Reef_Shark_Blank_ R0.xls

XLS spreadsheet 37 KB Posted

Attached to
Drydock Repairs to the USCGC DIAMONDBACK (WPB-87370), USCGC REEF SHARK (WPB-87371) and USCGC YELLOWFIN (WPB-87319)
Solicitation number
HSCG80-12-Q-P45H76
Issued by

About this file

SCHEDULE OF SUPPLIES/SERVICES FOR USCGC REEF SHARK

View the file

Other files

File Type Posted
A0003 REEF SHARK CORRECTIONS 11-10-11.doc.pdf PDF
SF300003 DB RS YF Multi Ship DD.doc DOC document
SF300002 DB RS YF Multi Ship DD.doc DOC document
Copy of DIAMOND BACK —
SF300001 DB RS YF Multi Ship DD.doc.rtf RTF text file
Three —
DIAMOND BACK —
YELLOWFIN —
YELLOWFIN —
DIAMOND BACK —
REEF SHARK —
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

USCGC REEF SHARK (WPB-87371) DRYDOCK AVAILABILITY 2012
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Perform Ultrasonic Thickness Measurements250 SHOTS1$0
O-002Perform Ultrasonic Thickness Measurements25 SHOTS10$0
O-003Hull and Structural Plating-3/16" Steel Plate, Repair (O)JOB1$0
D-004Forepeak, Modify (EC 087-A-033)JOB1$0
D-005Galley/Messdeck Bilge Access , InspectJOB1$0
D-006Dirty Oil Tank, Clean and InspectJOB1$0
D-007Oily Water Tank, Clean and InspectJOB1$0
D-008Tanks (MP Fuel Service), Clean and InspectJOB1$0
D-009Superstructure, Preserve (“100%”) (D)JOB1$0
D-010Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical MattingJOB1$0
O-011Depth Sounder, Capastic Fairing, RenewJOB1$0
D-012Joiner Bulkhead Panels, Renew (D)JOB1$0
D-013Hatch Coaming s , Renew (EC 087-A-027) (D)JOB1$0
D-014Mast, Preserve (“100%”) (D)JOB1$0
O-015Main Engine/Reduction Gear, RealignEA2$0
D-016Propulsion Shafts, Remove, Inspect, and ReinstallJOB1$0
O-017Propulsion Shaft, RepairEA2$0
O-018Propulsion Shaft, StraightenEA2$0
O-019Intermediate Water-Lubricated Shaft Bearing, RenewEA2$0
O-020Aft Water-Lubricated Shaft Bearing, RenewEA2$0
O-021Intermediate Bearing Carrier, RenewEA2$0
O-022Aft Bearing Carrier, RenewEA2$0
O-023Stern Tubes, Interior Surfaces, Preserve 100%JOB1$0
O-024Stern Tubes, Interior Surfaces, RepairJOB1$0
D-025Propellers, Remove, Inspect, and ReinstallEA2$0
O-026Propeller, Minor Repair and Recondition, PerformEA2$0
D-027Fathometer Transducer, RenewJOB1$0
D-028Speed Log, Transducer and Skin Valve, Clean and InspectJOB1NSP
D-029HVAC Intake System, Renew (D)JOB1$0
D-030Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, clean and Inspect, PreserveJOB1$0
D-031Sea Water System (Valves, Strainers, Piping), Clean, Inspect, and RepairJOB1$0
D-032Raw Water Piping, Repair (D)JOB1$0
D-033Rudder Assemblies, Remove, Inspect, and ReinstallJOB1$0
D-034RHIB Notch Skid Pads, InspectJOB1$0
O-035RHIB Notch Skid Pad Studs, RenewSTUDS5
D-036Stern Launch Door, Remove, Inspect, and ReinstallJOB1
D-037Grey Water Holding Tank, Clean and InspectJOB1
D-038Sewage Holding Tank, Clean and InspectJOB1
D-039Grey Water Piping, Clean and FlushJOB1
D-040Sewage Piping, Clean and FlushJOB1
D-041U/W Body, Preserve (“100%”)JOB1
O-042U/W Body, Preserve (“Partial-33%”)JOB1
D-043Hull Plating Freeboard, Preserve (“Partial”) (D)JOB1
D-044Cathodic Protection / Zincs, RenewJOB1
D-045Cathodic Protection / Zincs, Install (D)JOB1
D-046Interior Deck Covering System, Renew (D)JOB1
D-047Interior Deck Covering System, Reseal (D)JOB1
D-048Interior Deck Covering System and Joiner Deck, RenewJOB1
D-049DrydockingJOB1
D-050Temporary Services, ProvideJOB1
D-051Telephone Service, ProvideJOB1
O-AComposite Labor RateHour440$0
D-BGFP ReportNSPEA1NSP
O-ZLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

Sheet2

Sheet3

File details come from the government source that posted it. Updated .