Text version

USCG 47271 (MLB 47)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2016

Developed By: William A Baker

(Rev-0, 15 March 2016)

USCG 47271 (MLB-47) DRYDOCK AVAILABILITY FY2016

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ............................................................................... vii Consolidated List of Critical Inspection Items .......................................................................................... viii Principal Characteristics ............................................................................................................................... ix General Requirements WORK ITEM 1: General Welding, Provide WORK ITEM 2: Ultrasonic Testing (U/W Body) Shots, Perform WORK ITEM 3: Hull Plating (U/W Body), Inspect WORK ITEM 4: Rub Rail, Inspect – In Place WORK ITEM 5: Bulkhead Penetrations, Frame 5, Inspect WORK ITEM 6: Appendages (U/W), Leak Test WORK ITEM 7: Buoyancy Chamber(s), Clean and Inspect WORK ITEM 8: Mast, Inspect WORK ITEM 9: Main Diesel Engine, Remove and Install WORK ITEM 10: Main Diesel Engine To Reduction Gear, Both, Align WORK ITEM 11: Cardan Shaft(s), Renew WORK ITEM 12: Propulsion Shaft, Remove, Inspect, and Install WORK ITEM 13: Water Lubricated Bearings, Renew WORK ITEM 14: Propellers, Remove, Inspect, and Reinstall WORK ITEM 15: Standard Hoses, Renew WORK ITEM 16: Lazarette Intake Vent, Inspect WORK ITEM 17: Sea Valves, Renew WORK ITEM 18: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 19: Diesel Tank(s), Refuel WORK ITEM 20: Fuel Root Valves, Renew WORK ITEM 21: Steering System, Inspect WORK ITEM 22: Rudder Assembly; Remove, Inspect and Reinstall WORK ITEM 23: Hull Identification Markings, Apply WORK ITEM 24: Cathodic Protection / Zincs, Renew WORK ITEM 25: Marine Chemist Services, Provide WORK ITEM 26: Drydock WORK ITEM 27: Temporary Services, Provide WORK ITEM 28: Sea Trial Performance, Support, Provide WORK ITEM 29: U/W Body, Preserve (100%) iii (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

iv (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

American Welding Society (AWS): http://www.awspubs.com/index.php

ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

NFPA: http://www.nfpa.org

SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 47B MLB 110-500, Rev H, Shell Plating

Coast Guard Drawing 47B MLB 150-090, Rev E, Aft Buoyancy Box

Coast Guard Drawing 47B MLB 171-010, Rev P, Mast

Coast Guard Drawing 47B MLB 201-010, Rev L, Machinery Arrangement

Coast Guard Drawing 47B MLB 243-010, Rev U, Propulsion Shafting Bearings & Seals

Coast Guard Drawing 47B MLB 505-020, Rev Y, Piping Arrangement in Hull

Coast Guard Drawing 47B MLB 801-002, Rev -, Docking Plan

Coast Guard Drawing 47B-MLB 110-201, Rev D, Transom

Coast Guard Drawing 47B-MLB 110-206, Rev F, Transverse Bhd Fr 5

Coast Guard Drawing 47B-MLB 110-208, Rev E, Fuel Tank

Coast Guard Drawing 47B-MLB 110-500, Rev H, Shell Plating

Coast Guard Drawing 47B-MLB 161-010, Rev M, Shaft Struts and Barrels

Coast Guard Drawing 47B-MLB 171-010, Rev P, Mast

Coast Guard Drawing 47B-MLB 201-010, Rev L, Machinery Arrangement

Coast Guard Drawing 47B-MLB 243-010, Rev U, Propulsion Shafting Bearings and Seals

Coast Guard Drawing 47B-MLB 252-020, Rev H, Engine Remote Shutdown

Coast Guard Drawing 47B-MLB 505-020, Rev Y, Piping Arrangement in Hull

Coast Guard Drawing 47B-MLB 505-020, Rev Y, Piping Arrangement in Hull

Coast Guard Drawing 47B-MLB 512-010, Rev N, HVAC Details & Arrangement http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace v (Rev-0)

Coast Guard Drawing 47B-MLB 561-010, Rev J, Steering Gear & Controls

Coast Guard Drawing 47B-MLB 561-020, Rev E, Rudder Arrangement

Coast Guard Drawing 47B-MLB 562-010, Rev B, Rudder

Coast Guard Drawing 47B-MLB 562-010, Rev B, Rudder

Coast Guard Drawing 47B-MLB 611-020, Rev L, Foam Fender Arrangement

Coast Guard Drawing 47B-MLB 631-010, Rev G, Hull Visual Identification.

Coast Guard Drawing 47B-MLB 631-020, Rev K, Paint Schedule

Coast Guard Drawing 47B-MLB 633-010, Rev A, Cathodic Protection

Coast Guard Drawing 47B-MLB 635-010, Rev C, Hull Insulation

Coast Guard Drawing 47B-MLB 801-002, Rev -, Docking Plan

Coast Guard Drawing 47B-MLB 801-010, Rev N, Booklet of General Plans

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual

Coast Guard Technical Publication (TP) 3355, SWBS 086, Apr 2003, General Information Book, Section

A

Coast Guard Technical Publication (TP) 3358, SWBS 233, Jul 2003, Manufacturer’s Information Book –

SWBS Group(s) 233

Coast Guard Technical Publication (TP) 3358, SWBS 233, Jul 2003, Manufacturer’s Information Book –

SWBS Group(s) 233, Sections A-H

Coast Guard Technical Publication (TP) 3359, SWBS 241-541, Mar 2007, Manufacturer’s Information

Book - SWBS Group(s) 241-541

Coast Guard Technical Publication (TP) 3359, SWBS 241-541, Mar 2007, Manufacturer’s Information

Book - SWBS Group(s) 241-541, SWBS 241, Section A, Propulsion Reduction Gears

Coast Guard Technical Publication (TP) 3359, SWBS 241-541, Mar 2007, Manufacturer’s Information

Book - SWBS Group(s) 241-541, SWBS 243, Sections A, B, C, D, Propulsion Shafting

Coast Guard Technical Publication (TP) 3359, SWBS 241-541, Mar 2007, Manufacturer’s Information

Book - SWBS Group(s) 241-541, SWBS 245, Section A, Propellers, MY-T4

Coast Guard Technical Publication (TP) 3359, SWBS 241-541, Mar 2007, Manufacturer’s Information

Book – SWBS Group(s) 241-541, SWBS 520, Sea Water Systems

Coast Guard Technical Publication (TP) 3360, SWBS 555-671, Sep 2012, Manufacturer's Instruction

Book - SWBS Group(s) 555-671, SWBS 611, Section A, Hull Fittings

Coast Guard Technical Publication (TP) 3918A, SWBS 233, Jul 2003, DDEC III, Series 92, Service

Manual - Sections 1 and 2

Coast Guard Technical Publication (TP) 3918C, SWBS 233, Jul 2003, DDEC III, Series 92, Service

Manual - Sections 7 Thru 15

Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat Diagrams for Hotwork

Coast Guard Technical Publications (TP) 3360, SWBS 555-671, Sep 2012, Manufacturer’s Instruction

Book - SWBS Group(s) 555-671

Coast Guard Technical Publications (TP) 3360, SWBS 555-671, Sep 2012, Manufacturer’s Instruction

Book - SWBS Group(s) 555-671, SWBS 561, Section A, Steering & Diving Control Systems

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General

Requirements vi (Rev-0)

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary

Services

OTHER REFERENCES

ASTM International (ASTM) B271, 1996, Standard Specification for Copper-Base Alloy Centrifugal

Castings

ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2008; Standard Specification for Anaerobic Single-Component

Adhesives (An)

ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by Manual

Ultrasonic Pulse-Echo Contact Method

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-

Petrolatum

International Standard For Organization (ISO) 484/2, 1981, Shipbuilding - Ship Screw Propeller -

Manufacturing tolerances - Part 2: Propellers of Diameter Between 0.80 and 2.50m, Inclusive

MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)

MIL-PRF-16173, Rev E, Corrosion Preventive Compound, Solvent Cutback, Cold-Application

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2015, Solvent Cleaning

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings SSPC-SP 1, -; Solvent Cleaning

The Society for Protective Coatings SSPC-SP 2, -; Hand Tool Cleaning vii (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

10 *Y 47 MLB Alignment

Pointers

PN: 47MLB RMF-ETRGAP 1 KIT

10 *Y 47 MLB Alignment

Pointer Flats

PN: 47MLB RMF-ETRGAF 1 KIT

10 *Y Digital Angle

Indicator

PN: 1 Ea

10 N Cardan Shaft Seals PN: 473246-01 2 Ea.

11 Y *Cardan shaft NSN: 3040-01-463-9110 2 ea. $3,605.64 ea.

11 N Cardan Shaft Seal NSN: 2010-01-545-9932 2 ea. $2,256.05 ea.

12 N Shaft Seal(3-1/2”) NSN: 2040-01-497-3186 2 ea. $280.27

13 N Upper Rudder

Bearing

NSN: 3120-01-469-8793 2 ea $80.81

13 N Lower Rudder

Bearing

NSN: 3120-01-469-8769 2 ea $203.17

13 N Shaft Bearing Strut

Tube

NSN: 3120-01-366-0506 2 ea $219.16

13 N Shaft Bearing Stern

Tube

NSN: 3120-01-365-9410 2 ea $107.77

17 N Main Engine R/W supply valve

NSN: 4820-01-544-1003

PN: S-135JW2PPPPP2-HSV

2 ea 989.00

17 N HVAC Suction Sea

Valve

NSN: 4820-01-274-6687

PN: 70-106-01

1 ea 29.95

24 N Zinc, Barrel shape NSN: 5342-01-366-3891 6 ea. 47.58

24 N Zinc, Oblong shape NSN: 5340-01-381-0840 2 ea. 27.20 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter viii (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5

(Inspection report particulars)):

Work

Item Title

2 Ultrasonic Testing (U/W Body) Shots, Perform

4 Rub Rail, Inspect – In Place

6 Appendages (U/W), Leak Test

10 Main Diesel Engine To Reduction Gear, Both, Align

11 Cardan Shaft(s), Renew

12 Propulsion Shaft, Remove, Inspect, and Install

16 Lazarette Intake Vent, Inspect

18 Sea Strainers - Duplex (All Sizes), Overhaul

22 Rudder Assembly; Remove, Inspect and Reinstall

29 U/W Body, Preserve (100%) ix (Rev-0)

PRINCIPAL CHARACTERISTICS

47' MLB, MOTOR LIFE BOAT

PHYSICAL

Length, overall 47' 11" (W/O Rubrails) - 48' 11"

Length, waterline 43”

Beam, overall 14' (W/O Rubrails) - 15'

Depth 4' 6"

Full load displacement 40,000 lbs

Full load draft 4' 6"

Height of highest projection 18' 6" (fixed height) - 28' 4"

HULL

Hull/superstructure material 5456 Aluminum

Frame spacing

FR 0 to 8 30" - 31"

FR 8 to 10 33"

FR 10 to 18 30"

MACHINERY

Engine details (2) DD 6V92TA DDEC III, 435 SHP each @ 2100 RPM

Electrical system 24 Volt DC

Number of propellers 2

Number of blades 4

Diameter 28"

Pitch 36"

Shaft- diameter x length (in) 2.50” x 159.0”

Shore tie voltage requirements 120 VAC (100A)

PERFORMANCE

Maximum speed at sea state 0 25 knots (2050-2200 RPM)

Cruise speed at sea state 2 20 knots (1850 RPM)

Max idle speed 6 knots (600 RPM)

Fuel capacity (diesel) 394 gal.

Range at cruise, sea state 0 200 NM

1 (Rev-0)

00000_1215_FLT

REC_00000_FLT_Boats @ Commercial Facility (0914)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting boat repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and

'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is

Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.2 Contractor-provided fire extinguishers. The Contractor shall provide portable fire extinguishers.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec

0000, in accomplishing the following task:

Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec

6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes

(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at

Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC

Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable

Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3 (Rev-0)

3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is _________.

3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:

Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.

National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an

NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.

Air Emission Permit: Unit has a Air Emission Permit which requires unit-specific procedures be followed for the emissions of VOCs and hazardous air pollutants.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The

Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility

Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System

(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste

Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the

Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the

Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For

Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy.

3.6.1 Coast Guard turn-over preparation. The Contractor shall be aware that, upon arrival, after haul out, and prior to departing the Contractor’s facility, the Coast Guard crew shall be allowed to accomplish various tasks in preparation for the turn-over of the boat to the Contractor. The following conditions apply to this paragraph:

4 (Rev-0)

3.6.1.1 The Coast Guard requires a maximum of three days at the beginning of the contract, and three days at the end to accomplish various tasks.

3.6.1.2 The Contractor may commence/continue work during these time frames.

<<APM Note: Paragraph 3.6.1.3 pertains to 47’ MLB only. For all other SBPL assets delete this paragraph.>>

3.6.1.3 Coast Guard personnel will disconnect the Detroit Diesel Electronic Control (DDEC) System and any other electronic equipment, as required to avoid damage to systems arising from hotwork on the vessel during the availability.

3.6.1.4 Coast Guard personnel will remove the transducers after initial haul-out and reinstall prior to re-floating the vessel.

3.6.1.5 The Unit will contact the servicing ESD or ESU to setup removal/installation of the transducer if Unit personnel are unable to accomplish this task.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for

Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel

Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-

STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line

Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:

SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE

WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing

Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

6 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

7 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

8 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Place Surface Profile

Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

9 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

10 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

11 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

COATING MFG PRODUCT NAME

BATCH

INDUCTION

TIME

COATING SYSTEM SEQUENCE

(PRIMER/TOUCHUP/3RD COAT, ETC.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT 1 2 3 4 5

AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic

Pull-Off (Type I/Banana) Gauge Is

Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,

ROLLED)

AVERAGE DFT

12 (Rev-0)

07400_AKP_1114_BOAT_FLT

WORK ITEM 1: General Welding, Provide

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to provide general welding.

1.2 Government-furnished property.

TABLE 1 – WELD AREAS

DESCRIPTION LOCATION

Hairline crack in weld FR 17, Longitudinal 9

None.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 4934, SWBS 074, Sep 2014, Small Boat

Diagrams for Hotwork

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

13 (Rev-0)

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

None.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Requirement. The Contractor shall provide general welding, including but not limited to, fabrication, brazing, inspection, plate renewal, crack repair, overlay, and associated processes on

Coast Guard vessels and equipment in accordance with TP 4934 and SFLC Std Spec 0740.

3.3 Bidding. The Contractor shall ensure for bidding purposes this specification will be broke down by the following:

One linear foot of welding/brazing.

Four square inches of clad/overlay welding.

One hour of fabrication.

One square foot of plate renewal.

TABLE 1 – PLATE TYPE

STEEL PLATE ALUMINUM PLATE

THICKNESS WEIGHT

PER

SQFT.

TYPE/GRADE THICKNESS WEIGHT

PER

SQFT

TYPE/ALLOY

3/16 (.1875) 7.66 lb

1/4 (.250) 10.21 lb 1/4 (.250) 3.53 lb

5/16 (.3125) 12.76 lb 5/16 (.3125) 4.41 lb

3/8 (.375) 15.31 lb 3/8 (.375) 5.29 lb

1/2 (.500) 20.42 lb 1/2 (.500) 7.06 lb

3.4 Touch-up preservation, general. The Contractor shall prepare and coat all new and disturbed exterior and interior surfaces, as applicable, to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13 (Touch-ups and minor coating repairs.)

14 (Rev-0)

4. NOTES

This section is not applicable to this work item.

15 (Rev-0)

11000_RDW_0414_47MLB

WORK ITEM 2: Ultrasonic Testing (U/W Body) Shots, Perform

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to take 70 UT shots at pre-determined locations designated by Figure 1 and Figure 2. Coast Guard has the right to ask contractor for 30 additional UT shots at the Coast Guard Inspectors request.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 47B-MLB 110-201, Rev D, Transom

Coast Guard Drawing 47B-MLB 110-500, Rev H, Shell Plating

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

OTHER REFERENCES

ASTM International (ASTM) E797, 2005, Standard Practice for Measuring Thickness by

Manual Ultrasonic Pulse-Echo Contact Method

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

3.2 (UT measurements)

3.1.2 Tech Rep.

Not applicable.

16 (Rev-0)

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences).

3.2 UT measurements. The Contractor shall perform a total of up to 100 UT measurements of

U/W hull surfaces, in locations designated by figures 1, 2 and the Coast Guard Inspector, using

Coast Guard Drawings 47B-MLB 110-500 and 47B-MLB 110-201 for guidance, in accordance with SFLC Std Spec 0740, Appendix C. Record all measurements on a copy of figure 3 and use a copy of figure 4 (if needed) to show all additional locations selected for measurement. Submit a

CIR, to also include the marked up figures.

4. NOTES

4.1 Coast Guard Personnel. Coast Guard Personnel will operate all vessel equipment and machinery.

17 (Rev-0)

FIGURE 1 - STANDARD UT TESTING LOCATIONS (PORT & STARBOARD)

18 (Rev-0)

FIGURE 2 – STANDARD UT TESTING LOCATIONS (TRANSOM)

19 (Rev-0)

20 (Rev-0)

FIGURE 3 – STANDARD U/W BODY PLATING MEASUREMENTS TABLE

21 (Rev-0)

FIGURE 4 - ADDITIONAL U/W BODY PLATING MEASUREMENTS TABLE

22 (Rev-0)

11000_0815_FLT

REC_11000_UWHIB_FLT_47' MLB (ALL) (1213)

WORK ITEM 3: Hull Plating (U/W Body), Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect/survey the vessel’s Under Water (U/W) hull plating, including U/W appendages and coating system.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 47B-MLB 110-500, Rev H, Shell Plating

Coast Guard Drawing 47B-MLB 631-020, Rev K, Paint Schedule

Coast Guard Drawing 47B-MLB 801-002, Rev -, Docking Plan

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

OTHER REFERENCES

ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry

Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning

Means

The Society for Protective Coatings (SSPC), January 2015, Paint Application

Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating

Thickness Requirements

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

23 (Rev-0)

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspection. The Contractor shall accompany the Underwater Hull Inspection Board (UWHIB) in the performance of the below inspection tasks, as applicable, using the drawings listed in

Section 2 (References) as guidance. The Contractor shall provide the following, to facilitate the

UWHIB in assessing the condition of the designated U/W hull components and systems:

A hull repair supervisor and a marker.

Temporary staging and other necessary equipment, as applicable, for ensuring safe access to all areas of the U/W hull.

NOTES

1. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

2. Some of the components and/or systems addressed in this work item may not be applicable to all vessel classes.

3.2.1 Hull plating.

3.2.1.1 The Contractor shall inspect the condition of the hull plating (including thruster tunnel plating, as applicable), for the presence of marine growth, deformation, and any evidence of major corrosion or electrolytic action.

3.2.1.2 The Contractor shall inspect the hull and keel areas, report on the condition of butt-welded seams, doubler plates, lap seams, and for any signs of damaged plating or unusual waviness in the plating.

3.2.2 Sea chests and all other cooling system intake components. The Contractor shall inspect all sea chests, tunnels, hull openings, and grates for general appearance, loose, damaged, or missing grates, loose or missing fasteners, condition of sea strainers and lockwire on bolts, marine growth on grating slots, and any obstructions in the openings that might prevent proper suction and discharge of water.

3.2.3 Rudders. The Contractor shall check general condition, condition around the drain plugs, and check for pitting, if any, on the leading and trailing edges.

3.2.4 Propeller and shaft associated components. The Contractor shall inspect the condition of propellers for signs of corrosion, pitting, erosion, fouling, cracks, dings, and nicks by side and

24 (Rev-0) blade; inspect fairwaters, rope guards, shafts, and mechanical seals - look for missing screws, physical damage to the blades, pitting, condition of dunce caps, and condition of securing devices.

3.2.5 Transducers. The Contractor shall check general condition for cuts, cracks, corrosion, and surface defects around the openings. Check transducer securing nuts for tightness, and inspect cables for chafing and other damage.

3.2.6 Zinc anodes.

3.2.6.1 The Contractor shall remove all marine growth and oxide coating from all hull, rudder, shaft strut, sea chest, z-drive, and thruster tunnel zinc anodes, or water jet drives anodes, as applicable, using a light-wire brush.

3.2.6.2 The Contractor shall visually inspect all zinc anodes; check the soundness of mounting strap and stud welds, missing fasteners, and percentage of remaining material.

3.2.7 Coating system inspections. The Contractor shall accomplish the below inspections, in conjunction with the underwater hull inspection conducted by the Underwater Hull Inspection

Board (UWHIB). Document the condition found as “Partial - Condition A”, “Partial - Condition

B”, “Partial Condition C”, or “100%”, as applicable (see 4.1 (Definitions)). Submit a CFR.

NOTE

The following inspections are for determining the existing condition of the coating system for the underwater body surfaces, which are deemed “Critical-coated” surfaces; they must be carried out by a

SSPC-QP-1 certified contractor/sub-Contractor or a NACE Inspector

– see SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).

3.2.7.1 Visual. Perform a visual inspection of the existing U/W body coating system.

3.2.7.2 Dry film thickness (DFT) measurements. Take total DFT measurements of the U/W body coating system, in accordance with SSPC-PA 2.

4. NOTES

4.1 Definitions.

4.1.1 "Partial – Condition A”: The condition that exists where the substrate is exposed in up to

33% of the entire U/W body.

4.1.2 "Partial - Condition B": The condition that exists where the anticorrosive (AC) undercoating system has incurred damage, but, the u/w body hull substrate is not exposed in any location.

4.1.3 "Partial - Condition C”: The condition that exists where damage is confined to the antifoulant (AF) topcoating; the epoxy undercoating system is not exposed in any location.

25 (Rev-0)

4.1.4 "100%”: The condition that exists where more than 33% of the U/W body hull substrate is exposed.

4.2 UWHIB convention. The COR will convene the UWHIB as soon as possible after the vessel has been dry-docked and before any work (except U/W hull cleaning/wash down) is performed on the U/W hull and appendages.

26 (Rev-0)

11021_AKP_0114_47MLB

WORK ITEM 4: Rub Rail, Inspect – In Place

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to visually inspect the condition of the entire rub rail system in place.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 47B-MLB 611-020, Rev L, Foam Fender Arrangement

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3360, SWBS 555-671, Sep 2012, Manufacturer's

Instruction Book - SWBS Group(s) 555-671, SWBS 611, Section A, Hull Fittings

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

3.2 (Inspections).

3.2.1 (Edge sealer).

27 (Rev-0)

3.1.3 Protective measures - general. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences).

3.2 Inspections. The Contractor shall clean and visually inspect, in place, each rub rail section, as shown on Coast Guard Drawing 47B-MLB 611-020 and in accordance with TP 3360 for any damage including but not limited to cracks, gouging, deformation, etc. Submit a CIR.

3.2.1 Edge sealer. The Contractor shall visually inspect the edge sealer system on the top and bottom surfaces adjacent to the shell plating for continuity and effective bond to the rub rail and shell plating surfaces. Submit a CIR.

3.3 Fastener tightness. The Contractor shall verify the tightness of each rub rail fastener using

TP 3360 for guidance. Ensure that all fasteners found loose are tightened to match the torque of surrounding fasteners.

CAUTION

Do not use an impact wrench to tighten nuts as over-torque may crush the fenders and/or PVC inserts.

28 (Rev-0)

11031_AKP_0214_47MLB

WORK ITEM 5: Bulkhead Penetrations, Frame 5, Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect the bulkhead surfaces at Frame 5 and all piping system penetrations.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 47B-MLB 110-206, Rev F, Transverse Bhd Fr 5

Coast Guard Drawing 47B-MLB 201-010, Rev L, Machinery Arrangement

Coast Guard Drawing 47B-MLB 243-010, Rev U, Propulsion Shafting Bearings and

Seals

Coast Guard Drawing 47B-MLB 505-020, Rev Y, Piping Arrangement in Hull

Coast Guard Drawing 47B-MLB 635-010, Rev C, Hull Insulation

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General.

3.1.1 CIR.

29 (Rev-0) coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std

Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

Bulkhead insulation

Cardan shafts and shaft seals

Propeller shafts and shaft seals

Various piping system penetrations

Watertight door

Main engines

Gearboxes

3.2 Removals. The Contractor shall remove a 6 inch by 6 inch area of bulkhead insulation from around each penetration on both sides of frame 5 in accordance with Coast Guard Drawings 47B-

MLB 110-206, 47B-MLB 201-010, 47B-MLB 243-010, 47B-MLB 505-020, and 47B-MLB 635-

010. The Contractor shall dispose of the removed insulation in accordance with all applicable

Federal, state, and local regulations. Retain the barrier material (black material behind the…