Technical Exhibits 1-8

View the file

Other files

File Type Posted
SF30_Amend_0002.pdf PDF
REVISED_Q A_FINAL.pdf PDF
Amend_0002_Replacement_Pages.pdf PDF
Amendment_0001_SF30.pdf PDF
Questions_and_Responses_AA9485.pdf PDF
Attachment_3_Past_Performance_Questionaire.pdf PDF
RFP_HSCG84-16-R-AA9485.pdf PDF
Attachment_1_Wage_Determinations.pdf PDF
Attachment_2_CDR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 1

GOVERNMENT FURNISHED PROPERTY/ EQUIPMENT

The below listed material will be provided by the Government for use in overhaul of steel ATON buoys.

Items will be provided at the request of the Contractor, based on the need for these materials in the overhaul of buoys per task order. Items may also be issued to repair buoys that have received heavy damage, and/or lost either their cage or radar reflector. These will be provided on a case-by-case basis by the COR.

The Government will furnish Chapters 2 & 3, Aids to Navigation Manual-Technical, Commandant

Instruction M16500.3.

ITEM DESCRIPTION

APPLICABLE COAST

GUARD DRAWING#

QTY

85 Lb Bell 120994 Each

225 Lb Bell 120994 Each

85 Lb Bell Stand 120998 Each

225 Lb Bell Stand 120998 Each

Gong - 60 Lb 120994 Each

Gong - 70 Lb 120994 Each

Gong – 75 Lb 120994 Each

Gong Stand 120998 Each

Short Standard Tapper 121159 Each

Long Standard Tapper 121159 Each

Large Tapper Ball 120382 Each

Small Tapper Ball 120382 Each

Wiring N/A Each

Gasket, Swing Bolt, 24” 121143 Each

Gasket, Swing Bolt, 22” 121104 Each

2-Ball Vent Valves 107334 Each

22" Pocket Conversion Kit 121162 Each

24" Pocket Conversion Kit 121162 Each

5X11 I LR Pocket Cover/Pedestal 121160 Each

5X11 LR Radar Reflector 121024 Each

7X20 LIR Radar Reflector 120976 Each

7X20 LIR Buy Gasket Kit 121200 Each

6X20 & 7X17 Buoy Tower 121176 Each

8X26 Buoy Tower 121174 Each

8x21 and 9X20 Buoy Tower 121175 Each

Radar Reflector 1CR 121109 Each

Radar Reflector 1NR 121108 Each

Radar Reflector 2 CR 121111 Each

Radar Reflector 2 NR 121110 Each

Radar Reflector 3NR 121112 Each

Radar Reflector 3CR 121113 Each

Radar Reflector 5CR 121164 Each

Buoy Lifting Eye 121140 Each

TECHNICAL EXHIBIT 2

BUOY SHIPPING WEIGHTS

BUOY DESCRIPTON STATUS

DIMENSIONS

(feet)

SHIPPING WEIGHT

(Pounds)

1CR STD 5X19 6,100

1NR STD 5X20 6,000

2CR STD 4X14 2,800

2NR STD 4X15 2,600

3CR STD 3X9 1,200

3CI STD 3X13 1,550

3NI STD 3X14 1,550

3NR STD 3X9 1,175

5CR STD 2X9 710

5CI STD 2X8 700

5NI STD 2X9 700

5X11LCR STD 5X11 3,000

5X11LNR STD 5X11 3,150

6X20 LR STD 6X20 6,500

7X17 LR STD 7X17 7,800

7X20 LI STD 7X20 6,500

8X26 LR STD 8X26 11,800

9x20BR STD 9x20 8,000

* denotes an oversize load

Note: Weights provided are approximate and may vary from buoy to buoy.

TECHNICAL EXHIBIT 3

WELDING

1.0 PROCESS. Shielded Metal-Arc-Welding (SMAW), Gas-Metal-Arc Welding (GMAW) or Flux-

Cored-Arc-Welding (FCAW) shall be used to weld the steel. Gas-Metal-Arc or Gas-Tungsten-Arc welding shall be used to weld any aluminum. The plates, bars, and other shapes forming the various subdivisions and components shall be fitted and faired prior to being welded in place. The gap between parts shall never exceed 3/16 in.

