A2 CHENAScheduleofSupplies(amend-2).xls
XLS spreadsheet 37 KB Posted
- Solicitation number
- HSCG80-08-Q-3FA282
About this file
CHENA Schedule of Supplies (amend-2)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A2 CHENA AMENDMENT-0002.doc | DOC document | |
| A2USCGCCHENADRYDOCK1449(amend002).pdf | ||
| A2 CHENASPEC 75409_DD_P08R1.Doc | DOC document | |
| CHENA AMENDMENT-0001.doc | DOC document | |
| 3CHENAScheduleofSupplies(amend-1).xls | XLS spreadsheet | |
| 2USCGCCHENADRYDOCK1449(amend001).pdf | ||
| 2USCGCCHENADRYDOCK1449.pdf | ||
| 4CHENA_75409_SPEC_DD_P08R0.Doc | DOC document | |
| 3CHENAScheduleofSupplies(rev-0).xls | XLS spreadsheet | |
| 1USCGCCHENADRYDOCKRFQ.DOC | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section B
| HSCG80-08-Q-3FA282 Amendment ( 002 ) | ||||||||
| USCGC CHENA (WLR 75409) | ||||||||
| DRYDOCKING AVAILABILITY | ||||||||
| SUPPLIES OR SERVICES AND PRICES/COSTS | ||||||||
| CLIN Type | WORK ITEM | CLIN | WORK ITEM TITLE | UNIT PRICE | UNIT | QTY | EXTENDED BASE | |
| OPT | 1 | 0001 | WELDING REPAIRS: Crack Repair (Steel) | 1 foot | 8 | |||
| OPT | 1 | 0001AA | WELDING REPAIRS: Structural Steel Plate (10.2# Steel) | 4 sqft | 2 | |||
| OPT | 1 | 0001AB | WELDING REPAIRS: Structural Steel Plate (12.75# Steel) | 3 sqft | 2 | |||
| OPT | 1 | 0001AC | WELDING REPAIRS: Overlay Welding (Steel) | 8 sqin | 4 | |||
| OPT | 1 | 0001AD | WELDING REPAIRS: Eroded Weld Renewal (Steel) | 1 foot | 6 | |||
| OPT | 1 | 0001AE | WELDING REPAIRS: Stud Renewal (Steel) | EA | 8 | |||
| BASE | 2 | 0002 | REMOVE, INSPECT, AND REINSTALL PROPELLER SHAFTS | JOB | 1 | |||
| BASE | 3 | 0003 | REMOVE, INSPECT, AND REINSTALL INTERMEDIATE SHAFT | JOB | 1 | |||
| OPT | 4 | 0004 | STRAIGHTEN SHAFT | EA | 2 | |||
| BASE | 5 | 0005 | RENEW WATER-LUBRICATED SHAFT BEARINGS | JOB | 1 | |||
| BASE | 6 | 0006 | RENEW PROPELLER SHAFT SLEEVES(S) | JOB | 1 | |||
| BASE | 7 | 0007 | REMOVE, INSPECT, AND REINSTALL PROPELLERS | JOB | 1 | |||
| OPT | 8 | 0008 | PERFORM MINOR REPAIRS AND RECONDITIONING OF PROPELLER | EA | 2 | |||
| BASE | 9 | 0009 | CLEAN, INSPECT, AND TEST GRID COOLERS | JOB | 1 | |||
| BASE | 10 | 0010 | OVERHAUL AND RENEW VALVES | JOB | 1 | |||
| BASE | 11 | 0011 | REMOVE, INSPECT AND REINSTALL RUDDER ASSEMBLIES FOR STEERING AND FLANKING SYSTEMS | JOB | 1 | |||
| OPT | 12 | 0012 | REBUILD RUDDER STOCK AND RUDDER | EA | 2 | |||
| OPT | 13 | 0013 | RENEW RUDDER LOWER BEARING TRUNK | JOB | 1 | |||
| BASE | 14 | 0014 | PRESERVE SPUD AND SPUD WELL SURFACES AND RENEW SPUD WELL LINERS | JOB | 1 | |||
| OPT | 14 | 0014AA | Renew Brackets | JOB | 1 | |||
| BASE | 15 | 0015 | SHRINK WRAP CRANE AND BOAT DAVIT | JOB | 1 | |||
| BASE | 16 | 0016 | INSPECT VARIOUS DECK FITTINGS | JOB | 1 | |||
| BASE | 17 | 0017 | PRESERVE BARGE BUOY DECK | JOB | 1 | |||
| 18 | 0018 | PRESERVE COMPLETE UNDERWATER BODY | NSP | NSP | NSP | NSP | ||
| BASE | 18 | 0018AA | Coating System Visual Inspection | JOB | 1 | |||
| OPT | 18 | 0018AB | Coating System Thickness Testing | JOB | 1 | |||
| BASE | 18 | 0018AC | Painting of Draft Marks - Barge | JOB | 1 | |||
| BASE | 18 | 0018AD | Painting of Draft Marks - Tender | JOB | 1 | |||
| BASE | 18 | 0018AE | "Condition B" Barge (Entire 100% U/W Body) | JOB | 1 | |||
| BASE | 18 | 0018AF | "Condition B" Tender (Entire 100% U/W Body) | JOB | 1 | |||
| 19 | 0019 | ROUTINE DRYDOCKING | NSP | NSP | NSP | NSP | ||
| BASE | 19 | 0019AA | Routine Drydocking of Barge | JOB | 1 | |||
| BASE | 19 | 0019AB | Routine Drydocking of Tender | JOB | 1 | |||
| BASE | 19 | 0019AC | Remove and dispose 1800 gallons of fuel (Tender & Barge) | JOB | 1 | |||
| OPT | 19 | 0019AD | Remove and dispose of additional fuel (up to 1000 gallons) | JOB | 3 | |||
| OPT | 19 | 0019AE | Renew Zinc Anode | EA | 32 | |||
| BASE | 20 | 0020 | PROVIDE TEMPORARY LOGISTICS | JOB | 1 | |||
| OPT | 20 | 0020AA | Provide Additional Temporary Logistics | DAY | 5 | |||
| BASE | 21 | 0021 | INSPECT AND OVERHAUL STRAINERS | JOB | 1 | |||
| 22 | 0022 | PRESERVE SHAFT ALLEY, SEWAGE HOLD, AND BRIDGE SURFACES | NSP | NSP | NSP | NSP | ||
| OPT | 22 | 0022AA | Preserve Shaft Alley Surfaces | JOB | 1 | |||
| OPT | 22 | 0022AB | Preserve Sewage Hold Surfaces | JOB | 1 | |||
| OPT | 22 | 0022AC | Preserve Bridge surfaces | JOB | 1 | |||
| BASE | 23 | 0023 | ULTRASONIC TESTING | |||||
| (200 Measurements) | JOB | 1 | ||||||
| OPT | 23 | 0023AA | Ultrasonic Testing | |||||
| (Additional 25 Measurements) | JOB | 4 | ||||||
| OPT | A | Composite Labor Rate | HOUR | 180 | ||||
| BASE | B | GFP report in accordance with solicitation Section H. | NSP | EA | 1 | NSP | ||
| OPT | Z | Laydays | DAY | 5 | ||||
| Subtotal BASE Items: | ||||||||
| Subtotal OPTION Items: | ||||||||
| Total of all Items: |
Page &P of &N
File details come from the government source that posted it. Updated .