HSCG40-16-Q-P30B48

Amendment Number A00005

14A. This Amendment is issued to answer the following questions submitted in response to this solicitation:

Question 1. WORK ITEM D-001 General Welding, Provide.

Paragraph 3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).

Paragraph 3.3 Bidding. The Contractor shall ensure for bidding purposes this specification will be broke down by the following:

• One square inch of clad welding

• One square foot of plate renewal

Will all interferences be covered under a change request since we do not know where the repairs will be made?

Answer. Yes.

Question 2. WORK ITEM D-002: Ultrasonic Testing (U/W Body) Shots, Perform

1.1 Intent. This work item describes the requirements for the Contractor to take 70 UT shots at pre-determined locations designated by Figure 1 and

Figure 2. Coast Guard has the right to ask contractor for 30 additional UT shots at the Coast Guard Inspectors request. UT Shots are to be taken after paint has been removed from substrate.

Are you asking to have us take the shots after the bottom has been sandblasted under WORK ITEM 4: U/W Body, Preserve (100%)?

Answer. If the 70 predetermined spots are cleaned properly to get an accurate reading from the UT shots before sandblasting that is acceptable.

HSCG40-16-Q-P30B48

Amendment Number A00005

14B. The date and time established for receipt of proposals is extended to

May 16, 2016 at 12:00 PM EST. All other terms and conditions remain unchanged.

REQUESTS FOR CLARIFICATION WERE TO BE RECEIVED BY

25 APRIL 2016. NO FURTHER REQUESTS FOR CLARIFICATION

WILL BE ANSWERED.

(END OF AMENDMENT NUMBER A00005)