Scope_Of_Work_for_thE_FRONT_TILES_x1_11-28-16.docx
DOCX document 2 MB Posted
- Attached to
- Tile removal at Sta Fort Myers Beach
- Solicitation number
- HSCG28-17-Q-PMW045
About this file
SOW for tile work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Station_Fort_Myers_Lead_Screening_Report.pdf | ||
| USCG_Fort_Myers_Beach_Asbestos_Survey_Report_.pdf | ||
| 1442_Sta_FT_Myers_Tile.pdf | ||
| Construction_Clauses.docx | DOCX document | |
| FL256.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CG STA FORT MYERS
FORT MYERS, FL
SCOPE OF WORK FOR
PN:8403262
1. 1ST AND 2nd LEVEL BREEZEWAYS, 1st LEVEL SIDE STEPS, LANAI EXIT STEPS, AND ENTRY WAY
1st deck breezeway and side steps
Main entry stair
Main entry tiles
2nd deck breezeway
LANAI SIDE STAIRS
GENERAL REQUIREMENTS
PART 1 – General:
Coast Guard Station Fort Myers in Fort Myers Beach, FL is accepting proposals for qualified Individuals or firms to complete the removal of the stations outside tile, grind smooth and repair and prep existing area with a textured color finish. We request contractors within a 100 mile radius to furnish labor, materials, and equipment to replace above noted items. Prior to submitting a quote, it is mandatory to examine the SOW and is highly recommended to visit the facility to take field measurements, evaluations, etc, and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior starting the work at the Coast Guard Station Fort Myers facilities in Fort Myers Beach, FL. The POC is: MKC Nicholas Lamb, work (239) 707-1525; email: Nicholas.A.Lamb@uscg.mil.
PART 2 – Location:
CG STA Fort Myers 719 San Carlos Dr
Fort Myers Beach, FL 33931
PART 3 – Facility Operating Hours:
The facility shall remain in operation throughout the service. Contractor access to the service site shall be limited to the following: 8:00am to 4:00pm, Monday through Friday, excluding holidays. Access to the site shall not be permitted on the weekends without prior approval from the Coast Guard (COR).
PART 4 – Security Requirements
1. Contractor shall provide a list of names to the Coast Guard (COR) for access to the base.
PART 5 – Notification of Start and Completion of Work
1. Contractor shall notify Coast Guard one week prior to start of work.
2. Contractor shall submit daily reports to the POC listed above.
PART 6 – Safety
1. During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by OSHA Safety and Health Standards, 29 CFR part 1926 – Safety and Health Regulations for Construction.
PART 7 – Contractor Responsibilities:
All work shall be done in compliance with applicable codes
1. Tile take up, then grind smooth in 1st floor breezeway, 2nd floor breezeway, front entry, front entry steps and 1st floor breezeway side steps.
2. Floor prep- repair and prep existing areas for a textured finish
3. Apply a single color textured finish to the 1st and 2nd floor breezeway areas and entry using 1 ct colors
4. Apply single color texture finish on steps, include steps in front and both sides.
PART 8– Cleanup:
1. Upon completion of each day all debris shall be removed and disposed of immediately from government property at the contractor’s expense.
2. The contractor shall not use Coast Guard dumpsters or any waste receptacles for disposal of debris.
3. Disposal of HAZMAT shall be in accordance with federal, state and local regulations.
PART 7 – Final Inspection and Acceptance:
1. When the contractor has completed all of the work, they shall notify the Coast Guard (COR) for a final inspection.
2. Contractor shall deliver all applicable warranties and paperwork.
3. If the work is accepted, the contractor shall submit to the Coast Guard (COR):
· Contractor’s notice of completion.
· Contractor’s construction daily reports signed and dated.
Submittal of invoice(s) information will be provided once award of contract has been made.
U.S. Coast Guard Hours of Operation:
8:00AM – 4:00PM (EST).
image3.jpeg image4.jpeg image5.jpeg image6.jpeg image1.jpeg image2.jpeg
File details come from the government source that posted it. Updated .