ALC VENDOR SURVEY for Solicitation.doc
DOC document 119 KB Posted
- Attached to
- Repair of H65 Firewalls
- Solicitation number
- HSCG38-12-Q-200001
About this file
ALC Vendor Survey
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions | — | |
| Questions | — | |
| Offeror Checklist_HSCG38-12-Q-200001.doc | DOC document | |
| Questions | — | |
| HSCG38-12-Q-200001 - Technical Factors.xls | XLS spreadsheet | |
| Statement of Work.pdf | ||
| Terms and Conditions HSCG38-12-Q-200001.pdf | ||
| HSCG38-12-Q-200001_Quote Sheet.xlsx | XLSX spreadsheet | |
| Service Contract Act Requirment Form.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALC VENDOR SURVEY
QUALITY MANUAL:
1. Was a copy of the Quality Manual provided?
Yes No N/A
Attachments/Notes:
2. Is the contractor FAA Certified? Certification # __________________ Date: _________
Yes No N/A
Attachments/Notes:
3. Is the contractor ISO Certified? Certification # __________________ Date: _________
Yes No N/A
Attachments/Notes:
4. Is the contractor OEM certified?
Yes No N/A
Attachments/Notes:
5. If the contractor is FAA certified, has the contractor been reprimanded or cited for any violations within the past 5 years? If so please provide specifics on the citations.
Yes No N/A
Attachments/Notes:
QUALITY SYSTEM:
1. Is there a Quality Control (QC) system in place that controls engineering, manufacturing, quality, and product support activities utilized to obtain and maintain FAA certifications?
Yes No N/A
Attachments/Notes:
2. Is there a defined separation between production and quality control?
Yes No N/A
Attachments/Notes:
3. Do QC personnel have the authority to stop production due to a non-conformity?
Yes No N/A
Attachments/Notes:
SUB CONTRACTOR:
1. Are there procedures for selection of sub-contractor?
Yes No N/A
Attachments/Notes:
2. Are sub-contractors audited? If so, how (i.e. mail or site visit) and how often?
Yes No N/A
Attachments/Notes:
3. Are sub-contractor records stored and accessible?
Yes No N/A
Attachments/Notes:
PRODUCTION:
1. Are there instructions, specifications in place to perform the required work?
Yes No N/A
Attachments/Notes:
2. Is there adequate tooling and test equipment available to perform the work?
Yes No N/A
Attachments/Notes:
3. Are materials and parts properly identified and tagged?
Yes No N/A
Attachments/Notes:
4. Are parts or equipment adequately stored and protected during the repair or manufacturing process?
Yes No N/A
Attachments/Notes:
5. Are technicians working from current instructions or drawings? If so, how are they controlled (i.e., time stamps)?
Yes No N/A
Attachments/Notes:
6. Are there in process inspections for key operations? How are they determined and identified?
Yes No N/A
Attachments/Notes:
7. Are final approval and release to service personnel defined?
Yes No N/A
Attachments/Notes:
8. Does the contractor provide FAA Airworthiness Form 8130 or a Certificate of Conformance (COC) for completed parts or components?
Yes No N/A
Attachments/Notes:
NONDESTRUCTIVE TESTING (NDT):
1. Does the contractor have in-house NDT capabilities?
Yes No N/A
Attachments/Notes:
2. Does the facility have a NDT manual?
Yes No N/A
Attachments/Notes:
3. Is the equipment sufficient to perform NDT inspections and calibrated?
Yes No N/A
Attachments/Notes:
4. Are magnetic particle solvents measured for weight and density? How often?
Yes No N/A
Attachments/Notes:
5. Are training, qualifications and certifications of NDT personnel performed IAW with criteria such as: SNT-TC-1A recommended Practice for Personnel Qualifications and certification for NDT Testing, MIL-STD 410E, ATA 105, other).
Yes No N/A
Attachments/Notes:
6. Are training requirements identified?
Yes No N/A
Attachments/Notes:
7. Is there a procedure for re-certification of NDT personnel?
Yes No N/A
Attachments/Notes:
Preventative Corrective Actions:
| 1. Is there an alcohol and drug testing program in place? |
| Yes No N/A |
Attachments/Notes:
2. Has your organization received any State or Federal EPA/OSHA citations over the past 2 years?
Yes No N/A
Attachments/Notes: