Blank_Schedule_B_for_THETIS_(WMEC_270B)_DDL_FY17.xls
XLS spreadsheet 39 KB Posted
- Attached to
- CGC THETIS Dry Dock
- Solicitation number
- HSCG80-17-Q-P45025
About this file
Updated Blank Schedule B to reflect Work Item 62 as a Definite item.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_00003.pdf | ||
| AMENDMENT_00002.pdf | ||
| CGC_THETIS_DRY_DOCK_SPECIFICATION.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| AMENDMENT_00001.pdf | ||
| HSCG80-17-Q-P45025.pdf | ||
| Blank_Schedule_B_for_THETIS_(WMEC_270B)_DDL_FY17.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CGC THETIS DDL FY17
| SCHEDULE B FOR | |||||
| USCGC THETIS (WMEC-270B) DRYDOCK LARGE AVAILABILITY FY2017 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-002 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | |
| D-003 | Propulsion Shaft Fairwaters and Rope Guards, Inspect | JOB | 1 | $0.00 | |
| D-004 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | |
| D-005 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | |
| D-006 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-007 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | $0.00 | |
| D-008 | [Work Item Deleted] | JOB | 0 | $0.00 | |
| D-009 | [Work Item Deleted] | JOB | 0 | $0.00 | |
| D-010 | Propulsion Shaft Seal (Mechanical and Inflatable) Assemblies, Inspect and Repair or Renew | JOB | 1 | $0.00 | |
| D-011 | Propulsion Shafting, Optical or Laser Alignment Check | JOB | 1 | $0.00 | |
| D-012 | Propulsion Shaft Bearings (External) Renew | JOB | 1 | $0.00 | |
| D-013 | Propulsion Shaft Bearing Housing (External) Inspect | JOB | 1 | $0.00 | |
| D-014 | Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service | JOB | 1 | $0.00 | |
| D-015 | Controllable Pitch Propeller (CPP) Hub Assembly, Renew | JOB | 1 | $0.00 | |
| D-016 | Fathometer Transducers Renew | JOB | 1 | $0.00 | |
| D-017 | Doppler Speed Log Transducers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-018 | Sea Valves and Waster Pieces Overhaul/Renew | JOB | 1 | $0.00 | |
| D-019 | Sea Strainers (Duplex, All Sizes) Overhaul | JOB | 1 | $0.00 | |
| D-020 | Sea Strainers (Simplex, All Sizes) Clean & Inspect | JOB | 1 | $0.00 | |
| D-021 | [Work Item Deleted] | JOB | 0 | $0.00 | |
| D-022 | Rudder Stock Bearings, Check Clearances | JOB | 1 | $0.00 | |
| D-023 | Rudder Assembly; Remove, Inspect and Reinstall | JOB | 1 | $0.00 | |
| D-024 | [Work Item Deleted] | JOB | 1 | $0.00 | |
| D-025 | Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or Renew | JOB | 1 | $0.00 | |
| D-026 | U/W Body Preserve 100% | JOB | 1 | $0.00 | |
| D-027 | Hull Plating Freeboard Preserve Partial | JOB | 1 | $0.00 | |
| D-028 | Superstructure, Preserve "Partial" | JOB | 1 | $0.00 | |
| D-029 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| D-030 | Drydock | JOB | 1 | $0.00 | |
| D-031 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-032 | Shaft Seal Vent, Install (TCTO_TA4020_25612) | JOB | 1 | $0.00 | |
| D-033 | Forward Vestibule, Miscellaneous Repairs (CSMP 20150019) | JOB | 1 | $0.00 | |
| D-034 | Piping, Fuel Oil (F/O) Goose Neck Vent, Renew (CSMP 20150031) | JOB | 1 | $0.00 | |
| D-035 | Tanks (MP Fuel Storage), Clean (CSMP 20150031) | JOB | 1 | $0.00 | |
| D-036 | Deck Drain Piping, Renew (CSMP 20160003) | JOB | 1 | $0.00 | |
| D-037 | Tanks (Ballast), Preserve “100%” (CSMP 20160011) | JOB | 1 | $0.00 | |
| D-038 | Tanks (Fuel), Preserve “100%” (CSMP 20160011) | JOB | 1 | $0.00 | |
| D-039 | BEB Pipe Bracket and Doubler Plate, Renew (CSMP 20160058) | JOB | 1 | $0.00 | |
| D-040 | Bilge; JP-5 Pump Room, Preserve (CSMP 20160061) | JOB | 1 | $0.00 | |
| D-041 | Bilge; Aux #2 Machinery Space, Preserve (CSMP 20160069) | JOB | 1 | $0.00 | |
| D-042 | Piping, Auxiliary Seawater System; Renew (CSMP 20160070) | JOB | 1 | $0.00 | |
| D-043 | Piping; Fuel Oil (F/O) Vent, Renew (CSMP 20160072) | JOB | 1 | $0.00 | |
| D-044 | Deck Plating; Aux #1 Space, Renew (CSMP 20160074) | JOB | 1 | $0.00 | |
| D-045 | Auxiliary Sea Water System Valves, Overhaul Or Renew (CSMP 20160075) | JOB | 1 | $0.00 | |
| D-046 | Propulsion Intermediate Shaft; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-047 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | |
| D-048 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | $0.00 | |
| D-049 | Piping Insulation, Renew (CSMP 20160080) | JOB | 1 | $0.00 | |
| D-050 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-051 | Propulsion Stern Tube Bearings, Renew | JOB | 1 | $0.00 | |
| D-052 | [Work Item Deleted] | JOB | 1 | $0.00 | |
| D-053 | Hullboard Insulation; JP-5 Pump Room, Renew (CSMP 20160061) | JOB | 1 | $0.00 | |
| D-054 | Watertight Door; Quick-Acting, Renew (CSMP 2015019) | JOB | 1 | $0.00 | |
| D-055 | One-Step Deck Covering, Renew (CSMP 2015019) | JOB | 1 | $0.00 | |
| O-056 | Propulsion Propeller Shaft Coating, Inspect and Test | JOB | 1 | $0.00 | |
| O-057 | Propulsion Propeller Shaft, Renew | JOB | 1 | $0.00 | |
| O-058 | Propulsion Intermediate Shafts, Renew | JOB | 1 | $0.00 | |
| O-059 | Propulsion Shaft Coating, Renew | JOB | 1 | $0.00 | |
| O-060 | Propulsion Shafting, Straighten | JOB | 1 | $0.00 | |
| O-061 | Propulsion Shaft Sleeve(s), Renew | JOB | 1 | $0.00 | |
| D-062 | Transverse Bulkhead 47, Repair | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | |||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 0 | ||
| Total Price of Definite and Optional Items | $0.00 |
&C(6/20/2016) Rev-1 - Page &P of &N
File details come from the government source that posted it. Updated .