CGC_THETIS_DRY_DOCK_SPECIFICATION.pdf
PDF 3 MB Posted
- Attached to
- CGC THETIS Dry Dock
- Solicitation number
- HSCG80-17-Q-P45025
About this file
CGC THETIS DRY DOCK SPECIFICATION
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_00003.pdf | ||
| Blank_Schedule_B_for_THETIS_(WMEC_270B)_DDL_FY17.xls | XLS spreadsheet | |
| AMENDMENT_00002.pdf | ||
| Past_Performance_Questionnaire.pdf | ||
| AMENDMENT_00001.pdf | ||
| HSCG80-17-Q-P45025.pdf | ||
| Blank_Schedule_B_for_THETIS_(WMEC_270B)_DDL_FY17.xls | XLS spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC THETIS (WMEC 910)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2017
Developed By: LTJG Joseph W Durfey
(Rev-1, 20 October 2016)
USCGC THETIS (WMEC-270B) DRYDOCK AVAILABILITY FY2017
ii (Rev-1)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property ................................................................................. xi Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics .............................................................................................................................. xv General Requirements WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing WORK ITEM 2: Appendages (U/W), Leak Test WORK ITEM 3: Propulsion Shaft Fairwaters and Rope Guards, Inspect WORK ITEM 4: Appendages (U/W) - Internal, Preserve WORK ITEM 5: Voids (Non-Accessible), Leak Test WORK ITEM 6: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 7: Propulsion Shafting, Strain Gage Alignment, Inspect WORK ITEM 8: Work Item Deleted WORK ITEM 9: Work Item Deleted WORK ITEM 10: Propulsion Shaft Seal (Mechanical and Inflatable) Assemblies, Inspect and Repair or
Renew WORK ITEM 11: Propulsion Shafting, Optical Or Laser Alignment Check WORK ITEM 12: Propulsion Shaft Bearings (External), Renew WORK ITEM 13: Propulsion Shaft Bearing Housings (External), Inspect WORK ITEM 14: Controllable Pitch Propeller (CPP) Oil Distribution (OD) Box, Inspect and Service ... 46 WORK ITEM 15: Controllable Pitch Propeller Hub Assembly, Renew WORK ITEM 16: Fathometer Transducer, Renew WORK ITEM 17: Doppler Speed Log Transducer, Clean and Inspect WORK ITEM 18: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 19: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 20: Sea Strainers - Simplex (All Sizes), Clean and Inspect WORK ITEM 21: Work Item Deleted WORK ITEM 22: Rudder Stock Bearings, Check Clearances WORK ITEM 23: Rudder Assembly; Remove, Inspect and Reinstall WORK ITEM 24: Work Item Deleted WORK ITEM 25: Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or Renew WORK ITEM 26: U/W Body, Preserve (100%) WORK ITEM 27: Hull Plating Freeboard, Preserve – Partial WORK ITEM 28: Superstructure, Preserve “Partial” WORK ITEM 29: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 30: Drydock WORK ITEM 31: Temporary Services, Provide - Cutter WORK ITEM 32: Shaft Seal Vent, Install (TCTO_TA4020_25612) WORK ITEM 33: Forward Vestibule, Miscellaneous Repairs (CSMP 2015019) WORK ITEM 34: Piping, Fuel Oil (F/O) Goose Neck Vent, Renew (CSMP 20150031) WORK ITEM 35: Tanks (MP Fuel Storage), Clean (CSMP 20150031) WORK ITEM 36: Deck Drain Piping, Renew (CSMP 20160003) WORK ITEM 37: Tanks (Ballast), Preserve “100%” (CSMP 20160011) WORK ITEM 38: Tanks (Fuel), Preserve “100%” (CSMP 20160011) WORK ITEM 39: BEB Pipe Bracket and Doubler Plate, Renew (CSMP 20160058) WORK ITEM 40: Bilge; JP-5 Pump Room, Preserve (CSMP 20160061) WORK ITEM 41: Bilge; Aux #2 Machinery Space, Preserve (CSMP 20160069) iii (Rev-1)
