About this file

SCHEDULE OF SUPPLIES/SERVICES FOR USCGC YELLOWFIN

Text of this file

SOS&S

USCGC YELLOWFIN (WPB-87319) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1$0
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10$0
D-003Modify and Preserve the Forepeak (EC 087-A-033)JOB1$0
D-004Bilge Surfaces (Engine Room), Preserve (“Partial”)(D)JOB1$0
D-005Dirty Oil Tank, Clean and InspectJOB1$0
D-006Oily Water Tank, Clean and InspectJOB1$0
D-007Tanks (MP Fuel Service), Clean and InspectJOB1$0
D-008Decks – Exterior (Main Deck), PreserveJOB1$0
D-009Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1$0
O-010Depth Sounder, Capastic Fairing, RenewJOB1$0
D-011Mast, Preserve (“100%”)JOB1$0
O-012Main Engine/Reduction Gear, RealignJOB1$0
D-013Propulsion Shafts, Remove, Inspect, and ReinstallJOB1$0
O-014Propulsion Shaft, RepairEA2$0
O-015Propulsion Shaft, StraightenEA2$0
O-016Intermediate Water-Lubricated Shaft Bearing, RenewEA2$0
O-017Aft Water-Lubricated Shaft Bearing, RenewEA2$0
O-018Intermediate Bearing Carrier, RenewEA2$0
O-019Aft Bearing Carrier, RenewEA2$0
O-020Stern Tubes, Interior Surfaces, Preserve 100%JOB1$0
O-021Stern Tubes, Interior Surfaces, RepairJOB1$0
D-022Propellers, Remove, Inspect, and ReinstallJOB1$0
O-023Propeller, Minor Repair and Recondition, PerformEA2$0
O-024Ships Service Diesel Generator Assembly, Port and Stbd, Renew (O)JOB1$0
D-025Fathometer Transducer, RenewJOB1$0
D-026Speed Log, Transducer and Skin Valve, Clean and InspectJOB1$0
D-027HVAC System, Ducting, Clean (D)JOB1$0
D-028Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB1$0
D-029Fire Station “Camelback” Racks, Modify (TCTO TB3000)JOB1$0
D-030Rudder Assemblies, Remove, Inspect, and ReinstallJOB1$0
D-031Mooring Bits, Renew (EC 087-B-037) (D)JOB1$0
D-032RHIB Notch Skid Pads, InspectJOB1$0
O-033RHIB Notch Skid Pad Studs, RenewStuds10$0
D-034Stern Launch Door, Remove, Inspect, and ReinstallJOB1$0
D-035Grey Water Holding Tank, Clean and InspectJOB1$0
D-036Sewage Holding Tank, Clean and InspectJOB1$0
D-037Grey Water Piping, Clean and FlushJOB1$0
D-038Sewage Piping, Clean and FlushJOB1$0
O-039U/W Body, Preserve (“100%”)JOB1$0
O-040U/W Body, Preserve (“Partial-33%”)JOB1NSP
D-041Hull Plating Freeboard, Preserve (100% ) (D)JOB1$0
D-042Cathodic Protection / Zincs, RenewJOB1$0
D-043DrydockingJOB1$0
D-044Temporary Services, ProvideJOB1$0
D-045Telephone Service, ProvideJOB1$0
D-046Floodlights and Floodlight Mounts, Renew(D)JOB1$0
D-047Window(s), Renew (D)JOB1$0
A-OComposite Labor RateHour350
B-DGFP ReportNSPEA1NSP
Z-OLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(8/18/2011) Rev-0 - Page &P of &N

Sheet1

Other files

File Type Posted
A0003 REEF SHARK CORRECTIONS 11-10-11.doc.pdf PDF
SF300003 DB RS YF Multi Ship DD.doc DOC document
SF300002 DB RS YF Multi Ship DD.doc DOC document
Copy of DIAMOND BACK —
SF300001 DB RS YF Multi Ship DD.doc.rtf RTF text file
Three —
DIAMOND BACK —
Reef_Shark_Blank_ R0.xls XLS spreadsheet
YELLOWFIN —
DIAMOND BACK —
REEF SHARK —
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .