Invitation for Bids
HSCG85-09-B-625814
Dry-dock & Repairs of USCGC SOCKEYE (WPB 87337)
Section B Rev.1
SECTION B - SUPPLIES AND SERVICES - PRICES
NOTICE TO OFFERORS: Offerors must complete and submit all applicable items of this solicitation, with particular emphasis on Sections A, B, I and K.
Contractor shall provide all labor, materials, facility, and equipment, except as specified, to perform DRY-DOCK AND REPAIRS of USCGC SOCKEYE (WPB 87337), from 12 AUG 2009 through 29 SEP 2009.
All work will be performed at a Contractor provided facility.
B.1
DEFINITE ITEMS:
| D-01 |
| Production Control, GANTT Bar Chart Provide |
| $ |
| D-02 |
| Forepeak Void Watertight Flat Installation |
| $ |
| D-03 |
| Hull Plating, Underwater Body Inspect |
| $ |
| D-04 |
| Hull Plating, Underwater Body Ultrasonic Testing |
| $ |
| D-05 |
| Appendages (Underwater) Leak Test |
| $ |
| D-06 |
| Appendages (Underwater) Preserve, Internal |
| $ |
| D-07 |
| Voids (non-accessible) Leak test |
| $ |
| D-08 |
| Voids (non-accessible) Preserve, Internal |
| $ |
| D-09 |
| Tanks (MP Fuel Service) Clean and Inspect |
| $ |
| D-10 |
| Hatch Coaming Replacement |
| $ |
| D-11 |
| Propulsion Shaft Seals Mechanical Overhaul & Inflatable Renewal |
| $ |
| D-12 |
| Propulsion Shaft Bearings (External) Check Clearances |
| $ |
| D-13 |
| Propeller Clean & Inspect |
| $ |
| D-14 |
| A/C Condenser Seawater Cooling Piping Renewal and Fitting Replacement |
| $ |
| D-15 |
| Fathometer Transducer Renewal |
| $ |
| D-16 |
| Sea Valve (<=2.5 Inches) Renewal |
| $ |
| D-17 |
| Sea Valve (>2.5 Inches) Overhaul |
| $ |
| D-18 |
| Grey Water Piping Clean and Inspect |
| $ |
| D-19 |
| AFFF Engine Room Bilge Flooding Piping Installation |
| $ |
| D-20 |
| Installation of New Hydraulic System |
| $ |
| D-21 |
| Install Rudder Stock Split Seals |
| $ |
| D-22 |
| Rudders and Rudder Stocks Removal and Inspection with El Seal EC |
| $ |
| D-23 |
| Grey Water Holding Tank(s) Clean & Inspect |
| $ |
| D-24 |
| Sewage Holding Tank Clean & Inspect |
| $ |
| D-25 |
| Sewage Piping Cleaning and Inspection |
| $ |
| D-26 |
| Lazerette Preserve |
| $ |
| D-27 |
| Hull Plating, Underwater Body Preserve, Partial |
| $ |
| D-28 |
| Rudders (Exterior) Preserve |
| $ |
| D-29 |
| Cathodic Protection, Zinc Anode Renewal |
| $ |
| D-30 |
| Deck Coverings (Interior Polymeric) Reseal |
| $ |
| D-31 |
| Temporary Services, Drydock Provide |
| $ |
| D-33 |
| Drydocking Accomplish |
| $ |
| TOTAL AMOUNT OF ALL DEFINITE ITEMS |
| $ |
B.2
OPTIONAL ITEMS:
Optional Items will be awarded if inspection reports reveal the necessity for activation. If activation is required, it must be no later than 02 SEP 2009
| O-34 |
| Exhaust Port Hull Plating Repair |
| $ |
| O-35 |
| Appendages (Underwater) Air Test |
| $ |
| O-36 |
| Voids (Underwater) Air Test |
| $ |
| O-37 |
| Vent Ducts Commercial Cleaning |
| $ |
| O-38 |
| Mast(s) Preservation |
| $ |
| O-39 |
| Hull Plating, Underwater Body Preserve (100%) |
| $ |
| O-40 |
| Hull Plating, Freeboards Preserve (Partial) |
| $ |
| TOTAL AMOUNT OF ALL OPTIONAL ITEMS |
| $ |
B.3
BID FOR COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the clause of Section H entitled “COMPOSITE LABOR HOUR RATE FOR CONTRACT CHANGES.”
| LABOR HOUR RATE |
| ESTIMATED QUANTITY |
| ESTIMATED AMOUNT |
| $____________/HOUR |
| 1184 HOURS |
| $_________________ |
**NOTE: The estimated quantity and extended amount indicated above are for evaluation of bids only. The quoted rate will apply to all changes involving additional work under this contract regardless of the actual total hours required.
B.4
LAY DAYS
Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.
PRICE PER DAY:
| X 3 DAYS |
| EXTENDED AMOUNT: |