WORK ITEM 42: Piping, Auxiliary Seawater System; Renew (CSMP 20160070) WORK ITEM 43: Piping; Fuel Oil (F/O) Vent, Renew (CSMP 20160072) WORK ITEM 44: Deck Plating; Aux #1 Space, Renew (CSMP 20160074) WORK ITEM 45: Auxiliary Sea Water System Valves, Overhaul Or Renew (CSMP 20160075) WORK ITEM 46: Propulsion Intermediate Shaft; Remove, Inspect, and Reinstall WORK ITEM 47: Stern Tube Interior Surfaces, Preserve 100% WORK ITEM 48: Tanks (Potable Water), Preserve “100%” WORK ITEM 49: Piping Insulation, Renew (CSMP 20160080) WORK ITEM 50: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 51: Propulsion Stern Tube Bearings, Renew WORK ITEM 52: Work Item Deleted WORK ITEM 53: Hullboard Insulation; JP-5 Pump Room, Renew (CSMP 20160061) WORK ITEM 54: Watertight Door; Quick-Acting, Renew (CSMP 2015019) WORK ITEM 55: One-Step Deck Covering, Renew (CSMP 2015019) WORK ITEM 56: Propulsion Propeller Shaft Coating, Inspect and Test WORK ITEM 57: Propulsion Propeller Shafts, Renew WORK ITEM 58: Propulsion Intermediate Shafts, Renew WORK ITEM 59: Propulsion Shaft Coating, Renew WORK ITEM 60: Propulsion Shafting, Straighten WORK ITEM 61: Propeller Shaft Sleeve(s), Renew iv (Rev-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
20OCT16 1 24 Work Item Deleted (work covered in WI-23)
20OCT16 1 52 Work Item Deleted (work covered in WI-15)
20OCT16 1 56 (Optional) Work Item Added
20OCT16 1 57 (Optional) Work Item Added
20OCT16 1 58 (Optional) Work Item Added
20OCT16 1 59 (Optional) Work Item Added
20OCT16 1 60 (Optional) Work Item Added
20OCT16 1 61 (Optional) Work Item Added
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Rev-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::
www.gpoaccess.gov
The Government is aware of the following internet web links where contractors may procure commercial specifications:
American Welding Society (AWS): http://www.awspubs.com/index.php
ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
NFPA: http://www.nfpa.org
SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 562-004, Rev E, A & B Class Rudder Assembly
Coast Guard Drawing 901 WMEC 562-005, Rev F, A & B Class Rudder Stock And Steering Gear A & D
Coast Guard Drawing 901 WMEC 562-005, Rev G, A & B Class Rudder Stock And Steering Gear A &
D
Coast Guard Drawing 901 WMEC 565-005, Rev -, Fin Stabilizer Hydraulic System Diagram
Coast Guard Drawing 901 WMEC 565-031, Rev C, Shaft Assembly, w/ Sleeve Fitted NSN 3040-01-104-
Coast Guard Drawing 901 WMEC 801-009, Rev H, Outboard Profile
Coast Guard Drawing 905 WMEC 114-003, Rev B, Shaft Fairwaters & Rope Guards
Coast Guard Drawing 905 WMEC 111-001, Rev D, Shell Expansion Fwd 101
Coast Guard Drawing 905 WMEC 111-002, Rev E, Shell Exp Aft 182
Coast Guard Drawing 905 WMEC 111-003, Rev E, Shell Exp FR 101-182
Coast Guard Drawing 905 WMEC 113-001, Rev C, Tank Top PL & FR Fwd FR 101
Coast Guard Drawing 905 WMEC 114-001, Rev D, Skeg
Coast Guard Drawing 905 WMEC 114-002, Rev C, Bilge Keels
Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets
Coast Guard Drawing 905 WMEC 114-004, Rev A, Spray Rail Arrgt & Dets.
Coast Guard Drawing 905 WMEC 116-001, Rev C, CVK Fwd 101 & Girder Long 2
Coast Guard Drawing 905 WMEC 122-002, Rev B, Transv Bhds 47, 78 & 82
Coast Guard Drawing 905 WMEC 167-001, Rev L, List of Structural Closures http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace vi (Rev-1)
Coast Guard Drawing 905 WMEC 184-010, Rev E, Transducer Foundations & Shell Mods
Coast Guard Drawing 905 WMEC 185-009, Rev- C, JP-5 Pump Room Foundation
Coast Guard Drawing 905 WMEC 185-014, Rev D, Aux Machinery Space #1 Foundations
Coast Guard Drawing 905 WMEC 185-015, Rev- F, Auxiliary Machinery Space #2 Foundation
Coast Guard Drawing 905 WMEC 243-001, Rev B, Shafting Arrangement
Coast Guard Drawing 905 WMEC 243-002, Rev E, Stern Tubes Strut Brg and Seal Arr and Det
Coast Guard Drawing 905 WMEC 243-003, Rev-, Shaft Removal Arrangement
Coast Guard Drawing 905 WMEC 243-006, Rev B, Shaft Seal Assembly and Details
Coast Guard Drawing 905 WMEC 243-007, Rev A, CPP Shaft Coupling Assemblies
Coast Guard Drawing 905 WMEC 243-008, Rev B, Shaft & Rudder Removal Pad eye A & D
Coast Guard Drawing 905 WMEC 243-012, Rev A, Controllable Pitch Propellar Shaft Details
Coast Guard Drawing 905 WMEC 245-003, Rev C, Propeller Hub Assembly
Coast Guard Drawing 905 WMEC 245-007, Rev C, Special Tools
Coast Guard Drawing 905 WMEC 256-001, Rev U, Main and Auxiliary Water Cooling Diagrams
Coast Guard Drawing 905 WMEC 256-001, Rev V, & Auxiliary Salt Water Cooling System Diagrams
Coast Guard Drawing 905 WMEC 256-001, Rev- V, Main and Auxiliary Salt Water Cooling System
Diagram
Coast Guard Drawing 905 WMEC 256-001, Rev V, Main and Auxiliary Water Cooling Diagrams
Coast Guard Drawing 905 WMEC 256-001, Rev. V, Main & Auxiliary Salt Water Cooling System
Diagram
Coast Guard Drawing 905 WMEC 256-001, Rev. V, Main & Auxiliary Salt Water Cooling System
Diagram
Coast Guard Drawing 905 WMEC 256-002, Rev J, Eng Rm Sw Cooling Sys A & D
Coast Guard Drawing 905 WMEC 256-004, Rev D, AMS SW Cooling Sys A & D
Coast Guard Drawing 905 WMEC 256-004, Rev- E, AMS Saltwater Cooling System Arrangement and
Details
Coast Guard Drawing 905 WMEC 256-004, Rev E, AMS SW Cooling Sys A & D
Coast Guard Drawing 905 WMEC 256-004, Rev. E, AMS SW Cooling System Arrangement & Details
Coast Guard Drawing 905 WMEC 259-002, Rev C, Diesel Exhaust System Arrangement and Details
Coast Guard Drawing 905 WMEC 259-002, Rev C, DSL Exh Sys A & D
Coast Guard Drawing 905 WMEC 261-002, Rev F, Fuel Oil System Arrangement and Details
Coast Guard Drawing 905 WMEC 321-005, Rev C, Wireways – 01 Level
Coast Guard Drawing 905 WMEC 426-002, Rev H, Doppler Speed Log Block & Isometric Wiring
Diagram
Coast Guard Drawing 905 WMEC 501-001, Rev E, Aux Machinery Space #1 Arrangement
Coast Guard Drawing 905 WMEC 506-001, Rev H, Overflow, Escape, and Sounding Tube Diagram
Coast Guard Drawing 905 WMEC 506-002, Rev G, Overflow, Air Escape & Sounding Tube
Arrangement and Detail FWD FR 103
Coast Guard Drawing 905 WMEC 508-001, Rev C, Pipe and Machinery Schedule
Coast Guard Drawing 905 WMEC 514-020, Rev E, CHW and HW System Diagram
Coast Guard Drawing 905 WMEC 514-022, Rev B, CHW and HW System Machinery Spaces
Arrangement and Details vii (Rev-1)
Coast Guard Drawing 905 WMEC 514-024, Rev B, CHW and HW System 01 Level and Above –
Arrangement and Details
Coast Guard Drawing 905 WMEC 516-001, Rev A, CHW and HW Expansion Tanks Arrangement and
Details
Coast Guard Drawing 905 WMEC 516-002, Rev B, Air Condition Cooling Coil Drains Arrangement and
Details
Coast Guard Drawing 905 WMEC 516-019, Rev B, Mods Incidental to the Carrier A/C Plant Installation
Bill of Materials
Coast Guard Drawing 905 WMEC 528-003, Rev - D, Galley Drain/Grease Interceptor – Arrangement and
Details
Coast Guard Drawing 905 WMEC 529-001, Rev J, Ballasting & Emer Bilge Drainage Sys Diagram
Coast Guard Drawing 905 WMEC 529-003, Rev E, Ballast and Emergency Drain Outside Machinery
Space Arrangement and Details
Coast Guard Drawing 905 WMEC 533-005, Rev B, H&C Potable Water System Mn Dk – A & D
Coast Guard Drawing 905 WMEC 533-006, Rev A, H&C Potable Water System, 01 Lvl & Abv A&D
Coast Guard Drawing 905 WMEC 533-007, Rev A, H & C Potable Water Blw Mn Dk -OMS
Coast Guard Drawing 905 WMEC 541-001, Rev - G, F/O Fill and Transfer System Diagram
Coast Guard Drawing 905 WMEC 562-001, Rev G, Rudder
Coast Guard Drawing 905 WMEC 593-003, Rev D, Sewage Transfer System Diagram
Coast Guard Drawing 905 WMEC 593-005, Rev - G, Sewage XFR System Diagram
Coast Guard Drawing 905 WMEC 622-101, Rev D, Floor Plates A&D
Coast Guard Drawing 905 WMEC 635-001, Rev F, Hull Thermal & Acoustic Insulation A&D
Coast Guard Drawing 905 WMEC 801-004, Rev E, General Arrangement – 01 Level
Coast Guard Drawing 905 WMEC 801-009, Rev G, Outboard Profile
Coast Guard Drawing 905 WMEC 801-009, Rev J, Outboard Profile
Coast Guard Drawing 905 WMEC 801-022, Rev H, Docking Plan
Coast Guard Drawing 905 WMEC 801-040, Rev F, Docking Plan
Coast Guard Drawing 905-WMEC 233-5, Rev A, Prop Diesel Fuel Oil Sys Diag
Coast Guard Drawing FL 6713-203, Rev -, CRP-V850 Transducer (SS505) Adapter Assembly
Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem
Coast Guard Fleet Drawing FL 2804-22, Rev-, Consolidated Visual ID for Cutters
NAVSEA Drawing 803-1385866, Rev E, Penetration, Bulkhead and Deck
NAVSEA Drawing 803-1385866, Rev E, Penetrations, Bulkhead and Deck
NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Commandant Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec
6310), 2014, Requirements for Preservation of Ship Structures
Coast Guard Technical Publication (TP) 2718, Sep 2011, Steering Gear System, 270’ WMEC “A” Class
Cutters viii (Rev-1)
Coast Guard Technical Publication (TP) 2816, Mar 1986, Manufacturer’s Instruction Book-SWBS
Group(s) 242-244, SWBS 243, Section B, Stern Tube Seal, Mechanical
Coast Guard Technical Publication (TP) 2817, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 245, Section A, Controllable Pitch Propeller System
Coast Guard Technical Publication (TP) 2817, Dec 2014, Manufacturer’s Instruction Book - SWBS
Group(s) 242-244, 270’ WMEC “B” Class Cutters, SWBS 245, Section A, Technical Manual for the
Controllable-Pitch Propeller
Coast Guard Technical Publication (TP) 2817, Jul 2007, Manufacturer’s Instruction Book - SWBS
Group(s) 242-244, 270’ WMEC “B” Class Cutters, SWBS 245, Section A, Technical Manual for the
Controllable-Pitch Propeller
Coast Guard Technical Publication (TP) 2835, Sep 2011, Manufacturer’s Instruction Book - SWBS
Group(s) 561-562, 270’ WMEC “B” Class Cutters
Coast Guard Technical Publication (TP) 4656, SWBS 426, Aug 2007, Dual Axis Doppler Sonar Speed
Log, MK II - Model DSN-450
Coast Guard Technical Publication (TP) 5454, Nov 2013, Technical Manual for Type MA Mechanical
Stern Tube Seal
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General
Requirements
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Inspect, Repair, and Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets ix (Rev-1)
ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component
Adhesives (An)
ASTM International (ASTM) F683, 2003, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery
ASTM International (ASTM) F683, 2010, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum
Commercial Item Descriptions (CID) A-A-59316, Nov 2003 Abrasive Materials for Blasting
Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert
Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS), SP-58, 2009, Pipe
Hangers and Supports – Materials, Design, Manufacture, Selection, Application and Installation
MIL PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut Back, Cold Application
MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-DTL-2845, Rev E, Aug 1999, Propulsion Systems, Boat and Ship; Main Shafting, Propellers, Bearings, Gauges, Special Tools, and Associated Repair Parts; Preservation, Packaging, Packing and
Storage of
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cutback, Cold-Application
MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application
MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold Application
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-PRF-24647, Apr 2013, Paint System, Anticorrosive and Antifouling, Ship Hull
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
MIL-STD-1687, Sep 1994, Thermal Spray Process for Naval Ship Machinery Application
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2011, Chapter 16, Cofferdams
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
ODOM Echotrac DF3200 MKII, Rev 2, Technical Manual
Raytheon V850 Color Echosounder, 2nd Edition, Mar 1993, Operation Manual x (Rev-1)
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification SSPC-SP 11, 2012, Power
Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Metal Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by
Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-2/NACE WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough
Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of
Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating xi (Rev-1)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
8 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 228,600.00
10 N Overhaul kit NSN: 5330-01-527-0959 2 ea. 12,894.00
10 N **Stern tube split seal
NSN: 5330-01-359-5555 4 ea. 7,763.86
13 N Hub installation kit NSN: 2010-01-470-3258 2 ea. 2451.42
13 Y Left hand hub assembly
NSN: 2010-01-119-5469 1 ea. 304,313.00
13 Y Right hand hub assembly
NSN: 2010-01-118-8538 1 ea. 304,313.00
13 N *CPP Tool Kit N/A 1 set 20,000.00
13 N *"Special tools" (see
4.2 (Government-loaned installation tools))
N/A 1 set 1,000.00
13 Y Propeller Blade-LH
(Port)
NSN: 2010-01-119-3972 1 Set 40,000.00
13 Y Propeller Blade-RH
(Stbd)
NSN: 2010-01-120-2871 1 Set 40,000.00
13 N O-Ring NSN: 5330-01-120-5229 8 ea. 97.00
13 N O-Ring NSN: 5330-01-118-8529 8 ea. 96.00
13 N Blade Washer NSN: 5310-01-335-4361 48 ea. 112.00
13 N Propeller Blade
Bolts, M56 x 3 x 149
(QTY for one hub)
5306-01-118-8337 16 ea. 14,300.00
13 N Propeller Blade
Bolts, M56 x 2 x
136.5 (QTY for one hub)
5306-01-119-3607 32 ea. 27,454.40
14 N *** Fathometer transducer, shallow water, 50-200 kHz
(Airmar Technology
SS505) (without adapter plate)
NSN: 5845-01-470-2500 1 ea. 346.83
14 Y *** Fathometer
Transducer, deep water, 12 kHz
(ODOM
Hydrographic Inc.)
NSN: 5845-01-460-9969 1 ea. 14,530.00 xii (Rev-1)
15 Y ***DSN 450 Mark II
Dual Axis Doppler
Sonar Speed Log transducer
NSN: 5848-01-130-3490 1 EA 15,509.00
17 N **Rudder Stock
Sleeve
NSN: 2040-01-F91-0187 2 ea. 4,269.00
17 N **Thordon Lower
Bearing (SXL 20.7"
X 17.5" X 14)
PN: F546150102 NSN:
3120-20-006-6640
2 ea. 1,500.00
17 N **Major Overhaul
Kit for Rudder Stock
Seal
NSN: 5330-01-527-0778 2 ea. 1,000.00
20 Y **Rudder Assembly NSN: 2040-01-486-0550 2 ea. 182,000.00
20 N **Upper Bearing NSN: 3110-01-121-8032 2 ea. 3,910.00
20 N John Crane Seal kit NSN: 5330-01-527-0778 2 ea. 5,955.00
20 N **Thordon Lower
Bearing (SXL 20.7"
X 17.5" X 14)
PN: F546150102 2 ea. 1,000.00
22 N Seal PN: 1856959-3 (Sperry
Marine) = 17855H1L5
NSN: 5330-01-625-6617
4 ea. 152.00
22 N O-Rings PN: MS9021-381 NSN:
5331-00-763-2637
4 ea. 3.00
22 N Packing NSN: 5330-00-902-5505 2 Roll 177.00
22 N Packing NSN: 5330-00-527-7496 16 FT 5.00
22 N Thordon Bearing Set
Assembly
PN: TG-13886 OPTION 3
NSN: 3110-01-599-8155
2 ea. 6,200.00
22 N Inflatable Seal NSN: 5330-01-103-6518 2 ea. 689.00
22 Y **Roller Bearing NSN: 3110-00-155-9065 2 ea. 1,800.00
22 N Preformed packing NSN: 5331-01-306-4879 2 ea. 15.00
22 N O-ring PN: MS9021-359 NSN:
5331-00-435-0431
2 ea, 90.00
22 N O-ring PN: MS9021-377 NSN:
5331-01-129-0629
2 ea. 156.00
22 N Seal, Plain PN: 1856959-2 (Sperry
Marine) = 17444H1L5
NSN: 5331-01-625-4197
4 ea. 60.00
22 N **Seal Retainer NSN: 5330-01-382-7103 2 ea. 228.00
22 N Lantern Rings NSN: 4320-01-377-2106 2 ea. 1,167.00
22 N **Seal Housing NSN: 5330-01-382-9160 2 ea. 1,622.00
22 N **Tiller pin NSN: 5315-01-419-1523 4 ea. 1,000.00
22 N **Hydraulic Cylinder NSN: 3040-01-103-6565 4 ea. 4,426.57
22 Y **Fin Stock with sleeves
NSN: 3040-01-104-5121 2 ea. 16,109.00
22 Y **Threaded-end rod PN: 1857336 2 ea. 400.00
22 Y *Fin Removal Tools NSN: 5180-01-F10-1826 1 set 15,000.00
27 Y *Transducer Cover
Plate
N/A 4 ea. 50.00
46 Y **Intermediate Shaft NSN: 2010-01-365-3908 2 ea. 10,000.00
50 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 228,600.00 xiii (Rev-1)
51 N Stern tube bearing NSN: 3120-01-189-1949 2 ea. 12,700.00
N
*"Special tools" (see
4.2 (Government-loaned installation tools))
N/A 1 set 1,000.00
54 N 26” x 66” Quick-
Acting Watertight
Door, Aluminum, 8-
Dog, RH Swing (incl.
associated coaming)
N/A 1 5,345
14 Y Actuating Unit
Inspection Kit
P/N: 901/905-WMEC-
270300
NSN: 3010-01-470-3519
2 1,230
14 N Command Lever, Item # 34
P/N: 8 376 938 2 (Pending from
OEM)
14 N Feed Back Lever, Item # 81
P/N: 8 350 194 2 (Pending from
OEM)
14 N Feed Back Shaft, Item # 67
P/N: 8 376 949
4 (Pending from
OEM)
14 N Taper Pin
W/Extraction Thd, Item # 68
P/N: 5mm dia x 40mm lg 8 (Pending from
OEM)
56 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 228,600.00
57 Y **Propeller shaft NSN: 2010-01-135-7065 2 ea. 228,600.00
58 Y **Intermediate Shaft NSN: 2010-01-365-3908 2 ea. 10,000.00
61 N **Stern tube sleeve N/A 1 ea.
61 N **Propeller Strut sleeve
N/A 1 ea.
61 N **Intermediate Strut sleeve
N/A 1 ea.
61 N **Seal sleeve N/A 1 ea.
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xiv (Rev-1)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Hull Plating (U/W Body), Ultrasonic Testing
2 Appendages (U/W), Leak Test
5 Voids (Non-Accessible), Leak Test
7 Propulsion Shafting, Strain Gage Alignment, Inspect
11 Propulsion Shafting, Optical Or Laser Alignment Check
15 Controllable Pitch Propeller Hub Assembly, Renew
19 Sea Strainers - Duplex (All Sizes), Overhaul
20 Sea Strainers - Simplex (All Sizes), Clean and Inspect
22 Rudder Stock Bearings, Check Clearances
23 Rudder Assembly; Remove, Inspect and Reinstall
24 Rudder Assemblies, Inspect and Repair
25 Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or Renew
23 U/W Body, Preserve (100%)
40 Bilge; JP-5 Pump Room, Preserve (CSMP 20160061)
41 Bilge; Aux #2 Machinery Space, Preserve (CSMP 20160069)
46 Propulsion Intermediate Shaft; Remove, Inspect, and Reinstall
50 Propulsion Shafting; Remove, Inspect, and Reinstall
52 Propeller Blades, Inspect xv (Rev-1)
PRINCIPAL CHARACTERISTICS
270' WMEC (B-CLASS)
PHYSICAL
Length overall 270' 0"
Length between perpendiculars 255' 0"
Beam molded 38' 0"
Depth molded, main deck amidships, 01 level amidships
23' 7"
31' 4"
Full load displacement 1,886 long tons
Draft, full load to baseline amidships 14' 2"
Highest projection above baseline
*height approximated
≈ 110' 0"
Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase
Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each
Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475
KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers 2
Propeller diameter 9' 0"
Number of blades, each 4
Pitch Controllable
Shaft RPM 260
Shaft diameter 10.55" at exit of hull
Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 79,950 gal.
JP-5 total (95%) 19,626 gal.
Potable water total (100%) 8,553 gal.
Hydraulic & lube oil total (95%) 2,561 gal.
1 (Rev-1)
00000_0316_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure 3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
2 (Rev-1)
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Saturday, and limited to three (3)
Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
NOTE
The Contractor shall conduct nondestructive examination (NDE) of all welding/ brazing performed, in accordance with SFCL Std Spec 0740, whether explicitly stated in work items or not.
3.4.1 HY-130 material substitution. The Contractor shall be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 shall be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive testing/inspection (NDT/NDI) in accordance with NAVSEA TP 1688. The Contractor shall be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor shall provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s shall be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor shall ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
3 (Rev-1)
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 shall be considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non-USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
4 (Rev-1)
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for
Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel
Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-
STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line
Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:
SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE
WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing
Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC
Std Spec 6310 (Critical drying time requirements)).”
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-1)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-1)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-1)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
8 (Rev-1)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading (mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-1)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-1)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
COATING MFG PRODUCT NAME
BATCH
INDUCTION
TIME
COATING SYSTEM SEQUENCE
(PRIMER/TOUCHUP/3RD COAT, ETC.)
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,
ROLLED)
AVERAGE DFT
11 (Rev-1)
11010_UT_0712_FLT
REC_11010_UT_FLT_270’ WMEC ’B’ Class (THETIS) (1215)
WORK ITEM 1: Hull Plating (U/W Body), Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to conduct ultrasonic testing (UT) of U/W hull plating.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 905 WMEC 111-001, Rev D, Shell Expansion Fwd 101
Coast Guard Drawing 905 WMEC 111-002, Rev E, Shell Exp Aft 182
Coast Guard Drawing 905 WMEC 111-003, Rev E, Shell Exp FR 101-182
Coast Guard Drawing 905 WMEC 801-040, Rev F, Docking Plan
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
OTHER REFERENCES
None.
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph:
3.2 (UT measurements).
3.1.2 Tech Rep.
12 (Rev-1)
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .