QUESTIONS_AND_RESPONSES_II.doc

DOC document 35 KB Posted

Attached to
Welin Lambie Dual Point Davit Overhaul/Renewal
Solicitation number
HSCG80-16-Q-P45K60
Issued by

About this file

Questions and Responses II

View the file

Other files

File Type Posted
SF_30_Amendment_0003.pdf PDF
QUESTIONS_AND_RESPONSES_III.doc DOC document
SF_30_Mod_2.pdf PDF
SF_30.pdf PDF
QUESTIONS_AND_RESPONSES.doc DOC document
Enclosure_III_-_Travel_and_Per_Diem_Schedule.xls XLS spreadsheet
Enclosure_I_-_Contract_Pricing_and_CLIN_List.xlsx XLSX spreadsheet
HSCG80-16-Q-P45K60_v1.0.docx DOCX document
Enclosure_II_-_Specification_for_Welin_Lambie_Dual_Point_Davit_Model_TW_PIV_5.0B_Support_(Rev_1 _19_March_2015).docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LPI Questions regarding RFP HSCG80-16-Q-P45K60

Number
Reference
Issue
Question
1
RFP Enclosure II
On past overhauls and renewals, the Coast Guard has furnished the water bags and dynamometer used to perform the weight tests
COR Will the Coast Guard furnish the water bags and dynamometer under this program? No the contractor shall provide water bags and dynamometer
2
RFP Evaluation, Factor I
RFP requires documentation confirming capability of providing an Electrician who can perform work IAW SFLC Standard Spec. 2351, Overhaul DC Generators and Motors and SFLC Standard Spec. 3020, overhaul AC Electrical Motors In-Shop.
Would a resume or qualification summary of historical experience be acceptable? If not, what sort of documentation would be acceptable?

Resume or qualification summary of historical experience would be acceptable

3
RFP Evaluation, Factor I
RFP requires documentation confirming capability of providing a Ship Fitter who can perform work IAW Coast Guard Technical publication 3943, Twin Pivot Arm Davit, Type TW.PIV 5.0 B guidance, and drain & add hydraulic fluid to davit system for davit renewal and overhaul IAW SFLC Standard Spec. 5000, Auxiliary Machine Systems.
Would a resume or qualification summary of historical experience be acceptable? If not, what sort of documentation would be acceptable?

Resume or qualification summary of historical experience would be acceptable

4
RFP Evaluation, Factor I
RFP requires documentation confirming capability of providing a Painter who can perform work IAW SFLC Standard Spec. 6310, Requirements for Preservation of Ship Structures, COMDTINST M10360.3 Colors & Coating Manual, Federal Standard 595B, NACE International Joint Surface Preparation Standard SSPC-SP7/NACE NO.4, 2007, Brush Off Blast Cleaning.
Would a resume or qualification summary of historical experience be acceptable? If not, what sort of documentation would be acceptable?

Resume or qualification summary of historical experience would be acceptable

5
RFP Evaluation, Factor I
RFP requires documentation of our Welder certification IAW SFLC Standard Spec 0740, Welding and Allied Processes 2014.
Please confirm that certification to the equivalent MIL STD-1689A standard is acceptable. MIL STD-1689A standard is acceptable for Welders.
6
RFP Instructions to Offerors
RFP limits Technical Capabilities page count to 10 pages. Depending on answers to previous questions, documentation confirming capability of Electrician, Ship Fitter, Painter, and Welder could exceed 10 pages alone.
Request that this documentation be excluded from the page count.

Page limit will stay the same.

Extension will be granted to Tuesday, November 10, 2015 at 3:00pm EST

File details come from the government source that posted it. Updated .