Enclosure_II_-_Specification_for_Welin_Lambie_Dual_Point_Davit_Model_TW_PIV_5.0B_Support_(Rev_1 _19_March_2015).docx

DOCX document 157 KB Posted

Attached to
Welin Lambie Dual Point Davit Overhaul/Renewal
Solicitation number
HSCG80-16-Q-P45K60
Issued by

About this file

Enclosure II - Specification

View the file

Other files

File Type Posted
SF_30_Amendment_0003.pdf PDF
QUESTIONS_AND_RESPONSES_III.doc DOC document
SF_30_Mod_2.pdf PDF
QUESTIONS_AND_RESPONSES_II.doc DOC document
SF_30.pdf PDF
QUESTIONS_AND_RESPONSES.doc DOC document
Enclosure_III_-_Travel_and_Per_Diem_Schedule.xls XLS spreadsheet
Enclosure_I_-_Contract_Pricing_and_CLIN_List.xlsx XLSX spreadsheet
HSCG80-16-Q-P45K60_v1.0.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC (WMEC & WHEC CLASSES)

SPECIFICATION FOR WELIN LAMBIE DUAL POINT DAVIT MODEL TW PIV 5.0B SUPPORT

FY2016

Developed By: Louis N Mikedis (Rev-1, 19 March 2015)

TABLE OF CONTENTS

Revisions Recordiii
Consolidated List of Referencesiv
Consolidated List of Government-furnished Propertyvii
Consolidated List of Critical Inspection Itemsviii
Principal Characteristicsix
General Requirements1
WORK ITEM 1: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Inspect, Test and Overhaul12
WORK ITEM 2: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Renew24

USCGC (WMEC & WHEC CLASSES) FY16

ii
(Rev-1)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iii
(Rev-1)

Consolidated List of References The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 378 FRAM E 583-010, Rev E, OTHB Installation Coast Guard Drawing 378 FRAM W 583-038, Rev L, OTHB Installation Coast Guard Drawing 618 WMEC 583-003, Rev E, Diagram Boat Davit Hydraulic Circuit (applicable for 210 A class vessels) Coast Guard Drawing 618 WMEC 583-063, Rev F, OTHB Davit Arrangement (applicable for 210 A class vessels) Coast Guard Drawing 618 WMEC 583-064, Rev D, OTHB Davit Installation (applicable for 210 A class vessels) Coast Guard Drawing 618 WMEC 583-065, Rev-, OTHB Davit - Access Platform Mod (applicable for 210 A class vessels) Coast Guard Drawing 627 WMEC 583-003, Rev C, Boat Davit Hydraulic Circuit (applicable for 210 B class vessels) Coast Guard Drawing 627 WMEC 583-006, Rev D, Hydraulic Piping for Boat Davits (applicable for 210 B class vessels) Coast Guard Drawing 627 WMEC 583-040, Rev H, OTHB Davit Arrangement (applicable for 210 B class vessels) Coast Guard Drawing 627 WMEC 583-041, Rev F, OTHB Davit Installation (applicable for 210 B class vessels) Coast Guard Drawing 627 WMEC 583-042, Rev A, OTHB Davit - Access Platform (applicable for 210 B class vessels) Coast Guard Drawing 901 WMEC 583-011, Rev C, Boat Davit Hydraulic Power Unit Installation and Assembly (applicable for 270 A class vessels) Coast Guard Drawing 901 WMEC 583-013, Rev A, Boat Davit Outline and Assembly (applicable for 270 A class vessels) Coast Guard Drawing 901 WMEC 583-015, Rev-, Davit Modifications Arrangement and Details (applicable for 270 A class vessels) Coast Guard Drawing 901 WMEC 583-021, Rev D, OTHB Electrical Installation (applicable for 270 A class vessels) Coast Guard Drawing 901 WMEC 583-023, Rev E, OTHB Davit Installation (applicable for 270 A class vessels) Coast Guard Drawing 901 WMEC 583-024, Rev F, OTHB Davit Arrangement (applicable for 270 A class vessels) Coast Guard Drawing 905 WMEC 583-004, Rev A, Boat Davit Hydraulic System A&D (applicable for 270 B class vessels) Coast Guard Drawing 905 WMEC 583-005, Rev B, Boat Davit Control System - BLK & IWD (applicable for 270 B class vessels) Coast Guard Drawing 905 WMEC 583-010, Rev A, Boat Davit Hoist/Winch – A&D (applicable for 270 B class vessels) Coast Guard Drawing 905 WMEC 583-013, Rev B, Boat Davit Installation and Assembly (applicable for 270 B class vessels) Coast Guard Drawing 905 WMEC 583-024, Rev F, OTHB Davit Arrangement (applicable for 270 B class vessels) Coast Guard Drawing 905 WMEC 583-025, Rev E, OTHB Davit Installation (applicable for 270 B class vessels) Coast Guard Drawing FL 2605-038, Rev A, Welin Lambie 5.0B RHI Cradle End Pads Coast Guard Drawing FL 8201-107, Rev A, Welin Lambie Davit OTH Boat Gripe Assemblies Coast Guard Fleet Drawing FL-8201-97, Rev A, Boat Lifting Ring Assembly (6600 LBS)

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), 2014, Overhaul DC Generators & Motors Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels ASTM International (ASTM) D3951, R2004, Standard Practice for Commercial Packaging FED-STD-595B, Colors Used in Government Procurement The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning

USCGC (WMEC & WHEC CLASSES) FY16

vi
(Rev-1)

Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

1
N
4 Year Davit In-place Overhaul Kit
P/N: 892-02053
1 ea.
119,000.00
2
Y
Welin-Lambie OTHB Davit
Model number 5558 Series
1 ea.
582,000.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

vii
(Rev-1)

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars):

Work Item
Title

2 Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Renew

This section is not applicable to this package.

USCGC (WMEC & WHEC CLASSES) FY16

viii
(Rev-1)

Principal Characteristics 210' WMEC (A-Class)

Physical

Length overall
210' 6"
Length between perpendiculars
200' 0"
Beam molded
34' 0"
Depth molded, main deck amidships
19' 6"
Full load displacement
1,170 long tons

Draft, full load to baseline amidships *Baseline is 9” below keel amidships 12' 0"

Design drag between perpendiculars
1' 6"

Highest projection above baseline *VHF-FM ADF antenna 90' 0"

Shore tie voltage requirements
400A / 440V
Frame spacing
1' 0"

Machinery

Main propulsion
2 ALCO Model 16-251-CE Diesel Engines,

5,000 BHP total

Ship's service generators
2 Caterpillar Model 3406B Diesel-driven SR4,

250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle

Emergency generator
Caterpillar Model 3306B Diesel-driven SR4,

180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle

Number of propellers
2
Propeller diameter
7' 6"
Number of blades, Each
4
Pitch
Controllable
Shaft RPM
300
Shaft diameter
8.25" at exit of hull
Anchor & chain
Two 2,800 lb Navy Stockless Anchors,

7 shots of chain each

Tank Capacities

Diesel fuel total (95%)
47,140 gal.
Fresh water total (100%)
11,135 gal.
JP-5 fuel total (95%)
4,717 gal.
Lube oil total (95%)
2,331 gal.

210' WMEC (B-Class)

Physical

Length overall
210' 6"
Length between perpendiculars
200' 0"
Beam molded
34' 0"
Depth molded, main deck amidships
19' 6"
Full load displacement
1,170 long tons

Draft, full load to baseline amidships *Baseline is 9” below keel amidships 12' 0"

Design drag between perpendiculars
1' 6"

Highest projection above baseline *VHF-FM ADF antenna 90' 0"

Shore tie voltage requirements
400A / 440V
Frame spacing
1' 0"

Machinery

Main propulsion
2 ALCO Model 16-251-B Diesel Engines,

5,000 BHP total

Ship's service generators
2 Caterpillar Model 3406B Diesel-driven SR4,

250 KW each @ 0.8 power factor, 440VAC, 3 phase, 60 cycle

Emergency generator
Caterpillar Model 3306B Diesel-driven SR4,

180 KW @ 0.8 power factor, 440VAC, 3 phase 60 cycle

Number of propellers
2
Propeller diameter
7' 6"
Number of blades, each
4
Pitch
Controllable
Shaft RPM
300
Shaft diameter
8.25" at exit of hull
Anchor & chain
Two 2,800 lb Navy Stockless Anchors,

7 shots of chain each

Tank Capacities

Diesel fuel total (95%)
48,427 gal.
Fresh water total (100%)
11,693 gal.
JP-5 fuel total (95%)
4,683 gal.
Lube oil total (95%)
2,390 gal.

270' WMEC (A-Class)

Physical

Length overall
270' 0"
Length between perpendiculars
255' 0"
Beam molded
38' 0"

Depth molded, main deck amidships 01 level amidships 23' 6" 31' 4"

Full load displacement
1,902.2 long tons
Draft, full load to baseline amidships
14' 3"

Highest projection above baseline *height approximated ≈ 110' 0"

Shore tie voltage requirements
2 cables, 400A / 450V, 3 phase
Frame spacing
1' 0"

Machinery

Main propulsion
2 ALCO Model 18-251-F Diesel Engines, 3,600 BHP each
Ship’s service generators
2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators
Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers
2
Propeller diameter
9' 0"
Number of blades, Each
4
Pitch
Controllable
Shaft RPM
260
Shaft diameter
10.55" at exit of hull
Anchor & chain
Two 4,000 lb Navy Stockless Anchors,

8 shots of chain each

Tank CAPACITIES

Diesel fuel total (95%)
79,210 gal.
JP-5 total (95%)
25,890 gal.
Potable water total (100%)
8,553 gal.
Hydraulic & lube oil total (95%)
2,237 gal.

270' WMEC (B-Class)

Physical

Length overall
270' 0"
Length between perpendiculars
255' 0"
Beam molded
38' 0"
Depth molded, main deck amidships, 01 level amidships
23' 7"

31' 4"

Full load displacement
1,886 long tons
Draft, full load to baseline amidships
14' 2"

Highest projection above baseline *height approximated ≈ 110' 0"

Shore tie voltage requirements
2 cables, 400A / 450V, 3 phase
Frame spacing
1' 0"

Machinery

Main propulsion
2 ALCO Model 18-251-F Diesel Engines, 3,650 BHP each
Ship’s service generators
2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-1350 Generators. 475 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators
Caterpillar Model D-348-TA Diesel-driven KATO 4P4-1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers
2
Propeller diameter
9' 0"
Number of blades, each
4
Pitch
Controllable
Shaft RPM
260
Shaft diameter
10.55" at exit of hull
Anchor & chain
Two 4,000 lb Navy Stockless Anchors,

8 shots of chain each

Tank CAPACITIES

Diesel fuel total (95%)
79,950 gal.
JP-5 total (95%)
19,626 gal.
Potable water total (100%)
8,553 gal.
Hydraulic & lube oil total (95%)
2,561 gal.

378 WHEC (E-Class: GALLATIN)

Physical

Length overall
378' 3"
Length between perpendiculars
350' 0"
Maximum beam (@ 13' 6" dwl)
43' 3/4"
Beam @ main deck
42' 0"
Depth
26' 0-3/8"
Main deck camber
6" in 21' 0"
Minimum berth depth
20' 0"
Height of highest projection
115' 0-3/4"
Draft, fwd @ full load
14.78'
Draft, aft @ full load
15.61'
Draft, fwd @ minimum operating
14.63'
Draft, aft @ minimum operating
15.33'
Full load displacement
3150 long tons
Minimum operating displacement
2760 long tons
Light ship displacement
2422 long tons

Hull

Frame spacing
1' 0"

Material

Deckhouse, fwd of Fr 96
HY-100 Steel
Main deck frames 183 to 242-1/2 and fwd of FR 96
HY-80 Steel
01 level frames 183 to 316
HY-80 Steel
Lower hull around bow thruster, port and starboard Strakes A-3 and A-4, Frames 56 to 96
HY-80 Steel
Masts and superstructure above the 01 deck
Type 3456 Aluminum
Remaining
ASTM A-131

Machinery

Type of propulsion
CODOG
Two diesel engines
Fairbanks Morse 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total
Two gas turbines
Pratt and Whitney FT4A-2; 36,000 SHP total
Two controllable pitch propellers
Escher Wyss 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbines
Two reduction gears
Western Gear
Electrical characteristics
Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room)

One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator

Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators

Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators

Tanks

Diesel oil
198,092 gal. (95%)
Fresh water
17,794 gal. (100%)
JP-5 fuel
25,717 gal. (95%)

378 WHEC (E-Class: CHASE)

Physical

Length overall
378' 3"
Length between perpendiculars
350' 0"
Maximum beam (@ 13' 6" dwl)
42' 0
Beam @ main deck
42' 0"
Depth
26' 0-3/8"
Main deck camber
6" in 21' 0"
Minimum berth depth
20' 0"
Height of highest projection
115' 0-3/4"
Draft, fwd @ full load
14.78'
Draft, aft @ full load
15.61'
Draft, fwd @ minimum operating
14.63'
Draft, aft @ minimum operating
15.33'
Full load displacement
3171 long tons
Minimum operating displacement
2760 long tons
Light ship displacement
2422 long tons

Hull

Frame spacing
1' 0"

Material

Deckhouse, fwd of Fr 96
HY-100 Steel
Main deck frames 183 to 242-1/2 and fwd of FR 96
HY-80 Steel
01 level frames 183 to 316
HY-80 Steel
Lower hull around bow thruster, port and starboard strakes A-3 and A-4, frames 56 to 96
HY-80 Steel
Masts and superstructure above the 01 deck
Type 3456 Aluminum
Remaining
ASTM A-131

Machinery

Type of propulsion
CODOG
Two diesel engines
Fairbanks Morse 12-cylinder opposed piston 38-TD-8-1/8; 7000 SHP total
Two gas turbines
Pratt and Whitney FT4A-2; 36,000 SHP total
Two controllable pitch propellers
Liaaen 4 blade, 13' 0" diameter; 149 RPM max on Diesel engines; 235 RPM max on Gas turbine
Two reduction gears
Western Gear
Electrical characteristics
Two 550KW-AC Type, 450V, 60 Hz, 3 Phase, 720 RPM GM 8-645 diesel driven ship's service generators (located in the Engine Room)

One 500KW-AC Type, 450V, 60 Hz, 3 Phase, Solar Model 101506-2001 gas turbine driven emergency service generator

Two 25 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators

Two 10 KVA (PF = 0.8), 120V, 400 Hz, 3 Phase Electronic Specialty motor generators

Tanks

Diesel oil
198,092 gal. (95%)
Fresh water
17,794 gal. (100%)
JP-5 fuel
25,717 gal. (95%)
27
(Rev-1)

00000_0315_FLT

REC_00000_FLT_ Commercial Project @ CG Facility (1212) General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings None Coast Guard Publications Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 5 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 5 of COMDTINST MI0360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility shall be provided at time of award.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to adequately accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.6 Additional Requirements. The Contractor shall be aware of the following:

3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.

3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

None.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (Frame References)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________ Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils

Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils

Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils

Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils

Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils Place Surface Profile Replica Tape Here Reading:__________ mils

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________ Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils

Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):

_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15

DATE
TEST LOCATIONS
CONDUCTIVITY

(microsiemens/cm)

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT
1
2
3
4
5

Overall Avg. DFT

ADJUSTMENTS

Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

SPOT
1
2
3
4
5

Overall Avg. DFT

ADJUSTMENTS

Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

SPOT
1
2
3
4
5

Overall Avg. DFT

ADJUSTMENTS

Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

58300_0813_210_270 WORK ITEM 1: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Inspect, Test and Overhaul

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect, test, and overhaul a Welin-Lambie TW.PIV 5.0B Dual Point Davit.

1.2 Government-furnished property.

MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/UNIT)

N
4 Year Davit In-place Overhaul Kit
P/N: 892-02053
1 ea.
119,000.00

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT Service Center.

2. REFERENCES

Coast Guard Drawings None.

Coast Guard Publications Coast Guard Technical Publication (TP) 3943, Apr 2008, Twin Pivot Arm Davit - Type Tw.Piv 5.0B - Ref. No. 5558-1 Thru 5558-15 Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 2351 (SFLC Std Spec 2351), 2014, Overhaul DC Generators & Motors Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC Electrical Motors In-Shop Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Other References ASME BPV Code Section VIII, Division 1 & 2, Rules for the Construction of Pressure Vessels ASTM International (ASTM) D3951, R2004, Standard Practice for Commercial Packaging British Standard (BS) BS EN 837-1, 03/1998, Pressure Gauges Part 1: Bourdon Tube Pressure Gauges – Dimensions, Metrology, Requirements and Testing FED-STD-595B, Colors Used in Government Procurement The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning

3. REQUIREMENTS

3.1 General. The Contractor shall accomplish all work herein in accordance with SFLC Std Spec 5000 and TP 3943. The Contractor shall provide all services required to accomplish the work herein on the Welin-Lambie TW.PIV 5.0B Dual Point Davit system.

3.1.2 Tech Rep. The Coast Guard (SFLC MECPL) will provide the services of a qualified Tech Rep, who is certified/authorized by Welin-Lambie on Model TW.PIV 5.0B davit, to accomplish the following tasks – on site:

Advise on manufacturer's proprietary information pertinent to the system.

Assist with proper repair methods, and ensure compliance with manufacturer’s procedures and standards during disassembly, inspection, repair, modification, calibration, reassembly and test of the equipment/system.

3.1.2.1 The Tech Rep’s name will be provided to the Contractor at the Arrival Conference.

3.1.3 Protective measures.

3.1.3.1 General. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.3.2 Hydraulic system(s). The Contractor shall maintain existing hydraulic system cleanliness and take all necessary precautions to prevent the introduction of contaminants into the hydraulic system. Immediately after disconnecting or removing components from the hydraulic system, the Contractor shall completely seal all openings to the rest of the system using caps for externally threaded connection points, bolt-on blanks, or taped-on discs/covers made of durable plastic or sheet-metal that is no less than 1/16-inch thick.

NOTE

Plastic bags may be used only when arrangement or configuration prevents the use of the other sealing methods specified above.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

3.1.5 Structural fasteners. The Contractor shall renew all structural fasteners with 300-series stainless steel fasteners.

3.1.6 Receipt report. Upon receipt of the government furnished overhaul kit and parts identified from Welin Lambie Pre-Inspection Report, the Contractor shall inspect and inventory the government furnished overhaul kit and parts identified from Welin Lambie Pre-Inspection Report and submit a CFR on the following:

· Missing or damaged parts/components with photographs of each.

3.2 Clean and visually inspect. The Contractor shall clean and visually inspect the following and submit a CFR:

· Davit assembly.

· Sheaves.

· Boat block assembly.

· Hydraulic reservoir(s).

· Exterior electrical cables, wiring, and conduit.

· All machinery foundation welds.

· Davit frame.

· Winches.

· Forward davit arm.

· Aft davit arm.

3.3 Overhaul. As applicable, the Contractor shall inspect, overhaul, and preserve the following components/assemblies and sub-components/assemblies:

3.3.1 Mechanical.

3.3.1.1 Structural and rigging gear, including:

· Cranston hook assemblies.

