REV_CGC_SKIPJACK_SCHEDULE_OF_SUPPLIES__SERVICES_DATED_11_19_12.xls

XLS spreadsheet 35 KB Posted

Attached to
DRYDOCK FOR CGC SKIPJACK AND CGC MANTA
Solicitation number
HSCG80-13-R-P45033
Issued by

About this file

CGC SKIPJACK SCHEDULE OF SUPPLIES/SERVICES DATED 11/19/12

View the file

Other files

File Type Posted
SF30_Amendment_03_CGC_Skipjack.pdf PDF
MANTA_(WPB_87)_DD_1300_REV1_092712.doc DOC document
HSCG8013RP45033_A0001.pdf PDF
MANTA_SCHEDULE_OF_SUPPLIES_ _SERVICES.xls XLS spreadsheet
SPEC_FOR_SKIPJACK_08_28_2012_REV0.doc DOC document
SOLICITATION_for_CGC_SKIPJACK_AND_MANTA.doc DOC document
SPEC_FOR_MANTA_08_15_12__REV0.doc DOC document
SKIPJACK_SCHEDULE_OF_SUPPLIES_SERVICES.xls XLS spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC SKIPJACK (WPB-87353) DRYDOCK AVAILABILITY 2013
11/19/12
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001PERFORM ULTRASONIC THICKNESS MEASUREMENTS (D)JB1$0
O-002PERFORM ULTRASONIC THICKNESS MEASUREMENTS (O)25 SHOTS10$0
D-003DIRTY OIL TANK, CLEAN AND INSPECT (D)JB1$0
D-004OILY WATER TANK, CLEAN AND INSPECT (D)JB1$0
D-005TANKS (MP FUEL SERVICE), CLEAN & INSPECT (D)JB1$0
D-006PILOTOUSE DECK (ALUM.), INSPECT, PRESERVE, & RENEW ELECTRICAL MATTING (D)JB1$0
O-007DEPTH SOUNDER, CAPASTIC FAIRING, RENEW (O)JB1$0
O-008MAIN ENGINE/REDUCTION GEAR, REALIGN (O)JB1$0
D-009PROPULSION SHAFTS, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
O-010PROPULSION SHAFT, REPAIR (O)JB1$0
O-011PROPULSION SHAFT, STRAIGHTEN (O)JB1$0
O-012AFT WATER-LUBRICATED SHAFT BEARING, RENEW (O)JB1$0
O-013INTERMEDIATE BEARINGS CARRIER, RENEW (O)JB1$0
O-014AFT BEARING CARRIER, RENEW (O)JB1$0
O-015STERN TUBES, INTERIOR SURFACES, PRESERVE 100% (O)JB1$0
O-016STERN TUBES, INTERIOR SURFACES, REPAIR (O)JB1$0
D-017PROPELLERS, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
O-018PROPELLER, MINOR RECONDITIONING AND REPAIR, PERFORM (O)JB1$0
D-019FATHOMETER TRANSDUCER, RENEW (D)JB1$0
D-020SPEED LOG, TRANSDUCER AND SKIN VALVE, CLEAN AND INSPECT (D)JB1$0
D-021SEA WATER (VALVES, STRAINERS, PIPING), CLEAN, INSPECT, AND REPAIR (D)JB1$0
D-022RUDDER ASSEMBLIES, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
D-023RHIB NOTCH SKID PADS, INSPECT (D)JB1$0
O-024RHIB NOTCH SKID PADS STUDS, RENEW (O)05 STUDS10$0
D-025STERN LAUNCH DOOR, REMOVE, INSPECT, AND REINSTALL (D)JB1$0
D-026GREY WATER HOLDING TANK, CLEAN AND INSPECT (D)JB1$0
D-027SEWAGE HOLDING TANK, CLEAN AND INSPECT (D)JB1$0
D-028GREY WATER PIPING, CLEAN AND FLUSH (D)JB1$0
D-029SEWAGE PIPING, CLEAN AND FLUSH (D)JB1$0
D-030JOINER BULKHEAD PANEL, RENEW (D)JB1$0
D-031TANKS ( DIRTY OIL AND WASTE), PRESERVE “100%” (D)JB1$0
O-032U/W BODY, PRESERVE ("100%")(O)JB1$0
D-033CATHODIC PROTECTION/ZINCS, RENEW (D)JB1$0
D-034DRYDOCKING (D)JB1$0
D-035TEMPORARY SERVICES, PROVIDE (D)JB1
D-036TELEPHONE SERVICE, PROVIDE (D)JB1
O-037INTERMEDIATE WATER-LUBRICATED SHAFT BEARINGS, RENEW (O)JB1
D-038INSTALL STAINLESS STEEL HULL INSERTS AND RENEW BMDE CONCENTRIC RINGS (D)JB1
D-039HULL PLATING FREEBOARD, PRESERVE 100 % (D)JB1
D-040INTERIOR DECK COVERING SYSTEM JOINER DECK, RENEW (D)JB1
D-041MAST, PRESERVE (D)JB1
D-042ANCHOR WINDLASS FOUNDATION, PRESERVE (D)JB1
D-043DECKS-EXTERIOR (SLIP RESISTANT SHEETS) RENEW (D)JB1
A-OComposite Labor RateHour460$0
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .