The file's text, extracted by GovTribe without its formatting.
HSCG80-11-Q-45U84 PAGE 5 OF 41
USCGC SEA OTTER (WPB-87362) & USCGC PIKE (WPB-87362)
DRYDOCK REPAIRS
HSCG80-11-Q-45U84 PAGE 3 OF 41
USCGC SEA OTTER (WPB-87362) & USCGC PIKE (WPB-87362)
DRYDOCK REPAIRS
SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC SEA OTTER (WPB-87362) DRYDOCK AVAILABILITY 2011
| ITEM |
| DESCRIPTION |
| UNIT PRICE |
| UNIT |
| QTY |
| EXTENDED PRICE |
| 1-D |
| Perform Ultrasonic Thickness Measurements |
| 2-O |
| Perform Ultrasonic Thickness Measurements |
| 3-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 4-D |
| Forepeak, Modify (EC 087-A-033) |
| 5-D |
| Dirty Oil Tank, Clean and Inspect |
| 6-D |
| Oily Water Tank, Clean and Inspect |
| 7-D |
| Tanks (MP Fuel Service), Clean and Inspect |
| 8-D |
| Tanks (Potable Water), Clean and Inspect |
| 9-D |
| Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting |
| 10-O |
| Depth Sounder, Capastic Fairing Renew |
| 11-O |
| Main Engine/Reduction Gear, Align |
| 12-D |
| Propulsion Shafts, Remove, Inspect and Reinstall |
| 13-O |
| Propulsion Shaft, Repair |
| 14-O |
| Propulsion Shaft, Straighten |
| 15-O |
| Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew |
| 16-O |
| After Water-Lubricated Propulsion Shaft Bearing, Renew |
| 17-O |
| Intermediate Bearing Carrier, Renew |
| 18-O |
| After Bearing Carrier, Renew |
| 19-O |
| Stern Tube, Interior Surfaces, Preserve 100% |
| 20-O |
| Stern Tube, Interior Surfaces, Repair |
| 21-D |
| Propellers, Remove, Inspect and Reinstall |
| 22-O |
| Propeller, Minor Reconditioning and Repairs, Perform |
| 23-O |
| Main Diesel Engine Concentric Ring, Renew |
| 24-D |
| Fathometer Transducer, Renew |
| 25-D |
| Speed Log, Skin Valve Assembly, Clean and Inspect |
| 26-D |
| Sea Water System (Sea Valves, Strainers, Piping) Clean, Inspect and Repair |
| 27-D |
| Rudder Assemblies, Remove, Inspect and Reinstall |
| 28-D |
| RHIB Notch Skid Pads, Inspect |
| 29-O |
| RHIB Notch Skid Pad Studs, Renew |
| 30-D |
| Stern Launch Door, Remove, Inspect and Reinstall |
| 31-D |
| Grey Water Holding Tank, Clean and Inspect |
| 32-D |
| Sewage Holding Tank, Clean and Inspect |
| 33-D |
| Grey Water Piping, Clean and Inspect |
| 34-D |
| Sewage Piping, Clean and Inspect |
| 35-O |
| U/W Body, Preserve 100% |
| 36-O |
| U/W Body, Preserve Partial 33% |
| 37-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 38-D |
| Hull Plating Freeboard, Preserve Partial SEA OTTER ONLY |
| 39-D |
| Superstructure, Preserve 100% |
| 40-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 41-O |
| Main Mast, Preserve SEA OTTER ONLY |
| 42-D |
| Cathodic Protection/Zincs, Renew |
| 44-D |
| Temporary Services, Provide |
| 45-D |
| Telephone Service, Provide |
| 46-D |
| Install Dirty Oil Tank Level Indicator (EC 087-B-039) |
| 47-D |
| Hatch Coamings, Renew (EC 087-A-027) SEA OTTER ONLY |
| 48-D |
| Ventilation Systems, Commercial Cleaning |
| 49-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 50-D |
| Decks, Exterior, Prepare, Coat and Install Slip-Resistant Sheets SEA OTTER ONLY |
| 51-D |
| Deck Covering (Wet/Dry), Seal |
| 52-D |
| Renew Mast Cable Standoffs SEA OTTER ONLY |
| 53-D |
| Renew Sea Chest Strainer Plate SEA OTTER ONLY |
| 54-O |
| Hull and Structural Plating-3/16" Steel Plate, Repair |
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
SUPPLIES/SERVICES AND PRICES/COSTS FOR:
USCGC PIKE (WPB-87365) DRYDOCK AVAILABILITY 2011
| ITEM |
| DESCRIPTION |
| UNIT PRICE |
| UNIT |
| QTY |
| EXTENDED PRICE |
| 1-D |
| Perform Ultrasonic Thickness Measurements |
| 2-O |
| Perform Ultrasonic Thickness Measurements |
| 3-D |
| Hull and Structural Plating-3/16" Steel Plate, Repair PIKE ONLY |
| 4-D |
| Forepeak, Modify (EC 087-A-033) |
| 5-D |
| Dirty Oil Tank, Clean and Inspect |
| 6-D |
| Oily Water Tank, Clean and Inspect |
| 7-D |
| Tanks (MP Fuel Service), Clean and Inspect |
| 8-D |
| Tanks (Potable Water), Clean and Inspect |
| 9-D |
| Pilothouse Deck (Aluminum), Inspect, Preserve and Renew Electrical Matting |
| 10-O |
| Depth Sounder, Capastic Fairing Renew |
| 11-O |
| Main Engine/Reduction Gear, Align |
| 12-D |
| Propulsion Shafts, Remove, Inspect and Reinstall |
| 13-O |
| Propulsion Shaft, Repair |
| 14-O |
| Propulsion Shaft, Straighten |
| 15-O |
| Intermediate Water-Lubricated Propulsion Shaft Bearing, Renew |
| 16-O |
| After Water-Lubricated Propulsion Shaft Bearing, Renew |
| 17-O |
| Intermediate Bearing Carrier, Renew |
| 18-O |
| After Bearing Carrier, Renew |
| 19-O |
| Stern Tube, Interior Surfaces, Preserve 100% |
| 20-O |
| Stern Tube, Interior Surfaces, Repair |
| 21-D |
| Propellers, Remove, Inspect and Reinstall |
| 22-O |
| Propeller, Minor Reconditioning and Repairs, Perform |
| 23-O |
| Main Diesel Engine Concentric Ring, Renew |
| 24-D |
| Fathometer Transducer, Renew |
| 25-D |
| Speed Log, Skin Valve Assembly, Clean and Inspect |
| 26-D |
| Sea Water System (Sea Valves, Strainers, Piping) Clean, Inspect and Repair |
| 27-D |
| Rudder Assemblies, Remove, Inspect and Reinstall |
| 28-D |
| RHIB Notch Skid Pads, Inspect |
| 29-O |
| RHIB Notch Skid Pad Studs, Renew |
| 30-D |
| Stern Launch Door, Remove, Inspect and Reinstall |
| 31-D |
| Grey Water Holding Tank, Clean and Inspect |
| 32-D |
| Sewage Holding Tank, Clean and Inspect |
| 33-D |
| Grey Water Piping, Clean and Inspect |
| 34-D |
| Sewage Piping, Clean and Inspect |
| 35-O |
| U/W Body, Preserve 100% |
| 36-O |
| U/W Body, Preserve Partial 33% |
| 37-D |
| Hull Plating Freeboard, Preserve 100% PIKE ONLY |
| 38-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 39-D |
| Superstructure, Preserve 100% |
| 40-D |
| Main Mast, Preserve PIKE ONLY |
| 41-O |
| ***INTENTIONALLY LEFT BLANK*** |
| 42-D |
| Cathodic Protection/Zincs, Renew |
| 44-D |
| Temporary Services, Provide |
| 45-D |
| Telephone Service, Provide |
| 46-D |
| Install Dirty Oil Tank Level Indicator (EC 087-B-039) |
| 47-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 48-D |
| Ventilation Systems, Commercial Cleaning |
| 49-D |
| Sea Valves and Waster Pieces, Renew PIKE ONLY |
| 50-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 51-D |
| Deck Covering (Wet/Dry), Seal |
| 52-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 53-D |
| ***INTENTIONALLY LEFT BLANK*** |
| 54-O |
| Hull and Structural Plating-3/16" Steel Plate, Repair |
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
TOTAL ALL
Insert individual prices in Schedule of Supplies/Services above and insert totals of extended prices for all cutters as indicated below:
SEA OTTER
(WPB-87362)
PIKE
(WPB-87365)
TOTAL
Total Definitive Item CLINs:
Total Optional Item CLINs:
(Excluding Composite Labor, Travel, Per Diem and Lay Days)
Composite Labor:
Lay Days:
TOTAL: