks - Exterior( Buoy ), Preserve
D-024U/W Body, Preserve “100%”
D-025Cathodic Protection / Zincs, Renew
D-026Drydocking
D-027Temporary Services, Provide
D-028Propulsion Shaft Bulkhead Seals , Upgrade
D-031Sea Valves and Waster Pieces , Overhaul or Renew
D-032Hydraulic Chain Stoppers, Overhaul
D-033DELETED
D-034DELETED
D-035ASW Piping System, Clean and Inspect (Deleted)
D-040Anchor (s) , Preserve
D-041Tanks (Ballast), Preserve “ 100% ”
D-043Tanks ( Sewage Holding ) , Preserve “ 100% ”
D-044Hull Plating ( Buoy Port Areas ) , Preserve
D-046Buoy Crane, Inspect and Repair
D-048XO's Stateroom, Modify
D-049SW Heat Exchangers , Clean , Inspect and Hydro
D-051Sea Bay, Inspect
D-052Bow Thruster Motor, Clean & Inspect
O-004Appendages (U/W) - Internal, Preserve
O-006DELETED
O-008SW Heat Exchangers , Clean , Inspect and Hydro
O-029Deck Covering ( Electrical Matting ) , Renew
O-030Deck Covering (Interior Wet/Dry) , Renew
O-036Hull and Structural Plating – 10.2-Pound Steel , Repair
O-037Hull and Structural Plating – 12.75 -Pound Steel Plate , Repair
O-038Hull and Structural Plating – 15.3 -Pound Steel Plate , Repair
O-039Hull and Structural Plating – 20.5 -Pound Steel Plate , Repair
O-042Tanks ( Grey Water Holding ) , Preserve “ 100% ”
O-045Temporary Messing and Berthing , Provide
O-047Bilge s (Machinery Space) – Engine Room , Preserve
O-050Bilges (Cargo Hold), Preserve
O-00AComposite Manhour Rate (Section H.2) 1,150 hours X (Rate) _____________=
O-00ZLaydaysLay Day Rate (Section H.3) 5 days X (Rate) ______________=
Total Price
* Offerors shall round to the nearest whole dollar.

&C&F &R&F

File details come from the government source that posted it. Updated .