SKIPJACK_SCHEDULE_OF_SUPPLIES_SERVICES.xls
XLS spreadsheet 28 KB Posted
- Attached to
- DRYDOCK FOR CGC SKIPJACK AND CGC MANTA
- Solicitation number
- HSCG80-13-R-P45033
About this file
SCHEDULE OF SUPPLIES / SERVICES FOR SKIPJACK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REV_CGC_SKIPJACK_SCHEDULE_OF_SUPPLIES__SERVICES_DATED_11_19_12.xls | XLS spreadsheet | |
| SF30_Amendment_03_CGC_Skipjack.pdf | ||
| MANTA_(WPB_87)_DD_1300_REV1_092712.doc | DOC document | |
| HSCG8013RP45033_A0001.pdf | ||
| MANTA_SCHEDULE_OF_SUPPLIES_ _SERVICES.xls | XLS spreadsheet | |
| SPEC_FOR_SKIPJACK_08_28_2012_REV0.doc | DOC document | |
| SOLICITATION_for_CGC_SKIPJACK_AND_MANTA.doc | DOC document | |
| SPEC_FOR_MANTA_08_15_12__REV0.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| 15 AUG 2012 REV 0 GOVERNMENT ESTIMATE FOR SKIPJACK: | ||||||||
| USCGC SKIPJACK (WPB-87353) DRYDOCK AVAILABILITY 2013 | ||||||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE | AFC 30 | AFC 42 | AFC 45 |
| D-001 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS (D) | JB | 1 | $0 | $0 | $0 | $0 | |
| O-002 | PERFORM ULTRASONIC THICKNESS MEASUREMENTS (O) | 25 SHOTS | 10 | $0 | ||||
| D-003 | DIRTY OIL TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-004 | OILY WATER TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-005 | TANKS (MP FUEL SERVICE), CLEAN & INSPECT (D) | JB | 1 | $0 | ||||
| D-006 | PILOTOUSE DECK (ALUM.), INSPECT, PRESERVE, & RENEW ELECTRICAL MATTING (D) | JB | 1 | $0 | ||||
| O-007 | DEPTH SOUNDER, CAPASTIC FAIRING, RENEW (O) | JB | 1 | $0 | ||||
| O-008 | MAIN ENGINE/REDUCTION GEAR, REALIGN (O) | JB | 1 | $0 | ||||
| D-009 | PROPULSION SHAFTS, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| O-010 | PROPULSION SHAFT, REPAIR (O) | JB | 1 | $0 | ||||
| O-011 | PROPULSION SHAFT, STRAIGHTEN (O) | JB | 1 | $0 | ||||
| O-012 | AFT WATER-LUBRICATED SHAFT BEARING, RENEW (O) | JB | 1 | $0 | ||||
| O-013 | INTERMEDIATE BEARINGS CARRIER, RENEW (O) | JB | 1 | $0 | ||||
| O-014 | AFT BEARING CARRIER, RENEW (O) | JB | 1 | $0 | ||||
| O-015 | STERN TUBES, INTERIOR SURFACES, PRESERVE 100% (O) | JB | 1 | $0 | ||||
| O-016 | STERN TUBES, INTERIOR SURFACES, REPAIR (O) | JB | 1 | $0 | ||||
| D-017 | PROPELLERS, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| O-018 | PROPELLER, MINOR RECONDITIONING AND REPAIR, PERFORM (O) | JB | 1 | $0 | ||||
| D-019 | FATHOMETER TRANSDUCER, RENEW (D) | JB | 1 | $0 | ||||
| D-020 | SPEED LOG, TRANSDUCER AND SKIN VALVE, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-021 | SEA WATER (VALVES, STRAINERS, PIPING), CLEAN, INSPECT, AND REPAIR (D) | JB | 1 | $0 | ||||
| D-022 | RUDDER ASSEMBLIES, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| D-023 | RHIB NOTCH SKID PADS, INSPECT (D) | JB | 1 | $0 | ||||
| O-024 | RHIB NOTCH SKID PADS STUDS, RENEW (O) | 10 STUDS | 5 | $0 | ||||
| D-025 | STERN LAUNCH DOOR, REMOVE, INSPECT, AND REINSTALL (D) | JB | 1 | $0 | ||||
| D-026 | GREY WATER HOLDING TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-027 | SEWAGE HOLDING TANK, CLEAN AND INSPECT (D) | JB | 1 | $0 | ||||
| D-028 | GREY WATER PIPING, CLEAN AND FLUSH (D) | JB | 1 | $0 | ||||
| D-029 | SEWAGE PIPING, CLEAN AND FLUSH (D) | JB | 1 | $0 | ||||
| D-030 | JOINER BULKHEAD PANELS, RENEW (D) | JB | 1 | $0 | ||||
| D-031 | TANKS ( DIRTY OIL AND WASTE), PRESERVE “100%” (D) | JB | 1 | $0 | ||||
| O-032 | U/W BODY, PRESERVE ("100%")(O) | JB | 1 | $0 | ||||
| D-033 | CATHODIC PROTECTION/ZINCS, RENEW (D) | JB | 1 | $0 | ||||
| D-034 | DRYDOCKING (D) | JB | 1 | $0 | ||||
| D-035 | TEMPORARY SERVICES, PROVIDE (D) | JB | 1 | $0 | ||||
| D-036 | TELEPHONE SERVICE, PROVIDE (D) | JB | 1 | $0 | ||||
| O-037 | INTERMEDIATE WATER-LUBRICATED SHAFT BEARINGS, RENEW (O) | JB | 1 | $0 | ||||
| D-038 | INSTALL STAINLESS STEEL HULL INSERTS AND RENEW BMDE CONCENTRIC RINGS (D) | JB | 1 | $0 | ||||
| D-039 | HULL PLATING FREEBOARD, PRESERVE 100 % (D) | JB | 1 | |||||
| D-040 | INTERIOR DECK COVERING SYSTEM AND JOINER DECK, RENEW (D) | JB | 1 | |||||
| D-041 | MAST, PRESERVE (D) | JB | 1 | |||||
| D-042 | ANCHOR WINDLASS FOUNDATION, PRESERVE (D) | JB | 1 | |||||
| D-043 | DECKS-EXTERIOR (SLIP RESISTANT SHEETS) RENEW (D) | JB | 1 | |||||
| O-A | Composite Labor Rate | Hour | 460 | $ - 0 | ||||
| D-B | GFP Report | NSP | EA | 1 | NSP | |||
| O-Z | Laydays | Day | 5 | $ - 0 | ||||
| Total Price of Definite Items | $ - 0 | |||||||
| Total Price of Option Items | ||||||||
| Total Price of Definite and Optional Items |
Sheet3
File details come from the government source that posted it. Updated .