3CHENAScheduleofSupplies(amend-1).xls

XLS spreadsheet 37 KB Posted

Attached to
USCGC CHENA (WLR-75409) Drydock and repair availability
Solicitation number
HSCG80-08-Q-3FA282
Issued by

About this file

CHENA SCHEDULE OF SUPPLIES amend 001

View the file

Other files

File Type Posted
A2 CHENAScheduleofSupplies(amend-2).xls XLS spreadsheet
A2 CHENA AMENDMENT-0002.doc DOC document
A2USCGCCHENADRYDOCK1449(amend002).pdf PDF
A2 CHENASPEC 75409_DD_P08R1.Doc DOC document
CHENA AMENDMENT-0001.doc DOC document
2USCGCCHENADRYDOCK1449(amend001).pdf PDF
2USCGCCHENADRYDOCK1449.pdf PDF
4CHENA_75409_SPEC_DD_P08R0.Doc DOC document
3CHENAScheduleofSupplies(rev-0).xls XLS spreadsheet
1USCGCCHENADRYDOCKRFQ.DOC DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B

HSCG80-08-Q-3FA282 Amendment ( 001 )
USCGC CHENA (WLR 75409)
DRYDOCKING AVAILABILITY
SUPPLIES OR SERVICES AND PRICES/COSTS
CLIN TypeWORK ITEMCLINWORK ITEM TITLEUNIT PRICEUNITQTYEXTENDED BASE
OPT10001WELDING REPAIRS: Crack Repair (Steel)1 foot8
OPT10001AAWELDING REPAIRS: Structural Steel Plate (10.2# Steel)4 sqft2
OPT10001ABWELDING REPAIRS: Structural Steel Plate (12.75# Steel)3 sqft2
OPT10001ACWELDING REPAIRS: Overlay Welding (Steel)8 sqin4
OPT10001ADWELDING REPAIRS: Eroded Weld Renewal (Steel)1 foot6
OPT10001AEWELDING REPAIRS: Stud Renewal (Steel)EA8
BASE20002REMOVE, INSPECT, AND REINSTALL PROPELLER SHAFTSJOB1
BASE30003REMOVE, INSPECT, AND REINSTALL INTERMEDIATE SHAFTJOB1
OPT40004STRAIGHTEN SHAFTEA2
BASE50005RENEW WATER-LUBRICATED SHAFT BEARINGSJOB1
BASE60006RENEW PROPELLER SHAFT SLEEVES(S)JOB1
BASE70007REMOVE, INSPECT, AND REINSTALL PROPELLERSJOB1
OPT80008PERFORM MINOR REPAIRS AND RECONDITIONING OF PROPELLEREA2
BASE90009CLEAN, INSPECT, AND TEST GRID COOLERSJOB1
BASE100010OVERHAUL AND RENEW VALVESJOB1
BASE110011REMOVE, INSPECT AND REINSTALL RUDDER ASSEMBLIES FOR STEERING AND FLANKING SYSTEMSJOB1
OPT120012REBUILD RUDDER STOCK AND RUDDERJOB1
OPT130013RENEW RUDDER LOWER BEARING TRUNKJOB1
BASE140014PRESERVE SPUD AND SPUD WELL SURFACES AND RENEW SPUD WELL LINERSJOB1
OPT140014AARenew BracketsJOB1
BASE150015SHRINK WRAP CRANE AND BOAT DAVITJOB1
BASE160016INSPECT VARIOUS DECK FITTINGSJOB1
BASE170017PRESERVE BARGE BUOY DECKJOB1
180018PRESERVE COMPLETE UNDERWATER BODYNSPNSPNSPNSP
BASE180018AACoating System Visual InspectionJOB1
OPT180018ABCoating System Thickness TestingJOB1
BASE180018ACPainting of Draft Marks - BargeJOB1
BASE180018ADPainting of Draft Marks - TenderJOB1
BASE180018AE"Condition B" Barge (Entire 100% U/W Body)JOB1
BASE180018AF"Condition B" Tender (Entire 100% U/W Body)JOB1
190019ROUTINE DRYDOCKINGNSPNSPNSPNSP
BASE190019AARoutine Drydocking of BargeJOB1
BASE190019ABRoutine Drydocking of TenderJOB1
BASE190019ACRemove and dispose 1800 gallons of fuel (Tender & Barge)JOB1
OPT190019ADRemove and dispose of additional fuel (up to 1000 gallons)JOB3
OPT190019AERenew Zinc AnodeEA32
BASE200020PROVIDE TEMPORARY LOGISTICSJOB1
OPT200020AAProvide Additional Temporary LogisticsDAY5
BASE210021INSPECT AND OVERHAUL STRAINERSJOB1
220022PRESERVE SHAFT ALLEY, SEWAGE HOLD, AND BRIDGE SURFACESNSPNSPNSPNSP
OPT220022AAPreserve Shaft Alley SurfacesJOB1
OPT220022ABPreserve Sewage Hold SurfacesJOB1
OPT220022ACPreserve Bridge surfacesJOB1
BASE230023ULTRASONIC TESTING
(200 Measurements)JOB1
OPT230023AAUltrasonic Testing
(Additional 25 Measurements)JOB4
OPTAComposite Labor RateHOUR180
BASEBGFP report in accordance with solicitation Section H.NSPEA1NSP
OPTZLaydaysDAY5
Subtotal BASE Items:
Subtotal OPTION Items:
Total of all Items:

Page &P of &N

File details come from the government source that posted it. Updated .