2.0 WELDING FILLER METALS (ELECTRODES). Welding filler metals shall conform to the

American Welding Society (AWS) Filler Metal Specifications. All electrodes for medium steel and medium steel casting shall conform to E60XX or E70XX series electrodes. SMAW filler metal shall conform to AWS Filler Metal Specification A5.1. GMAW filler metal shall conform to AWSW Filler

Metal Specification A5.18 or A5.20. FCAW filler metal shall conform to AWS Filler Metal Specification

A5.20. Corrosion-resisting steels shall be welded with electrodes conforming to AWS Filler Metal

Specification A5.4. For aluminum, the welding filler metals shall meet the requirements of AWS Filler

Metal Specification A5.10 and be compatible with the aluminum alloy being welded.

3.0 WELD QUALITY.

3.1 PREPARATION OF SURFACE. Surfaces and edges to be welded shall be smooth, uniform and free from fins, tears, cracks and other discontinuities which would adversely affect the quality or strength of the weld. Surfaces to be welded and surfaces adjacent to a weld shall also be free from loose scale, slag, rust, moisture, grease and other contaminants. Machining, cutting, chipping or grinding shall be used for joint preparation or the removal of unacceptable work or metal.

3.2 WELD SIZE. Fillet weld size shall be equal to the thickness of the thinner member of the joints.

Reinforcement of groove welds shall not exceed 1/16 in. and no depression in the groove weld finish surface shall be below the surface of the joined members. Welds used to build up the edges of cut pieces for fit shall not be more than 1/4 in. wide.

3.3 WELD DEFECTS. Fillet welds shall be free of harmful defects such as insufficient throat, excessive convexity (excessive reinforcement), excessive undercut (greater than 1/32 inch), insufficient leg, and inadequate penetration. Groove weld contours shall not exhibit excessive convexity, insufficient throat, suck back, excessive undercut or overlap. All welds shall be free of harmful defects such as cracks, porosity, voids, solid inclusion, incomplete fusion or gaps. There shall be no burn through.

Angular or thickness misalignment, warpage or dimensional change due to heat from the welding process shall not exceed 1/4 in. Welds shall not be peened, caulked or slugged.

3.4 TEMPORARY WELDS. Upon removal of clips, brackets, etc., which have been temporarily welded, the welds shall be chipped off and ground flush. All gouges, undercuts, or other scars in the base metal that are more than 1/16 in. in depth shall be filled with weld metal and faired out by grinding.

3.5 WELD APPEARANCE. All welds shall be uniform in size and contour. Fillet welds shall be extended around the ends of members to form closed loops. Weld craters at the ends of increments in intermittent welds and elsewhere shall be filled up to prevent cracking. All welding slag, oxide and spatter shall be completely removed from exterior surface before painting.

4.0 QUALIFICATION OF WELDERS. All welders employed for welding under this specification shall be qualified by the Contractor with procedures which meet the requirements of AWS D1.1 and D1.2

4.1. If at any time during the contract, a welder's work becomes questionable, the COR may require re-qualification of the welder. Any such re-qualification shall be at the expense of the Contractor. The

Contractor shall establish a formal, written training program and shall certify those welders in writing. If the quality of work from these welders is not satisfactory, the COR may require re-qualification of the welder. If re-qualification is necessary a second time, the Contracting Officer may prohibit the Contractor from using that employee to perform welding tasks.

TECHNICAL EXHIBIT 4

COATING SYSTEM FOR BUOYS

1.1 PRIMERS.

1.1.1 SURFACE PREPARATION. Notwithstanding Aids to Navigation – Technical Manual and Coast Guard Protective Coating for Steel Ocean Buoys, Configuration Standard Technical Order, SILC-

CSTO-36-11 31 19 49-01/20140723, the buoy shall be cleaned of all marine growth, corrosion, paint, and mill scale to a near white metal SP-10 as defined by the Steel Structures Painting Council. Prior to painting it must also be free of all contaminants such as oil, grease, water, blasting grit, etc. All exterior surface and all interior surfaces where entrance openings are provided, including the interior of the battery pocket and the complete inside surface of the whistle tube on whistle buoys and other buoys with open counterweight tubes, shall be cleaned. Metal parts of the buoy shall be sandblasted with silica, shot, or grit.

1.1.2 PAINTING. All exterior metal surface and all interior surfaces where entrance openings are provided, including the interior of the battery pocket, shall be painted. Additionally, if the buoy has a whistle type tube running through the buoy body, the entire inside surface of the tube shall be painted.

All painting shall be performed after proper surface preparation of the buoy. All welding, machinery cutting, drilling, severe forming or any other operation which may damage the protective finish shall be performed prior to the application of the finish. Natural rubber, synthetic rubber and all brass or bronze items shall not be painted.

1.1.3 MULTIPURPOSE EPOXY PRIMER.

1.1.3.1 APPROVED TYPE. The following type of high build epoxy is authorized for use:

Paints which meet MILSPEC MIL-P24647 and are obtained from one of the companies on the Qualified

Product List QPL-24647.

1.1.3.2 APPLICATION. High Build Epoxy shall be applied with an airless spray gun to a near white metal blast (SSPC-SP-10) surface that is completely free of weld splatter and dirt. Generally, use of High

Build Epoxy will require 5 hour periods between each coat. The buoy shall be "striped"; that is, a coat of epoxy shall be painted across all sharp edges, corners, welds and difficult to spray areas. After striping, High Build Epoxy shall be applied in contrasting colors in two coats, 5 mil minimum dry film thickness per each coat. To avoid holidays, the epoxy shall be built up by laying the paint out first in one direction followed by a second series of passes 90 degrees to the first. High Build Epoxy shall be applied, thinned and mixed in accordance with the manufacturer's instructions.

1.1.3.3 DRYING. Drying time before re-coating shall be at least 5 hour at 70 degrees F. Lower temperatures shall require a longer drying time as outlined below:

Temperature Minimum Drying Time

60 degrees F 6 hours

Buoys shall not be painted when the buoy metal surface or air temperature is below 60 degrees.

1.2 TOP COATINGS.

1.2.1 APPROVED TYPE. The following type of aliphatic urethane gloss enamel is authorized for use:

Paints which meet MILSPEC MIL-P-24647 and are obtained from one of the companies on the Qualified

Products List QPL-24647.

1.2.2 SURFACE PREPARATION. The surface of the buoy shall be clean of all foreign matter such as sand, blasting material, oil, water, and other contaminates. The epoxy primer shall be cured so that it is hard enough to resist denting yet still soft enough to leave a thumb print. If the epoxy hardens completely, then a mist coat of epoxy shall be applied and allowed to partially cure before applying the top coat. Cured epoxy exposed to the sun becomes resistant to new paint and shall be sand swept (with light air pressure) to create roughness before applying an epoxy tack coating followed by top coating.

1.2.3 ALIPHATIC URETHANE GLOSS ENAMEL COLOR COAT. These coats give the buoy its characteristic visual signal. The color system used shall be specified in the work request. The color system uses solids of red, green or yellow; horizontal bands of red and green; horizontal bands of red and black; or vertical stripes of red and white. Buoys shall be painted above the waterline (minimum freeboard) for seven types of marks. These are:

STARBOARD BUOYS - Solid red color on all steel and aluminum surfaces above the waterline.

PORT BUOYS - Solid green color on all steel and aluminum surfaces above the waterline.

SPECIAL PURPOSE BUOYS - Solid yellow on all steel and aluminum surfaces above the waterline.

PREFERRED CHANNEL BUOYS – Buoy shall be painted in the preferred channel color scheme.

The buoy shall be painted with three horizontal stripes above the waterline. The stripes will be red/green/red or green/red/green. All lighted buoys with radar towers shall have thetop radar panels painted in the primary color, the bottom radar panels and tower legs painted in the secondary color, and the buoy top head to the waterline painted in the primary color. For unlighted buoys, the radar reflector shall be painted in the primary color. The top head to the waterline shall be split in half with the upper half being painted with the secondary color and the lower half being painted with the primary color.

ISOLATED DANGER BUOYS - Buoy shall be painted in the isolated danger scheme. The buoy shall be painted with three horizontal stripes above the waterline. The stripes will be black/red/black.

All lighted buoys with radar towers shall have the top radar panels painted in the primary color, the bottom radar panels and tower legs painted in the secondary color, and the buoy top head to the waterline painted in the primary color. Unlighted can and nun buoys are not used as isolated danger buoys.

SAFE WATER BUOYS - Vertically striped buoys in red and white on all steel and aluminum surfaces above the waterline. Lighted buoys with four-sided towers shall be divided into eight equal vertical segments that alternate red and white. The segments shall be arranged to bisect the 90 degree angle of the radar reflector. Unlighted can and nun buoys are not used as safe water buoys.

MOORING BUOYS – Solid White color on all steel surfaces above the waterline. “Narrow” Blue band painted horizontally around buoy midway between the buoy top and the waterline. Usually

2nd Class unlighted buoy hulls are used for mooring buoys.

1.2.3.1 APPLICATION. Aliphatic urethane gloss enamel color coats shall be applied by spraying, using clean equipment which will not contaminate the paint. The color coats shall be applied, thinned and mixed in accordance with the manufacturer's instructions. One coat shall be applied above the waterline,

2.0 to 3.0 mils dry film thickness. This coat gives the buoy its characteristic visual signal. Color used shall be as specified in the work request. This coat shall consist of a vertical and a horizontal pass over the surface being coated.

1.2.3.2 DRYING. Drying time for the final coat shall be at least 24 hours at temperatures above 77 degrees F.

1.3 ABLATIVE ANTI-FOULING COAT.

1.3.1 APPROVED TYPE. The following type of ablative anti-fouling is authorized for use:

Paints which meet MILSPEC MIL-P-24647 and are obtained from one of the companies on the Qualified

Product List QPL-24647.

1.3.2 APPLICATION. Ablative anti-fouling paint shall be applied by spraying, using clean equipment which will not contaminate the primer. The anti-fouling shall be applied, thinned and mixed in accordance with the manufacturer's instructions. At least two coats shall be applied below the waterline

(minimum freeboard), 4.0 to 6.0 mils dry film thickness each, to give a dry film thickness of 8.0 to 12.0 mils using contrasting colors for each coat. Each coat shall consist of a vertical and a horizontal pass over the surface being coated. Film thickness control is critical. Service life is a direct function of film thickness.

1.3.3 DRYING. Drying time before re-coating shall be at least 4 hours at temperatures above 77 degrees

F. Drying time for the final coat shall be at least 5 hours at temperatures above 77 degrees F.

1.3.4 THINNING. Do not thin the ablative anti-fouling paint. Film thickness control is critical to the performance life of this coating.

TECHNICAL EXHIBIT 5

HISTORICAL WORKLOAD DATA

The following historical data is provided of information only. The Government does not certify that the amount of work specified below will be equal to the amount the Contractor will be required to perform under this contract. The following information and data is provided as work accomplished from 2012 through 2015 and should be used to assist the Contractor in preparing an order.

Number of Buoys That Received Overhaul Services

TASK 2012 2013 2014 2015

1CR & 1NR 3 0 0 0

2CR & 2NR 3 0 0 0

3CR & 3NR 1 0 0 10

3CI & 3NI 14 66 39 9

5CI & 5NI 20 0 0 0

5X11LR 22 20 15 5

6X20LR 27 13 13 12

7X17LR 1 0 0 1

7X20LR 6 0 3 0

8X26LWR 0 0 0 0

8X26LR & 8X21LR 5 5 1 3

9X20GR/BR 0 0 0 0

Transportation History

The numbers below show how many buoys have been shipped to each location. At this time, the Government does not have historical data to document how many “truckloads” were used throughout 2012-2015.

TASK 2012 2013 2014 2015

To/From Milwaukee, WI 0 0 1 0

To/From Sturgeon Bay, WI 13 0 0 0

To/From Essexville, MI 7 0 0 0

To/From Sault Ste Marie, MI 0 0 27 10

To/From Detroit, MI 26 34 11 24

To/From Cheboygan, MI 35 35 32 16

To/From Port Huron, MI 1 0 0 0

To /From Buffalo, NY 0 0 0 0

To/From Duluth, MN 20 11 0 0

TECHNICAL EXHIBIT 6

WRITTEN REPORTS AND DELIVERABLES

The Contractor shall submit the following reports and plans which may be in addition to reports and plans required by contract clauses:

Name/Description Frequency Submit To Paragraph #

Name of Project Manger With Proposal, then as changes occur

KO C-2.2.1

List of Employees Performing Work Under

Contract

With Proposal, then as changes occur KO C-2.2.1(d)

Copy of Certifications for Welders and

Weld Inspectors

With Proposal, then as changes occur

KO C-2.2 & TE-3

Quality Control Program (QCP) 10 calendar days after award

KO C-2.3

Volatile Organic Compounds Compliance

Plan

10 calendar days after award

COR C-2.5.2

Hazard Material/Waste Handling

Compliance Program

10 calendar days after award

COR C-2.5.3

Environmental Management Plan 10 calendar days after award

COR C-2.5.4

Condition Found Report (CFR) As required COR C-5.2.5

Quantity of GFP/GFE Quarterly COR C-5.2.8(c)

*KO – Contracting Officer

*COR - Contracting Officer’s Representative

TECHNICAL EXHIBIT 7

SAMPLE FORMS

Form Number Description When Required/Used For Submit To

DD-1149

Requisition &

Invoice/Shipping

Document

Anytime a Buoy/GFP is picked up & delivered

COR

OF 347 Task Order Order issued by the Contracting

Officer for Supplies/Services N/A

*A copy of these forms are provided below

DD-1149

TECHNICAL EXHIBIT 8

SAFE LOADING CONFIGURATIONS & NUMBER OF BUOYS PER TRUCKLOAD

Packaging. The buoys shall be shipped fully assembled. The ends of the vent tubes shall be capped to protect them from damage and to prevent water from entering the battery pockets. On buoys outfitted with bells or gongs the tapper arms shall be secured to the tower to prevent them from being damaged in shipment. The buoys shall be properly supported and protected from abrasive wear to prevent damage to the buoy, including the paint, during shipment. The lighted buoy towers and the counterweights shall be supported to prevent vibration during shipment. The counterweight shall be supported so that the buoy ships flat (horizontal) on the flat bed. Chocks shall be used to support the opposite end of the buoy body.

Truckload is defined as a 48 foot flatbed truck.

Following hulls require an oversize load permit (over 8’ but less than 10’ in width): 9x20

Item Shipment*

9x20BR Bell Buoy** 2

9x20GR Gong Buoy** 2

8x26LR Buoy 2

8x26LR (w/o battery pockets) 2

8x26LWR Buoy 2

7x20LIR Buoy 3

7x17LR Buoy 3

7x17LR (w/o battery pockets) 3

6x20LR Buoy 3

6x20LR (w/o battery pockets) 3

5x11LNR Buoy 4

5x11LCR Buoy 4

1NR Buoy 3

1CR Buoy 3

2NR Buoy 4

2CR Buoy 4

3NR Buoy 8

3CR Buoy 8

5CR Buoy 12

3NI Buoy 12

3CI Buoy 12

5NI Buoy 12

5CI Buoy 12

9x20/8x21LR Tower 12

8x26LR/LWR Tower 12

7x17/6x20LR Tower 32

* Indicates the quantity of buoys that can be transported on 1 truck.

**Indicates buoys that require a wide load certification.