Date Notes

17‐Sep‐12 Gen A (#1) and Gen B (#2) start‐up inspections completed.

1‐Mar‐15 Gen B (#2) stator failure.

5‐Mar‐15 Contractor completed preliminary Investigation and minor PMS. Gen B (#2) stator needs to be replaced. Contractor modified GENSET controls to allow one

GENSET to take the load if other GENSET is not able to come online.

20‐Apr‐15 Contractor replaced stator on Gen B (#2) and Completed Major PMS. Stator material purchase covered under warranty.

1‐Nov‐15 Gen B (#2) stator failure.

18‐Nov‐15 Contractor completed investigation and major PMS. Contractor indicated that

Gen B (#2) stator failed again. Contractor incurred additional expense for delayed flight (and per diem) on return trip.

4‐Dec‐15 Stator purchase for Gen B (#2) (non‐warranty).

10‐Feb‐16 Contractor completed stator replacement for Gen B (#2) and major PMS.

12‐May‐16 Contractor completed major PMS. Contractor recommended 5 year maintenance, engine block heater replacement and battery replacement for next maintenance cycle.

2‐Oct‐16 USCG personnel evacuated for Hurricane Matthew. GENSET placed online prior to departure. Gen A (#1) "no start fault code" did not allow Gen A(#1) to turn on prior to departure.

8‐Oct‐16 Gen A (#1) troubleshot and placed back on‐line by TDY FACENG personnel.

21‐Nov‐16 Contractor completed 5 year preventative maintenance.

28‐Nov‐16 GI crew passed that Gen B (#2) recorded high voltage shutdown alarms.

29‐Nov‐16 GENSET failed to take power after loss of phase from city power. Gen A (#1) grounded and would not start and Gen B (#2) shut down for low voltage alarm.

Notified contractor and requested assistance to investigate and troubleshoot.

6‐Dec‐16 Contractor completed on‐site investigation and reported that Gen A (#1) failure occurred due to ground in windings and Gen B (#2) failure occurred due to stator. Cause of failure is attributed to environment (coastal humidity/salt plus morton salt).

17‐Jan‐17 Power out for 15 minutes (no back‐up power).

23‐Jan‐17 Power out for 15 minutes (no back‐up power).

24‐Jan‐17 Power out for 4 hours (no back‐up power).

26‐Jan‐17 Power out for 4 hours (no back‐up power).