About this file

Schedule of Supplies/Services for USCGC DIAMONBACK (WPB-87370).

Text of this file

SOS&S

PRICING SCHEDULE FOR:
USCGC DIAMOND BACK (WPB-87) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1$0.00
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10$0.00
D-003Modify and Preserve the Forepeak (EC 087-A-033)JOB1$0.00
D-004Dirty Oil Tank, Clean and InspectJOB1$0.00
D-005Oily Water Tank, Clean and InspectJOB1$0.00
D-006Tanks (MP Fuel Service), Clean and InspectJOB1$0.00
D-007Decks – Exterior (Main Deck), PreserveJOB1
D-008Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1$0.00
O-009Depth Sounder, Capastic Fairing, RenewJOB1$0.00
O-010Main Engine/Reduction Gear, RealignEA2$0.00
D-011Propulsion Shafts, Remove, Inspect, and ReinstallEA2$0.00
O-012Propulsion Shaft, RepairEA2$0.00
O-013Propulsion Shaft, StraightenEA2$0.00
O-014Intermediate Water-Lubricated Shaft Bearing, RenewEA2$0.00
O-015Aft Water-Lubricated Shaft Bearing, RenewEA2$0.00
O-016Intermediate Bearing Carrier, RenewEA2$0.00
O-017Aft Bearing Carrier, RenewEA2$0.00
O-018Stern Tubes, Interior Surfaces, Preserve 100%EA2$0.00
O-019Stern Tubes, Interior Surfaces, RepairEA2$0.00
D-020Propellers, Remove, Inspect, and ReinstallEA2$0.00
O-021Propeller, Minor Repair and Recondition, PerformEA2$0.00
D-022Fathometer Transducer, RenewJOB1$0.00
D-023Speed Log, Transducer and Skin Valve, Clean and InspectJOB1$0.00
D-024Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB1$0.00
D-025Rudder Assemblies, Remove, Inspect, and ReinstallEA2$0.00
D-026RHIB Notch Skid Pads, InspectJOB1$0.00
O-027RHIB Notch Skid Pad Studs, RenewSTUDS5$0.00
D-028Stern Launch Door, Remove, Inspect, and ReinstallJOB1$0.00
D-029Grey Water Holding Tank, Clean and InspectJOB1$0.00
D-030Sewage Holding Tank, Clean and InspectJOB1$0.00
D-031Grey Water Piping, Clean and FlushJOB1$0.00
D-032Sewage Piping, Clean and FlushJOB1$0.00
O-033U/W Body, Preserve (“Partial-33%”)JOB1$0.00
D-034Hull Plating Freeboard, Preserve (“100%”) (D)JOB1$0.00
D-035Cathodic Protection / Zincs, RenewJOB1$0.00
D-036DrydockingJOB1$0.00
D-037Temporary Services, ProvideJOB1$0.00
D-038Telephone Service, ProvideJOB1$0.00
D-039Dirty Oil Tank TLI System, Install (TCTO TE7000.0)JOB1$0.00
D-040Weather Tight Door, Fuel Station, Install (TCTO TB6000)JOB1$0.00
D-041Fire Station “Camelback” Racks, Modify (TCTO TB3000)JOB1$0.00
D-042AFFF Bilge Piping System, Install (EC 087-A-24)JOB1$0.00
O-00AComposite Labor RateHour380$0.00
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$500.00JOB$0.00
O-00ZLaydaysDay5
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(8/11/2011) Rev-0 - Page &P of &N

CostEstimateTemplate

Other files

File Type Posted
A0003 REEF SHARK CORRECTIONS 11-10-11.doc.pdf PDF
SF300003 DB RS YF Multi Ship DD.doc DOC document
SF300002 DB RS YF Multi Ship DD.doc DOC document
SF300001 DB RS YF Multi Ship DD.doc.rtf RTF text file
Three —
DIAMOND BACK —
Reef_Shark_Blank_ R0.xls XLS spreadsheet
YELLOWFIN —
YELLOWFIN —
DIAMOND BACK —
REEF SHARK —
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .