Solicitation HSCEDM-17-Q-00019 Phone Booths Response to Vendor Questions
| Question No. |
| Document |
| Page |
| Section Title |
| Paragraph |
| Question |
| Response |
| 1 |
| SOW |
| 3 |
| 2.0 General Scope |
| 2.2 Privacy Testing |
| Please confirm whether there are any special requirements regarding ventilation. Please confirm whether there is a preference between “natural” versus mechanized ventilation. |
The government has no preference between natural and mechanical, the government needs the contractor to meet the requirements stated in section 2.2 for sound testing. Ventilation should be provided, while also allowing for sufficient privacy (sound dampening).
| 2 |
| SOW |
| 3 |
| 2.0 General Scope |
| 2.2 Privacy Testing |
| Define immediate area of booth and will there be multiple units side by side? |
The ‘immediate area’ of a given booth will depend on the layout of each facility and how the booths are installed there. In some cases, booths may be installed side by side. The essential aim is that any sounds emerging from a booth are muffled and without sufficient clarity to discern the caller’s words or language.
| 3 |
| SOW |
| 4 |
| 2.0 General Scope |
| 3.1 Booth Requirements |
| On overall dimensions 3 and 4 depending on booth type it specifies 6” space between floor and bottom of plexiglass paneling and 6” space between top of plexiglass paneling and removable cover plate which will definitely compromise privacy as sound will travel between these spaces. Is there another option for this? |
The spacing outlined here is for ventilation. Designs for Booths without the 6” spacing will be accepted as long as there is sufficient ventilation integrated otherwise and the overall height remains 6’- 10”.
| 4 |
| SOW |
| 5 |
| 3.0 Special Requirements |
| 3.1.3 Design |
| Will the 60 day delivery be provided on acceptance of final design by ICE? |
The 60-day delivery window starts once the winning contract is awarded. The final design has to be submitted as a part of the proposal packet
| 5 |
| SOW |
| 4 |
| 3.1 Booth requirements |
| Table-Overall Dimensions - Common |
| Will installer or site provide booth delivery format? |
Yes, the installer/site will provide the specific delivery format as stated in section 5.1 Delivery confirmation.
Question No.
| Document |
| Page |
| Section Title |
| Paragraph |
| Question |
Response
| 6 |
| SOW |
| 4 |
| 3.1 Booth requirements |
| Table-Overall Dimensions - Common |
| Please confirm whether the Item 1. Booth doorway width: 34” refers to the actual opening width of the doorway, exclusive of the surrounding frame. |
The 34” refers to the actual opening width of the doorway, excluding the frame.
| 7 |
| SOW |
| 4 |
| 3.1 Booth requirements |
| Table - Overall Dimensions – Three sided Booth |
| Please confirm whether the Item 2. Booth side panel depth: 35” refers to the overall depth of the side pane, inclusive of any connecting paneling. |
The 35” refers to the depth, excluding the frame.
| 8 |
| SOW |
| 4 |
| 3.1 Booth requirements |
| Table- Overall Dimensions |
| Please confirm whether the Item 3. Booth height: 5’-10” + 6” space between floor and bottom of plexiglass paneling and removable cover plate (total 6’-10”). |
Question: Is ICE envisioning 6” of air space, in these areas, or 6” of “filled” paneling? Are these 6” allocations geared toward accommodating the required ventilation?
The 6” inches referred for both top and bottom of the space is for 6 inches of air space ventilation.
Yes, the 6 inches are for accommodating the required ventilation and the overall height remains 6’- 10”.
| 9 |
| SOW |
| 4 |
| 3.1 Booth requirements |
| Table- Frame |
| Alkyd enamel paint is specified as the preferred coating for the equipment. Our preference and recommendation is Power Coating, which is more protective and will contribute to the longevity of the equipment. Please confirm whether or not ICE will consider Power Coating as an alternative paint? |
Yes. ICE will consider Power Coating as an alternative to Alkyd enamel paint.
| Question No. |
| Document |
| Page |
| Section Title |
| Paragraph |
| Question |
Response
| 10 |
| SOW |
| 5 |
| 5.0 Delivery |
| 5.1 Delivery Conformation |
| Please confirm whether or not the successful contractor may be responsible for storing the forty (40) booths for longer than the sixty (60) day production/delivery timeframe referenced in section 4.0- Period of Performance? |
Yes. Should ICE or Facility require delivery take place beyond the sixty (60) days allotted for completion and delivery of booths, vendor shall be responsible for the additional storage time.
| 11 |
| SOW |
| 5 |
| 3.1.3 |
| Design |
| Please confirm whether or not detail illustrations (i.e. “shop drawing”) are required to be included in the RFQ submission, for all proposed booths? |
Yes. Design schematics (including exact dimensions) of the three booths are required in the RFQ submission.
| 12 |
| SOW |
| 6 |
| 5.2 Locations |
| Chart |
| Who will be responsible for installation at sites? |
Another party will be responsible for the installation at sites.
| 13 |
| SOW |
| 4 |
| 3.1 Booth Requirements |
| Chart |
| 3 sided booths should have a door, no back, free standing. “Blind” anchor points into the walls are nearly impossible. This requires full engineering changes not included in the initial quote. |
3-sided Booths will maintain their frame which will be used to anchor into the wall and floor
| 14 |
| SOW |
| 5 |
| 5.0 Delivery |
| 5.1 Delivery Conformation |
| If facility decides to not take delivery within the 60 days stipulated in the RFQ, how will this be handled? |
Should ICE or Facility require delivery take place beyond the sixty (60) days allotted for completion and delivery of booths, vendor shall be responsible for the additional storage time.