Specification for Dry Dock Repairs 2011 12 JAN 2011 / Rev 0

View the file

Other files

File Type Posted
A0002-SF30-SEA OTTER PIKE.pdf PDF
Schedule of Supplies Services - Revision 2.docx DOCX document
87-WPB_243_1_7_-_H.pdf PDF
A0001-SF30-SEA OTTER PIKE.pdf PDF
Clarifications Responses.pdf PDF
87-WPB_243_1_5_-_M.pdf PDF
87-WPB_243_1_1_-_M.pdf PDF
87-WPB_243_1_6_-_M.pdf PDF
Revised Schedule of Supplies Services.docx DOCX document
HSCG80-11-Q-P45U84.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC SEA OTTER (WPB 87362) & USCGC PIKE (WPB 87365)

87 FOOT COASTAL PATROL BOAT (USCG)

SPECIFICATION FOR DRYDOCK REPAIRS

Developed By: Jennifer L Smith, MKCS

(Rev 0, 12 January 2011)

USCGC SEA OTTER (WPB-87362) & USCGC PIKE (WPB 87365) DRYDOCK AVAILABILITY

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ....................................................................................................................................... iv Consolidated List of References ................................................................................................................. v Consolidated List of Government-furnished Property............................................................................... ix Consolidated List of Critical Inspection Items .......................................................................................... xi Principal Characteristics ........................................................................................................................... xii General Requirements WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D) WORK ITEM 2: Perform Ultrasonic Thickness Measurements (O) WORK ITEM 3: Hull and Structural Plating-3/16" Steel Plate , Repair (D) PIKE ONLY WORK ITEM 4: Forepeak, Modify (EC 087-A-033) (D) WORK ITEM 5: Dirty Oil Tank, Clean and Inspect (D) WORK ITEM 6: Oily Water Tank, Clean and Inspect (D) WORK ITEM 7: Tanks (MP Fuel Service), Clean and Inspect (D) WORK ITEM 8: Tanks (Potable Water), Clean and Inspect (D) WORK ITEM 9: Pilothouse Deck (Aluminum), Inspect, Preserve, and Renew Electrical Matting (D) . 35 WORK ITEM 10: Depth Sounder, Capastic Fairing, Renew (O) WORK ITEM 11: Main Engine/Reduction Gear, Realign (O) WORK ITEM 12: Propulsion Shafts, Remove, Inspect, and Reinstall (D) WORK ITEM 13: Propulsion Shaft, Repair (O) WORK ITEM 14: Propulsion Shaft, Straighten (O) WORK ITEM 15: Intermediate Water-Lubricated Propulsion Shaft Bearing , Renew (O) WORK ITEM 16: Aft Water-Lubricated Propulsion Shaft Bearing , Renew (O) WORK ITEM 17: Intermediate Bearing Carrier, Renew (O) WORK ITEM 18: Aft Bearing Carrier, Renew (O) WORK ITEM 19: Stern Tube, Interior Surfaces, Preserve 100% (O) WORK ITEM 20: Stern Tube, Interior Surfaces, Repair (O) WORK ITEM 21: Propellers, Remove, Inspect and Reinstall (D) WORK ITEM 22: Propeller, Minor Reconditioning and Repairs, Perform (O) WORK ITEM 23: Main Diesel Engine Concentric Ring, Renew (O) WORK ITEM 24: Fathometer Transducer, Renew (D) WORK ITEM 25: Speed Log, Skin Valve Assembly, Clean and Inspect (D) WORK ITEM 26: Sea Water System (Sea Valves, Strainers, Piping), Clean, Inspect and Repair (D) ... 79 WORK ITEM 27: Rudder Assemblies, Remove, Inspect and Reinstall (D) WORK ITEM 28: RHIB Notch Skid Pads, Inspect (D) WORK ITEM 29: RHIB Notch Skid Pad Studs, Renew (O) WORK ITEM 30: Stern Launch Door, Remove, Inspect and Reinstall (D) WORK ITEM 31: Grey Water Holding Tank, Clean and Inspect (D) WORK ITEM 32: Sewage Holding Tank , Clean and Inspect (D) WORK ITEM 33: Grey Water Piping, Clean and Flush (D) WORK ITEM 34: Sewage Piping, Clean and Flush (D) WORK ITEM 35: U/W Body, Preserve-100% (O)

WORK ITEM 36: U/W Body, Preserve-Partial-33% (O) WORK ITEM 37: Hull Plating Freeboard, Preserve-100% (D) PIKE ONLY WORK ITEM 38: Hull Plating Freeboard, Preserve-Partial (D) SEA OTTER ONLY WORK ITEM 39: Superstructure, Preserve-100% (D) WORK ITEM 40: Main Mast , Preserve (D) PIKE ONLY WORK ITEM 41: Main Mast , Preserve (O) SEA OTTER ONLY WORK ITEM 42: Cathodic Protection / Zincs, Renew (D) WORK ITEM 43: Drydocking (D) WORK ITEM 44: Temporary Services, Provide (D) WORK ITEM 45: Telephone Service, Provide (D) WORK ITEM 46: Install Dirty Oil Tank Level Indicator (EC 087-B-039) (D) WORK ITEM 47: Hatch Coamings, Renew (EC 087-A-027) (D) SEA OTTER ONLY WORK ITEM 48: Ventilation Systems, Commercial Cleaning (D) WORK ITEM 49: Sea Valves and Waster Pieces, Renew (D) PIKE ONLY WORK ITEM 50: Decks–Exterior, Prepare, Coat and Install Slip-Resistant Sheets (D) SEA OTTER

ONLY

WORK ITEM 51: Deck Covering (Wet/Dry), Seal (D) WORK ITEM 52: Renew Mast Cable Standoffs (D) SEA OTTER ONLY WORK ITEM 53: Renew Sea Chest Strainer Plate (D) SEA OTTER ONLY WORK ITEM 54: Hull and Structural Plating-3/16" Steel Plate , Repair (O) iii (Rev-0) iv (Rev-0)

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free or charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 085-001, Rev -, Tank Capacity - 95% Curves Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan Coast Guard Drawing 87 WPB 085-011, Rev B, Lifting Slings Coast Guard Drawing 87 WPB 085-012, Rev -, Lifting Cradle Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion Coast Guard Drawing 87 WPB 113-001, Rev E, Platform Plating & Framing Coast Guard Drawing 87 WPB 116-001, Rev -, Longitudinal Girders & Bhd’s Coast Guard Drawing 87 WPB 117-001, Rev F, Transverse Sections Coast Guard Drawing 87 WPB 122-001, Rev C, Watertight Bulkheads Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan Coast Guard Drawing 87 WPB 131-002, Rev -, Forepeak Void New Watertight Flat Coast Guard Drawing 87 WPB 151-001, Rev M, Superstructure Details Coast Guard Drawing 87 WPB 161-001, Rev C, Skeg Construction Coast Guard Drawing 87 WPB 163-001, Rev G, Sea Chest Details Coast Guard Drawing 87 WPB 165-001, Rev D, Transducer Details Coast Guard Drawing 87 WPB 167-002, Rev A, CG Schedule Of Doors, Manholes, Windows & Hatches Coast Guard Drawing 87 WPB 171-001, Rev L, Mast Details Coast Guard Drawing 87 WPB 182-001, Rev A, Main Engine and Generator Foundations Coast Guard Drawing 87 WPB 243-001, Rev M, Propulsion Shaft Details Coast Guard Drawing 87 WPB 245-002, Rev -, Propeller Details Coast Guard Drawing 87 WPB 245-003, Rev A, Propeller Details Coast Guard Drawing 87 WPB 252-001, Rev D, Pilothouse Console Arrangement Coast Guard Drawing 87 WPB 252-002, Rev K, Alarm Monitoring System v (Rev-0) http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace

Coast Guard Drawing 87 WPB 256-001, Rev U, Sea Water Cooling Piping Coast Guard Drawing 87 WPB 259-001, Rev C, Engine Exhaust Piping Coast Guard Drawing 87 WPB 302-001, Rev P, Misc. Controls Wiring Diagram Coast Guard Drawing 87 WPB 304-001, Rev C, Wireways Arrangement Coast Guard Drawing 87 WPB 423-001, Rev T, Speed Log & Depth Sounder System Coast Guard Drawing 87 WPB 437-004, Rev C, Dirty Oil Tank Level Indication System Coast Guard Drawing 87 WPB 506-002, Rev E, Vent Fills and Sounds Piping Coast Guard Drawing 87 WPB 514-001, Rev M, HVAC Duct & Piping System Coast Guard Drawing 87 WPB 526-001, Rev H, Scuppers & Deck Drains Piping Coast Guard Drawing 87 WPB 529-001, Rev F, Bilge Piping Coast Guard Drawing 87 WPB 561-001, Rev H, Steering System Details Coast Guard Drawing 87 WPB 562-001, Rev A, Rudder Details Coast Guard Drawing 87 WPB 581-001, Rev F, Anchor Handling & Hawse Pipe Details Coast Guard Drawing 87 WPB 583-001, Rev P, RIB Deployment Structure Coast Guard Drawing 87 WPB 593-001, Rev K, Sewage Piping Coast Guard Drawing 87 WPB 601-001, Rev G, Outboard Profile and General Arrangement Coast Guard Drawing 87 WPB 631-001, Rev M, Ship’s Painting Schedule Coast Guard Drawing 87 WPB 634-001, Rev C, Deck Coverings and Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details Coast Guard Fleet Drawing FL 2804-11, Rev D, Visual ID Numeral & Letter for Ships Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-13, Rev G, Visual ID Kit Sched Coast Guard Fleet Drawing FL 2804-15, Rev -, Draft Figs

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Change 1, Jun 2006, Coatings and Color Manual Coast Guard Technical Publication (TP) 4506, Wartsila TM-EL-68839, Issue A, Mar 2005, Rudderstock Seal Type EL Coast Guard Technical Publication (TP) 4563A, Mar 2003, SWBS 651, Exhaust Hood System Coast Guard Technical Publication (TP) 4563D, Sep 2009 , SWBS 651, Exhaust Hood System Water-Wash Ventilators-Series CG & RG Coast Guard Technical Publication (TP) 4593B, Mar 2003, SWBS 562, Rudderstock Seal-Type EJ Coast Guard Technical Publication (TP) 4593C, Feb 2002, SWBS 243, Manufacturer's Instruction Book, 87' WPB Propulsion Shaft Seals, John Crane Type F.S.E.

Coast Guard Technical Publication (TP) E-424-0230, SWBS 424, June 2006, Electromagnetic Log User’s Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), Jan 2009, Clean Shipboard Ventilation Systems Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), Jan 2009, Install Interior Deck Covering Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), Jan 2009, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), Jan 2009, Provide Temporary Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses vi (Rev-0)

OTHER REFERENCES

American Bureau of Shipping (ABS), 2, Rules for Survey After Construction, 2008, Part 7, Appendix Section 10, Guide for Bronze and Stainless Steel Propeller Castings American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and Welding End ASTM International (ASTM) D 4138, 2007, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component Adhesives (An) ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual Ultrasonic Pulse-Echo Contact Method ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates ASTM International (ASTM), D3951, Re-approved 2004, Standard Practice for Commercial Packaging Bollinger Shipyard, USCG CPB Project MTU-FA 771903, 07 Feb 2000, Engine/Gearbox Plant Alignment Instructions 8V396 TE94/Flange mounted BW 255 Bollinger Shipyards Drawing D97-0829, Rev J, Installation Drawing, 87’ USCG CPB/MTU 8V396TE94 Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Antiseize, Zinc Dust- Petrolatum Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems Federal Specification (Fed Spec) QQ-N-281, Oct 1985, Nickel-Copper Alloy Bar, Rod, Plate, Sheet, Strip, Wire, Forgings, and Structural and Special Shaped Sections Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement International Organization for Standardization (ISO), 484/2, First Edition, 1981, Shipbuilding - Ship Screw Propeller - Manufacturing tolerances - Part 2: Propellers of diameter between 0.80 and 2.50 m inclusive Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic) MIL-D-3134, Sep 1989, Deck Covering Materials MIL-DTL-15562, May 1996, Matting or Sheet, Floor Covering Insulating for High Voltage requirements MIL-PRF-16173, Sep 2006, Corrosive Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-23236, Aug 2003, Coating Systems for Ship Structures MIL-PRF-24139, Mar 1987, Grease, Multipurpose, Water Resistant.

vii (Rev-0)

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-PRF-24635, Sep 2009, Coating Systems, Weather-Resistant, Exterior Use MIL-PRF-24647, Jun 2006, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-167-1, Nov 2005, Mechanical Vibrations of Shipboard Equipment (Type I - Environmental and Type II - Internally Excited) MIL-STD-1687, Sep 1994, Thermal Spray Processes For Naval Ship Machinery Application MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main Propulsion Shafting NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes Owners Manual for BG Series Bargraph Instruments Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2007, Cork and Rubber Composition Sheet; For Aromatic Fuel And Oil Resistant Gaskets The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2007, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 7/NACE No.4, 2007, Brush-Off Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2004, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No. SSPC-SP 12/NACE No.5, Surface Preparation and Cleaning of Steel & Other Hard Materials by High and Ultrahigh Pressure Water Jetting Prior to Recoating viii (Rev-0) ix (Rev-0)

Consolidated List of Government-furnished Property The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED

COST

($/UNIT)

11 Y Alignment Kit N/A 1 ea 5000.00 12 N **Propeller shaft NSN: 2010-01-458-9175 4 ea. 9,566.14

12 N Type FSE Face (split) PN: H75440-01-2-2 NSN: 5330-01-521-3559 4 ea. 1,995.07

12 N Type FSE Seal (split) PN: H75440-01-1-1 NSN: 2040-01-521-2654 4 ea. 4,070.35

12 N Type FSE Seal Cup (split)

PN: H75440-01-1-3

NSN: 3120-01-521-2390 4 ea. 188.24

12 N Type FSE O-Cord PN: H75440-01-1-4 NSN: 3120-01-521-2268 4 ea. 252.84

12 N Type FSE Emergency Seal

PN: H75440-01-3-6

NSN: 5330-01-521-4855 4 ea. 260.92

12 N **Shaft Seal Bellow PN: H75440-01-2-1 NSN: 5340-01-521-3573 4 ea. 270.45

12 N *Compression Tool Assembly N/A 1 ea. 200.00

12 N *Alignment Kit N/A 1 set 3,000.00

15 N

**Thordon bearing, Grade Orange

(5.5" OD x 4" ID x 7.87" (200mm) LG)

PN: F54615-02-8-1

NSN: 3120-21-914-2012 4 ea. 325.47

16 N

**Thordon bearing, Grade Orange

(5.5" OD x 4" ID x 11.41" (290mm) LG)

PN: F54615-02-8-0

NSN: 3120-21-914-2011 4 ea. 399.50

21 Y **Starboard Propeller

(RH)

PN: RH706-3350.00

NSN: 2010-01-457-0573 2 ea. 12,498.00

21 Y **Port Propeller (LH) PN: LH706-3350.00 NSN: 2010-01-459-0421 2 ea. 12,498.00

21 N *Propeller Nut Wrench N/A 1 ea 200.00 21 N **Propeller Nut NSN: 2010-01-458-9217 4 ea. 281.00

21 N **Propeller Nut, Locking NSN: 5310-01-458-9125 4 ea. 252.94

21 N Anode, Propeller Nut NSN: 5342-01-481-8403 4 ea. 272.00 23 N Concentric exhaust ring N/A 2 ea. 2,000.00 24 N Concentric exhaust ring N/A 2 ea. 2,000.00

25 N *** Fathometer transducer, shallow water, 50-200 kHz

NSN: 5845-01-531-2648 2 ea. 441.70

26 Y Doppler Speed Log Measurement Rod NSN: 6605-01-470-1266 2 ea. 4645.09

28 Y **Rudder Assembly, port NSN: 2040-01-461-1944 1 ea. 2,000.00

28 Y **Rudder Assembly, starboard NSN: 2040-01-461-1943 1 ea. 2,000.00

28 N Upper Roller Bearing NSN: 3110-01-512-5534 4 ea. 244.62 28 N Wartsila EL Seals Kit NSN: 2040-01-565-9776 4 ea. 6300.00 44 Y *Transducer Cover Plate N/A 1 ea. 50.00

47 N Flash ROM Assembly NSN: 6320-01-F09-1474 PN: 9702Z0030-1 2 ea 162.39

47 N Signal Conditioner NSN: 5895-01-470-5302 PN: 112300 2 ea 187.00

47 N Transmitter, Liquid, Quantity

NSN: 6680-01-537-6489

PN: 602120 2 ea 499.00

47 N Meter, Dirty Oil Tank NSN: 6320-01-F09-1473 PN: CDT4A00101 2 ea 826.00

48 N 24” x 24” QA Flush Hatch PN: 2424-H[K] (Freeman Marine) 1 ea. 3,566.50

51 N Slip Resistant Sheets N/A 1 kt 5,000.00 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter x (Rev-0) xi (Rev-0)

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000_STD, paragraph

3.2.6.5 (Inspection report particulars)):

Work Item Title 1 Perform Ultrasonic Thickness Measurements (D)

Forepeak, Modify (EC 087-A-33) (D) Pilothouse Deck (Aluminum), Inspect , Preserve, and Renew Electrical Matting (D)

12 Propulsion Shafts, Remove, Inspect, and Reinstall (D) 27 Sea Water System (Sea Valves , Strainers, Piping), Clean, Inspect, and Repair (D) 28 Rudder Assemblies, Remove, Inspect and Reinstall (D)

RHIB Notch Skid Pads, Inspect (D) Drydocking (D)

Principal Characteristics

87' WPB

PHYSICAL CHARACTERISTICS

Length Overall 87' Length between Perpendiculars 81' 7" Depth 10' 11" Maximum Beam 19.4' Draft, Mean to Design Waterline 5' 9" Height of Highest Projection 50.2' Full Load Displacement 93.5 long tons Minimum Operating Displacement 83.9 long tons Displacement, Light Ship 77.9 long tons Framing Longitudinal Bulkheads Four watertight bulkheads located below the Main Deck Anchor 40 lb Fortress with 480 ft. 3 strand 5/8" dia. Line stayset

HULL CHARACTERISTICS

Hull/Main Weatherdeck Material BS-4360, GR 43A Steel Superstructure 5086 Aluminum

MACHINERY CHARACTERISTICS

Main Propulsion Two MTU 8V396TE94, sequential turbo-charged diesels

Reduction Gears Two ZF Type BW 255 Propulsion Shaft Two AQUAMET 22, 101.6mm Shaft Diameter 4" Shaft Seal Two John Crane mechanical seals Shaft Bearing, Intermediate Thordon Elastomeric Bearing Shaft Bearing, Aft Thordon Elastomeric Bearing Number of Propellers 2 Number of Blades 5 Diameter of Propeller 1040mm Pitch 1230 mm fixed Shaft RPM 828 Rudders Two 316L Stainless Steel Ship's Service Generators Two Man Model D08241F01 diesel with Stanford

60KW Generator

TANK CAPACITIES

3-9-1-F (Fuel Oil) 1402 gal 3-9-2-F (Fuel Oil) 1402 gal 3-12-2-F (Waste Oil) 86 gal 3-12-1-F (Oily Water) 86 gal 3-7-0-Q (Sewage Collection) 352 gal 3-7-1-Q (Grey Water) 52 gal 3-12-1-W (Fresh Water) 200 gal 3-12-2-W (Fresh Water) 200 gal xii (Rev-0) xiii (Rev-0)

00000_PWB_1110_FLT

REC_0000_FLT_ Commercial Project @ Contractor’ Facility (0110)

General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

COAST GUARD DRAWINGS

None.

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface

Profile of Blast Cleaned Steel Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety

Administration, Department Of Transportation MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel

Surfaces Prepared by Dry Abrasive Blast Cleaning

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

1 (Rev-0)

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.4 HW disposal. The Contractor is considered as the generator of all contract-generated hazardous wastes and shall use its facility’s EPA generator ID number for management, transportation, and disposal of said hazardous wastes. Ensure the following:

3.4.1 Contractor’s hazardous waste handlers shall comply with applicable requirements of 40 CFR 262.

3.4.2 All contract generated hazardous wastes shall be packaged in 49 CFR-compliant containers.

3.4.3 The designated wastes shall be disposed of at a state or Federally-approved and permitted HW TSDF.

3.4.4 Name of destination TSDF shall be submitted to the KO at the Arrival Conference.

3.5 Pre-surface preparation test coupon. In order to ensure production of required surface profile, the Contractor shall accomplish the following, tasks, whenever abrasive-blasting is required in a work item that is deemed a ”critical-coated’ surfaces:

3.5.1 Coupon material and test set-up particulars.

3.5.1.1 Conduct a performance test on all abrasive blasting operations on a Contractor- provided test coupon, prior to starting abrasive blasting operations on the vessel. Ensure the following:

• The coupon shall be a new metal plate, of the same metal type and material properties as the vessel area to be blasted - steel or aluminum plate, as applicable, and shall have no existing anchor profile - other than the surface irregularities from the manufacturing process.

• The test coupon shall be flat, with nothing welded to the side used for the anchor profile test, no thinner than a 1/8-inch plate and measuring no smaller than 1-foot by 1-foot.

• For steel substrates, the coupon shall have the mill scale intact, and be in a Rust Grade "A" condition, in accordance with SSPC-VIS 1.

• The test coupon shall be affixed so as to not permit excessive movement during the performance test, but shall not be affixed to the vessel.

3.5.1.2 Ensure that the abrasive-blasting operation for the test coupon is conducted with the identical setup and parameters that will be used blasting the designated vessel surfaces – including, but not limited to:

• The abrasive media type and media size selected to achieve the anchor profile range, as specified in the applicable work items.

• Nozzle size and type (straight bore, high velocity nozzle, angle nozzle...).

• Delivery rate and pressure settings.

3.5.1.3 Blast a one-square foot area on one side of the test coupon to the abrasive surface preparation standard specified in the work item, and perform an anchor profile test of the blasted surface in accordance with ASTM

2 (Rev-0)

D4417, Method B or C. Notify the COTR in advance of the abrasive blasting operation test, to permit the witnessing of the test by the COTR. Submit a CFR documenting the results of the abrasive blasting operation test. The CFR shall include at a minimum, the following:

• Area of the vessel for which the verified setup will be used to abrasive blast.

• The selected abrasive media type and size.

• The nozzle size and type.

• The delivery rate and pressure.

• The test coupon starting properties (material type and surface conditions).

• The resultant anchor profile readings from the test (a minimum of 3 locations, separated by a minimum of

2 inches shall be recorded).

NOTES

1. A performance test of the abrasive blasting operations on a test coupon and measuring the resultant anchor profile prior to performing the abrasive blasting operation on the cutter is required. The test coupon will be used to evaluate the anchor profile produced by the equipment setup and selected abrasive media.

2. The reverse side of the test coupon may be used for the subsequent test, provided that the conditions in paragraph 3.5.1 (Coupon material and test set-up particulars) are met.

3. Ultra high pressure water jetting does not create an anchor profile and is exempt from the anchor profile test coupon check.

3.5.1.4 Repeat the abrasive blasting operation test in the following instances:

• The equipment setup, that was evaluated during the test coupon abrasive blasting performance test in paragraph 3.5.1 (Coupon material and test set-up particulars), has changed.

• The resultant anchor profile readings observed on the vessel are outside the specified anchor profile range.

• Media is changed from MIL-A-22262 to CID A-A-59316 or vice versa.

• The supplier of the abrasive blasting media changes, regardless if the new source for the media has the same specifications.

• When Directed by the COTR.

CAUTION!

Ensure that blast media from the performance test does not strike the vessel during the test.

4. NOTES

4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may be accessed at the following URL address: http://www.uscg.mil/directives/cim.asp

4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

3 (Rev-0) http://www.uscg.mil/directives/cim.asp

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: _______________________________ Area Being Preserved: ___________________________________

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000 sqft area (maximum threshold: 70 microsiemens/cm ,for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application:_________/_________; Return to service or removal from environment controls: _______/_______

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

4 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)

TEMPERATURE

DATE &

TIME

ENTER ACTIVITY

(Surface preparation, primer coat, barrier coat, top coat, etc…)

LOCATION

DEW

POINT SURFACE AMBIENT ΔT

DP - Surface

% REL.

HUMIDITY

SIGNATURE

OF

INSPECTOR

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

5 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: __________________________________________________________________

PROFILE

(mils) SURFACE PREPARATION METHOD

Min Max Avg.

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________ Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record. Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

6 (Rev-0)

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

7 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________ Location of Surface Profile Measurements: __________________________________________________________________

PROFILE

(mils) SURFACE PREPARATION METHOD

Min Max Avg.

SSPC-SP-10/NACE No. 2 SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Reading: __________ mils __________ mils __________ mils __________ mils mils

Reading: __________ mils __________ mils __________ mils __________ mils mils

Reading: __________ mils __________ mils __________ mils __________ mils mils Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings:

By Column: __________ mils __________ mils __________ mils __________ mils mils

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

8 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

Location of Work (including frame numbers): _______________________________________ Area (square feet): ____________

SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15

DATE TEST LOCATIONS CONDUCTIVITY

(microsiemens/cm)

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

9 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence) Vessel Name: _______________________ Hull Number: ______________ CLIN No.: _____________ Work Item Title: ________________________________________________

Coating Manufacturer: ___________________Product Name: _______________________Batch Number: ____________ Induction Time: _______________________________________________________________ Coating System Sequence (Indicate Whether: Primer, Touch-Up Primer, Barrier Coat, 3rd Coat…): _______________________

DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL

READING (BMR)

*Required, If Magnetic Pull-Of (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5 ADJUSTMENTS

1 Avg. BMR Deviation

Overall Avg. DFT

3 Before

Adjustments After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5 ADJUSTMENTS

After Adjustments

Avg.

Location (Frame Reference): ___________________

SPOT 1 2 3 4 5 ADJUSTMENTS

After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled):____________________ Average DFT: __________________________________________________________

Name of QP-1 or NACE-Certified Inspector: __________________________________________ Cert. No.: ____________ Signature of Inspector: _______________________________________ Date:_______________ Time: _________

10 (Rev-0)

11 (Rev-0)

11000 _JLW_1210_87WPB

WORK ITEM 1: Perform Ultrasonic Thickness Measurements (D)

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform up to 250 thickness measurements (UT shots) of hull plating and frames, by ultrasonic methods.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion

COAST GUARD PUBLICATIONS

None.

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

• 3.2 (UT measurements).

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures.

Not applicable.

3.1.4 Interferences.

3.1.4.1 If UT measurements cannot be obtained due to interferences, the Contractor shall submit a CFR that details all necessary interference removal/reinstallation work. After the KO has released a CR, remove the interferences and reinstall after completion of associated work.

3.2 UT measurements. The Contractor shall perform up to 250 UT measurements in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Create a sketch to show all locations selected for measurement and record all measurements in Table 1 (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CIR that contains the sketch and completed Table I.

4. NOTES

This section is not applicable to this work item.

12 (Rev-0)

TABLE I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL

SHOT # STRAKE # FWD/MID/AFT ORIG PL MEASURED PL PERCENT

PLATE # TOP/MID/BOT THICKNESS THICKNESS WASTAGE

13 (Rev-0)

14 (Rev-0)

11001 _JLW_1210_87WPB

WORK ITEM 2: Perform Ultrasonic Thickness Measurements (O)

1.1 Intent. This work item describes the requirements for the Contractor to perform up to 250 thickness measurements (UT shots) of hull plating and frames, by ultrasonic methods, in 10 lots of 25 measurements.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 085-010, Rev D, Docking Plan Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion

COAST GUARD PUBLICATIONS

None.

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

Not applicable.

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures.

3.1.4.1 If UT measurements cannot be obtained due to interferences, the Contractor shall submit a CFR that details all necessary interference removal/reinstallation work. After the KO has released a CR, remove the interferences and reinstall after completion of associated work.

3.2 UT measurements. The Contractor shall perform up to 250 UT measurements in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C. Create a sketch to show all locations selected for measurement and record all measurements in Table 1 (UT Measurements Summary Sheet - Port/Stbd Shell) provided at the end of this item. Submit a CFR that contains the sketch and completed Table I.

4. NOTES

15 (Rev-0)

TABLE I - UT MEASUREMENTS SUMMARY SHEET PORT/STBD SHELL

SHOT # STRAKE # FWD/MID/AFT ORIG PL MEASURED PL PERCENT

PLATE # TOP/MID/BOT THICKNESS THICKNESS WASTAGE

16 (Rev-0)

17 (Rev-0)

11100_3/16”SteelPlate_0210_FLT REC_11100_Steel_FLT_87' WPB (ALL)(0210)

WORK ITEM 3: Hull and Structural Plating-3/16" Steel Plate , Repair (D)

PIKE ONLY

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to renew 3/16" hull plating in engine room (2-14-0-E) between approximately frames 19 & 20 and longitudinal 15.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion Coast Guard Drawing 87 WPB 113-001, Rev E, Platform Plating & Framing Coast Guard Drawing 87 WPB 116-001, Rev - , Longitudinal Girders & Bhd’s Coast Guard Drawing 87 WPB 117-001, Rev F, Transverse Sections Coast Guard Drawing 87 WPB 122-001, Rev C, Watertight Bulkheads Coast Guard Drawing 87 WPB 131-001, Rev J, Deck Construction Plan

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements

OTHER REFERENCES

None.

3. REQUIREMENTS

3.1 General. The Contractor shall perform the tasks specified herein, using Coast Guard Drawings 87 WPB 111- 001, 87 WPB 113-001, 87 WPB 116-001, 87 WPB 117-001, 87 WPB 122-001 and 87 WPB 131-001 as guidance.

NOTE

This item does not address interferences in way of repair work. Cost of interference removal and reinstallation must be negotiated via the Change Request process.

3.2 Renewal. The Contractor shall renew 3/16” steel hull plating, as designated by the Coast Guard Inspector, up to 4 square feet, using Coast Guard Drawings 87 WPB 111-001, 87 WPB 113-001, 87 WPB 116-001, 87 WPB 117-001, 87 WPB 122-001 and 87 WPB 131-001 as guidance.

3.3 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in SFLC Std Spec 0000, Appendix A (Requirements for Preservation of Ship Structures).

3.4 Electronic equipment protection. The Contractor shall safeguard electronic equipment before welding to prevent damage from stray current and electromagnetic interference. Electrically isolate or disconnect ungrounded or sensitive equipment as necessary. Locate all welder ground connections as close to the work as possible.

4. NOTES

18 (Rev-0)

19 (Rev-0)

11100_JLW_1110_87WPB

WORK ITEM 4: Forepeak, Modify (EC 087-A-033) (D)

1.1 Intent. This work item describes the requirements for the Contractor to modify and preserve the Forepeak (2- 0-0-V), creating a sealed, lower forepeak void and a separate, upper forepeak compartment.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 87 WPB 111-001, Rev E, Shell Expansion Coast Guard Drawing 87 WPB 131-002, Rev -, Forepeak Void New Watertight Flat Coast Guard Drawing 87 WPB 252-001, Rev D, Pilothouse Console Arrangement Coast Guard Drawing 87 WPB 252-002, Rev K, Alarm Monitoring System Coast Guard Drawing 87 WPB 302-001, Rev P, Misc. Controls Wiring Diagram, sheets 1, 2, 3, 36, 39, &

Coast Guard Drawing 87 WPB 529-001, Rev F, Bilge Piping Coast Guard Drawing 87 WPB 581-001, Rev F, Anchor Handling & Hawse Pipe Details Coast Guard Drawing 87 WPB 635-001, Rev C, Linings and Insulation Plan & Details

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Change 1, Jun 2006, Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Jan 2009, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Jan 2009, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), Jan 2009, Temporary Hull Accesses

OTHER REFERENCES

ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual

Ultrasonic Pulse-Echo Contact Method MIL-PRF-16173, Jan 1993, Corrosion Preventive Compound, Solvent Cutback, Cold Application

3. REQUIREMENTS

3.1 General.

3.1.1 Critical inspection report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraphs:

• 3.4 (Substrate inspection).

3.1.2 Interferences. The Contractor shall be aware that interferences in way of work include, but are not limited to the following:

• Anchor.

• Anchor chain.

• Anchor line.

• Anchor line drum.

• Anchor line holder.

• Anchor windlass.

• Anchor windlass hydraulic components (as applicable).

• Bulkhead insulation on aft side of bulkhead 2.

• Deck grating.

• Electric switches.

• False bulkheads.

• Float switches.

• Hydraulic piping.

• Ladder.

• Lights.

• Lockers.

• Racks.

• Bilge discharge check valve.

• Bilge overboard discharge valve.

• Electrical boxes (J-box).

• Wiring.

• Piping.

• Piping hangers.

3.1.3 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the bilge discharge valves, anchor windlass system, bilge pump, and Forepeak bilge level sensors and switches to demonstrate existing operational condition. Submit a CFR.

3.1.4 Temporary access openings. Due to limited access to work areas, the Contractor may, with express permission of the KO (via submission of a CFR), cut access holes to facilitate accomplishment of the work specified herein. Perform all work required to open and close the access openings in accordance with SFLC Std Spec 8636.

3.1.5 Surface preparation particulars. The Contractor shall prepare all bilge, bulkhead, overhead, and shell surfaces of the Forepeak Compartment, including structural members and the ladder; use the system specified for

20 (Rev-0) preparation for “Bilges, Cofferdams, and Forepeaks, Option 1”, in COMDTINST M10360.3. Appendix B (Cutter and Boat Interior Painting Systems).

3.2 Removals. The Contractor shall accomplish the following as shown on Coast Guard Drawing 87 WPB 131- 002 and using Coast Guard Drawing 87 WPB 529-001 for guidance:

3.2.1 Crop out and retain for reuse the bilge overboard hull penetration with six-inch stainless steel insert.

3.2.2 Remove and discard the following:

• Bilge pump.

• Bilge pump discharge hose.

• Serrated deck grating.

• All deck grating support structures including the angle on bulkhead 2. See Figure 1 below.

• All stand offs and foundations located below the spray chine.

3.3 Preparation. The Contractor shall remove all water from the bilge and prepare all shell, bilge, and associated structural member surfaces; use the system specified for “Bilges,…