· Sheave assemblies.

· Fwd davit arm hinge pin assembly.

· Aft davit arm hinge pin assembly.

3.3.2 Renewals.

3.3.2.1 If required, the Contractor shall renew steel boat blocks with aluminum boat blocks. Submit CFR.

3.3.3 Updates and upgrades. The Contractor shall update and/or upgrade the following, as required:

3.3.3.1 Component upgrades.

· Based on Pre-Inspection report provided by Welin Lambie.

· Others as directed by Welin Lambie that can be completed by the contractor.

3.3.4 Pressure gauge calibration. The Contractor shall ensure all pressure gauges are in accordance with BS EN 837-1 and be calibrated and certified. Affix calibration labels to the faces of all gauges noting the calibration facility name and date tested.

3.4 NDI. The Contractor shall perform NDI of the following in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.

· Forward davit arm.

· Aft davit arm.

3.5 Surface preservation. The Contractor shall preserve the davit, using SFLC Stnd Spec 6310, FED-STD-595B and SSPC-SP-7 as guidance, as follows:

3.5.1 Ferrous components – 100% preservation. Contractor shall prepare and preserve in accordance with SFLC Std Spec 6310 Appendix A5 Machinery, Deck, Option 1, with the following exception; contractor shall substitute Dimetcote 302 H zinc rich primer with Sigma Zinc 109 HS zinc rich primer, Color 10371 (Spar).

3.5.2 Ferrous components – partial preservation. . Contractor shall prepare and preserve in accordance with paint manufacturers data sheets with the following exception; contractor shall substitute Dimetcote 302 H zinc rich primer with Sigma Zinc 109 HS zinc rich primer. Color 10371(Spar)

3.5.3 Non-ferrous components. Contractor shall prepare and preserve in accordance with SFLC Std Spec 6310 Appendix A5 Machinery, Deck, Option 1, with the following exception; contractor shall substitute Intergard 269 primer with Sigma Cover 280 primer. Color 10371 (Spar).

3.6 Lubricate. The Contractor shall lubricate the Welin-Lambie davit system in accordance with TP 3943.

3.7 Test requirements – Post Overhaul.

3.7.1 Test plan. The Contractor shall submit a test plan to the KO for approval, to include the tests prescribed herein, prior to commencement of testing.

3.7.2 Test notification. The Contractor shall give Coast Guard personnel 07 days notice prior to testing.

3.7.3 Post overhaul tests. After completion of work and in the presence of Coast Guard personnel and a qualified Tech Rep, who is certified/authorized by Welin-Lambie on Model TW.PIV 5.0B davit, the Contractor shall conduct the following operational tests of the davit system, on a level plane to prove satisfactory operating condition in accordance with SFLC Std Spec 5000 and as specified herein. Submit a CFR summarizing all test results.

3.7.3.1 No load test. Conduct an operational test of the davit using no load over the entire range of motion.

3.7.3.2 Static Brake Test Load. Conduct a static brake test using 150% of the Safe Working Load (SWL) of 11,000 lbs or (16,500 lbs plus or minus 25 lbs) hold the load for a minimum of 5 minutes and inspect the brake for slippage or creep. Conduct test with a 50-50 weight distribution.

3.7.3.3 Dynamic Test Load (DTL) tests. Conduct the following dynamic test using 125% of the Safe Working Load (SWL) of 11,000 lbs or (13,750 lbs plus or minus 25 lbs) while the system is operated in the normal power mode and the hydraulically-stored energy mode (emergency operation). Conduct test with a 50-50 weight distribution for each operation mode.

3.7.3.3.2 Luffing speed test at 125% SWL. Record luffing speeds from the fully-retracted to the fully-extended positions and then from the fully-extended to fully-retracted positions at 125% SWL (13,750 lbs plus or minus 25 lbs).

NOTE

Both luffing speed tests in normal operation mode shall meet a 30 to 33 second nominal luff-in and 41 to 43 second nominal luff-out time. Plus or minus 3 seconds.

NOTE

Both luffing speed tests in emergency operation mode shall meet a 24 to 28 second nominal luff-in and 24 to 28 second nominal luff-out time. Plus or minus 3 seconds.

3.7.3.3.3 Dynamic test (at SWL) data recording. During the SWL dynamic test, record the following:

3.7.3.3.3.1 Main winch running speed test – gravity lower, measure and record the main winch speed

NOTE

The minimum speed shall be 73.3 RPM rope drum speed.

3.7.3.3.3.2 Main winch hoist test – demonstrate variable speed, measure and record fast and slow hoist under power.

NOTE

The minimum fast speed and low hoist speeds shall be 55 RPM and 19.5 RPM rope drum speed, respectively.

3.7.3.3.3.3 Main winch lower test – demonstrate variable speed, measure and record fast and slow lowering under power.

NOTE

The minimum fast speed and low lowering speeds shall be 56.2 RPM and 20.7 RPM rope drum speed, respectively.

3.7.3.3.4 Emergency hand hoisting at 110% SWL (12,100 lbs). The hand hoist shall be operated satisfactorily at 110% SWL (12,100 lbs).

3.7.3.4 Safety and emergency feature testing. Operate the davit and test all emergency stop(s), limit switch activation, brake turning handle, and emergency luffing mode (using accumulators).

3.7.4 Test certification. The Contractor shall provide a test certification, identified by davit serial number and date of completion, upon successful completion of all testing.

3.9 Label plate. The Contractor shall install a label plate(s) to document satisfactory test completion in accordance with SFLC Std Spec 5000, Appendix B, Paragraph B2.9 (Label Plates).

4. NOTES

4.1 Davit information:

· National Stock Number (NSN): 2030-99-454-8999

· Item name: Dual Point Davit

· Part Number (PN): TW.PIV 5.0B

· Original Equipment Manufacturer (OEM): Welin Lambie LTD

4.2 Partial List of Contractor-furnished property. The following is a list of parts/components the Coast Guard requires to be renewed, but may not be all-inclusive of parts that may need to be renewed. Additional parts recommended by the Contractor for renewal shall be done via CFR.

Part Number
Description
QTY
892-02053
4 YEAR DAVIT IN-PLACE OVERHAUL KIT

Boat Block Assembly Drawing 5650-5601

5201-8711
Sheave Bush
2
5201-8611
Isolating Bush
4
675-05035
Tension Pin
2
7300-0120
Thrust washer
2
7300-0121
Sleeve Bearing
2
651-10015
External Circlip
2
5440-5511
Rubbing Strip
4
5440-5711
Rubbing Strip
4
5440-5611
Rubbing Strip
4
616-02056
Slotted CSK HD Screw
16
616-02048
Hex HD Screw
8
616-02051
Plain Washer
8
616-02050
Hex HD Setscrew
8
616-02053
Hex Nut
8
616-02046
Plain Washer
16

Davit Assembly Drawing 5631-4601

5204-5211
Arm Pivot Bush
4
639-01070
Locknut
4
5202-8411
Cylinder Pin Bush
4
5191-4711
Roller
8
7500-1225
Self-Lubricating Bearing
32
679-40032
Split Cotter Pin
32
5191-4611
Roller
8
5418-1631
Striker Arm
2
679-38032
Split Cotter Pin
8
800-02033
Main Rope – FWD
1
800-02034
Main Rope – AFT
1
889-01048
Grease Nipple
28
889-01049
Grease Nipple
2
7967-0702
Oil Seal
32
5202-7211
Sleeve
32
7004-0055
Deep Groove Ball Bearing
32
652-00100
Internal Circlip
16

Winch Gearbox Assembly Drawing 5508-7002

5405-6911
Gasket
1
5062-0611
Bearing Housing
1
7967-0453
Oil Seal
1
5201-6111
Sleeve
1
7004-0045
Deep Groove Ball Bearing
1
889-02105
Sealing Washer
2
889-02006
Flanged Plug
2
859-01333
Miniature Immersion Heater
1
679-40030
Split Cotter Pin
2
647-00820
Plain Washer
2
7500-1220
Self-Lubricating Bearing
2
5727-0801
Brake Cylinder
1
677-40045F
Split Cotter Pin
1
651-10065
External Circlip
2
7960-0603
O-Ring
1
7967-0401
Oil Seal
1
5520-6301
Brake Shoe Assembly
1
2520-1901
Centrifugal Brake Shoe Assembly
6
7960-0453
O-Ring
1
7967-0551
Oil Seal
1
652-10052
Internal Circlip
1
5425-6331
Cylinder Plate
1
5204-5011
Bush
1
679-38020
Split Cotter Pin
1
647-00810
Plain Washer
1
7500-0612
Self-Lubricating Bearing
2
5421-8011
Pivot Plate
1
629-00016
Hex Nut
1
609-16150
Hex HD Setscrew
1
894-01706
Bonded Washer
1
683-00327
Compression Spring
4
647-00816
Plain Washer
4
651-10030
External Circlip
4
647-00830
Plain Washer
4
5492-6011
Motor T.B. Gasket
1
651-10045
External Circlip
1
677-40025F
Split Cotter Pin
6

Falls Tension Winch Assembly Drawing 5503-3902

5142-6911
Anchor Pin
2
5590-1411
Modified Nut
2
679-39050
Split Cotter Pin
2
5492-6011
Motor T.B. Gasket
2
5293-2311
Gasket
2
7960-1543
O-Ring
2
891-05524
Brake Lining
2

Control Station Assembly Drawing 5694-4701

830-00110
PVC Strip Seal
1
5405-7111
Gasket
1

Hydraulic Assembly Drawing 5631-4602

5726-6101
Pressure Hose Assembly
2
5726-5901
Pressure Hose Assembly
2
5726-6001
Pressure Hose Assembly
4
890-90204
Equal Tee
1
890-90203
Elbow Fitting
1

Hydraulic Reservoir Assembly Drawing 5735-1001

5405-7911
Reservoir Gasket
1
894-00915
Suction Strainer
2
894-00836
Oil Heater
1
894-01709
Bonded Washer
1
894-00835
Air Bag
1
894-00913
Pressure Filter
2
894-00822
Desiccant Breather
1
894-00834
Desiccant Breather Adaptor
1
894-00813
Breather
1
894-00321
Relief Valve
2
891-00601
Pressure Filter Element
2
891-00449
Water Filter Element
1
894-00908
Return Filter Element
1
5492-6011
Motor T.B. Gasket
2
894-10213
Male Stud Coupling
2
894-10215
Male Stud Coupling
4
894-11355
Reducer
2
5425-8911
Bell Housing Gasket
2
5433-7811
Pump Gasket
2
894-00206
Hydraulic Pump
2

Hydraulic Panel Assembly Drawing 5733-1301

894-00319
Solenoid Coil
1
5406-4511
Hydraulic Panel Gasket
1

Misc.

885-02061
Accumulator Gas Valve
2
885-02059
Accumulator Bladder Kit
2
885-02072
Accumulator Bleed Valve
2
891-00460
Accumulator Cushion Ring
2
885-02025
Accumulator Safety Block
1
885-02073
Accumulator Burst Disk
2
892-01013
Seal Kit (Hyd Cylinder)
2
891-00451
Overcentre Valve
4

58301_0813_1012_270 WORK ITEM 2: Welin-Lambie Model TW.PIV 5.0B Dual Point Davit, Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to upgrade the Welin Lambie TW PIV 5.0B Davit arrangement & Renew Welin-Lambie TW.PIV 5.0B Dual Point Davit for 210 WMEC Class, 270 WMEC Class and the 378 WHEC cutters.

1.2 Government-furnished…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .