Schedule of Supplies Services - Revision 2.docx

DOCX document 46 KB Posted

Attached to
USCGC SEA OTTER & USCGC PIKE - Dry Dock Repairs
Solicitation number
HSCG80-11-Q-P45U84
Issued by

About this file

Schedule of Supplies Services - Revision 2

View the file

Other files

File Type Posted
A0002-SF30-SEA OTTER PIKE.pdf PDF
87-WPB_243_1_7_-_H.pdf PDF
A0001-SF30-SEA OTTER PIKE.pdf PDF
Clarifications Responses.pdf PDF
87-WPB_243_1_5_-_M.pdf PDF
87-WPB_243_1_1_-_M.pdf PDF
87-WPB_243_1_6_-_M.pdf PDF
Revised Schedule of Supplies Services.docx DOCX document
SEA_OTTER_WPB_87_DD_JLS_11R0.pdf PDF
HSCG80-11-Q-P45U84.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HSCG80-11-Q-45U84 PAGE 5 OF 41

USCGC SEA OTTER (WPB-87362) & USCGC PIKE (WPB-87362)

DRYDOCK REPAIRS

HSCG80-11-Q-45U84 PAGE 3 OF 41

USCGC SEA OTTER (WPB-87362) & USCGC PIKE (WPB-87362)

DRYDOCK REPAIRS

SUPPLIES/SERVICES AND PRICES/COSTS FOR:

USCGC SEA OTTER (WPB-87362) DRYDOCK AVAILABILITY 2011

ITEM
DESCRIPTION
UNIT PRICE
UNIT
QTY
EXTENDED PRICE
1-D
Perform Ultrasonic Thickness Measurements
250 SHOTS
1
2-O
Perform Ultrasonic Thickness Measurements
25 SHOTS
10
3-D
***INTENTIONALLY LEFT BLANK***
JOB
2
4-D
Forepeak, Modify (EC 087-A-033)
JOB
1
5-D
Dirty Oil Tank, Clean and Inspect
JOB
1
6-D
Oily Water Tank, Clean and Inspect
JOB
1
7-D
Tanks (MP Fuel Service), Clean and Inspect
JOB
1
8-D
Tanks (Potable Water), Clean and Inspect
JOB
1
9-D
Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting
JOB
1
10-O
Depth Sounder, Capastic Fairing Renew
JOB
1
11-O
Main Engine/Reduction Gear, Align
EA
2
12-D
Propulsion Shafts, Remove, Inspect and Reinstall
JOB
1
13-O
Propulsion Shaft, Repair
EA
2
14-O
Propulsion Shaft, Straighten
EA
2
15-O
Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew
EA
2
16-O
After Water-Lubricated Propulsion Shaft Bearing, Renew
EA
2
17-O
Intermediate Bearing Carrier, Renew
EA
2
18-O
After Bearing Carrier, Renew
EA
2
19-O
Stern Tube, Interior Surfaces, Preserve 100%
JOB
1
20-O
Stern Tube, Interior Surfaces, Repair
JOB
1
21-D
Propellers, Remove, Inspect and Reinstall
JOB
1
22-O
Propeller, Minor Reconditioning and Repairs, Perform
EA
2
23-O
Main Diesel Engine Concentric Ring, Renew
EA
2
24-D
Fathometer Transducer, Renew
JOB
1
25-D
Speed Log, Skin Valve Assembly, Clean and Inspect
JOB
1
26-D
Sea Water System (Sea Valves, Strainers, Piping) Clean, Inspect and Repair
JOB
1
27-D
Rudder Assemblies, Remove, Inspect and Reinstall
JOB
1
28-D
RHIB Notch Skid Pads, Inspect
JOB
1
29-O
RHIB Notch Skid Pad Studs, Renew
10 STUDS
5
30-D
Stern Launch Door, Remove, Inspect and Reinstall
JOB
1
31-D
Grey Water Holding Tank, Clean and Inspect
JOB
1
32-D
Sewage Holding Tank, Clean and Inspect
JOB
1
33-D
Grey Water Piping, Clean and Inspect
JOB
1
34-D
Sewage Piping, Clean and Inspect
JOB
1
35-O
U/W Body, Preserve 100%
JOB
1
36-O
U/W Body, Preserve Partial 33%
JOB
1
NSP
37-D
***INTENTIONALLY LEFT BLANK***
JOB
1
38-D
Hull Plating Freeboard, Preserve Partial SEA OTTER ONLY
JOB
1
39-D
Superstructure, Preserve 100%
JOB
1
40-D
***INTENTIONALLY LEFT BLANK***
JOB
1
41-O
Main Mast, Preserve SEA OTTER ONLY
JOB
1
42-D
Cathodic Protection/Zincs, Renew
JOB
1
43-D
Drydocking
JOB
1
44-D
Temporary Services, Provide
JOB
1
45-D
Telephone Service, Provide
JOB
1
46-D
Install Dirty Oil Tank Level Indicator (EC 087-B-039)
JOB
1
47-D
Hatch Coamings, Renew (EC 087-A-027) SEA OTTER ONLY
JOB
1
48-D
Ventilation Systems, Commercial Cleaning
JOB
1
49-D
***INTENTIONALLY LEFT BLANK***
JOB
1
50-D
Decks, Exterior, Prepare, Coat and Install Slip-Resistant Sheets SEA OTTER ONLY
JOB
1
51-D
Deck Covering (Wet/Dry), Seal
JOB
1
52-D
Renew Mast Cable Standoffs SEA OTTER ONLY
JOB
1
53-D
Renew Sea Chest Strainer Plate SEA OTTER ONLY
JOB
1
54-O
Hull and Structural Plating-3/16" Steel Plate, Repair
JOB
1
A-O
Composite Labor Rate
Hour
1
B-D
GFP Report
NSP
Z-O
Laydays
Day
5

Total Price of Definite Items

Total Price of Option Items

Total Price of Definite and Optional Items

SUPPLIES/SERVICES AND PRICES/COSTS FOR:

USCGC PIKE (WPB-87365) DRYDOCK AVAILABILITY 2011

ITEM
DESCRIPTION
UNIT PRICE
UNIT
QTY
EXTENDED PRICE
1-D
Perform Ultrasonic Thickness Measurements
250 SHOTS
1
2-O
Perform Ultrasonic Thickness Measurements
25 SHOTS
10
3-D
Hull and Structural Plating-3/16" Steel Plate, Repair PIKE ONLY
JOB
2
4-D
Forepeak, Modify (EC 087-A-033)
JOB
1
5-D
Dirty Oil Tank, Clean and Inspect
JOB
1
6-D
Oily Water Tank, Clean and Inspect
JOB
1
7-D
Tanks (MP Fuel Service), Clean and Inspect
JOB
1
8-D
Tanks (Potable Water), Clean and Inspect
JOB
1
9-D
Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting
JOB
1
10-O
Depth Sounder, Capastic Fairing Renew
JOB
1
11-O
Main Engine/Reduction Gear, Align
EA
2
12-D
Propulsion Shafts, Remove, Inspect and Reinstall
JOB
1
13-O
Propulsion Shaft, Repair
EA
2
14-O
Propulsion Shaft, Straighten
EA
2
15-O
Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew
EA
2
16-O
After Water-Lubricated Propulsion Shaft Bearing, Renew
EA
2
17-O
Intermediate Bearing Carrier, Renew
EA
2
18-O
After Bearing Carrier, Renew
EA
2
19-O
Stern Tube, Interior Surfaces, Preserve 100%
JOB
1
20-O
Stern Tube, Interior Surfaces, Repair
JOB
1
21-D
Propellers, Remove, Inspect and Reinstall
JOB
1
22-O
Propeller, Minor Reconditioning and Repairs, Perform
EA
2
23-O
Main Diesel Engine Concentric Ring, Renew
EA
2
24-D
Fathometer Transducer, Renew
JOB
1
25-D
Speed Log, Skin Valve Assembly, Clean and Inspect
JOB
1
26-D
Sea Water System (Sea Valves, Strainers, Piping) Clean, Inspect and Repair
JOB
1
27-D
Rudder Assemblies, Remove, Inspect and Reinstall
JOB
1
28-D
RHIB Notch Skid Pads, Inspect
JOB
1
29-O
RHIB Notch Skid Pad Studs, Renew
10 STUDS
5
30-D
Stern Launch Door, Remove, Inspect and Reinstall
JOB
1
31-D
Grey Water Holding Tank, Clean and Inspect
JOB
1
32-D
Sewage Holding Tank, Clean and Inspect
JOB
1
33-D
Grey Water Piping, Clean and Inspect
JOB
1
34-D
Sewage Piping, Clean and Inspect
JOB
1
35-O
U/W Body, Preserve 100%
JOB
1
36-O
U/W Body, Preserve Partial 33%
JOB
1
NSP
37-D
Hull Plating Freeboard, Preserve 100% PIKE ONLY
JOB
1
38-D
***INTENTIONALLY LEFT BLANK***
JOB
1
39-D
Superstructure, Preserve 100%
JOB
1
40-D
Main Mast, Preserve PIKE ONLY
JOB
1
41-O
***INTENTIONALLY LEFT BLANK***
JOB
1
42-D
Cathodic Protection/Zincs, Renew
JOB
1
43-D
Drydocking
JOB
1
44-D
Temporary Services, Provide
JOB
1
45-D
Telephone Service, Provide
JOB
1
46-D
Install Dirty Oil Tank Level Indicator (EC 087-B-039)
JOB
1
47-D
***INTENTIONALLY LEFT BLANK***
JOB
1
48-D
Ventilation Systems, Commercial Cleaning
JOB
1
49-D
Sea Valves and Waster Pieces, Renew PIKE ONLY
JOB
1
50-D
***INTENTIONALLY LEFT BLANK***
JOB
1
51-D
Deck Covering (Wet/Dry), Seal
JOB
1
52-D
***INTENTIONALLY LEFT BLANK***
JOB
1
53-D
***INTENTIONALLY LEFT BLANK***
JOB
1
54-O
Hull and Structural Plating-3/16" Steel Plate, Repair
JOB
1
A-O
Composite Labor Rate
Hour
1
B-D
GFP Report
NSP
Z-O
Laydays
Day
5

Total Price of Definite Items

Total Price of Option Items

Total Price of Definite and Optional Items

TOTAL ALL

Insert individual prices in Schedule of Supplies/Services above and insert totals of extended prices for all cutters as indicated below:

SEA OTTER

(WPB-87362)

PIKE

(WPB-87365)

TOTAL

Total Definitive Item CLINs:

$
$
$

Total Optional Item CLINs:

(Excluding Composite Labor, Travel, Per Diem and Lay Days)

$
$
$

Composite Labor:

$
$
$

Lay Days:

$
$
$

TOTAL:

$
$
$

File details come from the government source that posted it. Updated .