JAMES_RANKIN_(WLM_175)_DD_JCC_17R2.doc

DOC document 2 MB Posted

Attached to
DRYDOCK REPAIRS FOR THE USCGC JAMES RANKIN
Solicitation number
HSC8517QP45972
Issued by

About this file

Revised Specification CGC JAMES RANKIN

View the file

Other files

File Type Posted
3653_245_P.pdf PDF
JAMES_RANKIN_SPEC_REV3.doc DOC document
Amendment_0003_CGC_JAMES_RANKIN.docx DOCX document
3653_245_B.pdf PDF
Amendment_0002_CGC_JAMES_RANKIN.pdf PDF
175-WLM_528_1_2_-_E.PDF PDF
175-WLM_528_1_3_-_E.PDF PDF
175-WLM_528_1_4_-_E.PDF PDF
175-WLM_528_6_1_-_G.PDF PDF
175-WLM_528_1_5_-_E.PDF PDF
175-WLM_528_1_1_-_E.PDF PDF
A0001JAMESRANKIN.pdf PDF
QUESTION_AND_ANSWERS_-_AMEND_0001.doc DOC document
JAMES_RANKIN_REV1.pdf PDF
JAMES_RANKIN_SECTION_B.xls XLS spreadsheet
ATTACHMENT_2_-_JAMES_RANKIN_SPECS.pdf PDF
Attachment_5-_USCG_Ombudsman_Notice_JAMESRANKIN.doc DOC document
JAMES_RANKIN_FY17.pdf PDF
Attachment_3_Past_Performance_Information_Form_JAMESRANKIN.doc DOC document
Attachment_4_Request_for_ClarificationJAMERANKIN.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC JAMES RANKIN (WLM 555)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2017

Developed By: Jonathan C Copley (Rev-2, 22 March 2017)

TABLE OF CONTENTS

ivRevisions Record vConsolidated List of References xConsolidated List of Government-furnished Property xivConsolidated List of Critical Inspection Items xviPrincipal Characteristics - TENDER

1General Requirements

11WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing

15WORK ITEM 2: Hull Plating (U/W Body), Inspect

19WORK ITEM 3: Hull Plating (Freeboard), Ultrasonic Testing

21WORK ITEM 4: Hull and Structural Plating (General) -10.2-Pound Steel, Renew

23WORK ITEM 5: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew

25WORK ITEM 6: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew

27WORK ITEM 7: Hull And Structural Plating (General) - 20.5-Pound Steel Plate, Renew

29WORK ITEM 8: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew

31WORK ITEM 9: Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew

33WORK ITEM 10: Appendages (U/W), Leak Test

36WORK ITEM 11: Appendages (U/W) - Internal, Preserve

38WORK ITEM 12: Chain Locker, Clean, Inspect, and Preserve 100%

41WORK ITEM 13: Tanks (Mp Fuel Stowage And Overflow), Clean, Inspect, Blast and Coat

45WORK ITEM 14: Voids (Non-Accessible), Leak Test

48WORK ITEM 15: Voids (Non-Accessible), Internal Surfaces, Preserve

50WORK ITEM 16: Tanks (Potable Water), Clean, Inspect, and Preserve “100%”

55WORK ITEM 17: Tanks (Ballast), Clean and Inspect

58WORK ITEM 18: Tanks (Dirty Oil and Waste), Clean and Inspect

61WORK ITEM 19: Hydraulically Operated Cargo Hatch, Inspect and Service

65WORK ITEM 20: Z-Drive Propulsion Units, Overhaul

74WORK ITEM 21: Sw Heat Exchangers; Clean, Inspect And Hydro

79WORK ITEM 22: Circuit Breakers (60 Hz), Inspect and Test

84WORK ITEM 23: Fathometer Transducer, Renew

88WORK ITEM 24: Sea Bay, Clean, Inspect, and Preserve “100%”

91WORK ITEM 25: Crane and Deck Hydraulic System, Flush

95WORK ITEM 26: Thruster Unit (General), Overhaul

99WORK ITEM 27: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test

104WORK ITEM 28: Hydraulic Chain Stoppers, Inspect And Service

108WORK ITEM 29: Hydraulic Crossdeck Winches, Inspect And Service

114WORK ITEM 30: Hydraulic Inhaul Winch, Inspect And Service

123WORK ITEM 31: Anchor Windlass, Inspect And Service

127WORK ITEM 32: Anchor Chain(s) and Ground Tackle, Inspect and Repair

134WORK ITEM 33: Buoy Crane, Inspect and Service

143WORK ITEM 34: Tanks (Ballast), Preserve “100%”

146WORK ITEM 35: Tanks (Ballast), Preserve “Partial”

149WORK ITEM 36: Tanks (Dirty Oil and Waste), Preserve “100%”

152WORK ITEM 37: Tanks (Dirty Oil and Waste), Preserve “Partial”

155WORK ITEM 38: Decks – Exterior (Buoy or Construction Deck), Preserve 100%

158WORK ITEM 39: U/W Body, Preserve (100%)

162WORK ITEM 40: Hull Plating Freeboard, Preserve “100%”

166WORK ITEM 41: Cathodic Protection / Zinc Anodes, Renew

169WORK ITEM 42: Drydock

173WORK ITEM 43: Temporary Services, Provide - Cutter

176WORK ITEM 44: Sea Trial Performance, Support, Provide

180WORK ITEM 45: Power Assisted Griping System, Remove

185WORK ITEM 46: Buoy Crane Main Winch, CT Function, Remove

193WORK ITEM 47: Hot Water Accumulator Tanks, Clean and Inspect

197WORK ITEM 48: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift

203WORK ITEM 49: Tanks (MP Fuel Service), Clean, Inspect, Blast and Coat

207WORK ITEM 50: Tanks (Lube Oil), Clean and Inspect

211WORK ITEM 51: Compressed Air System Refrigerated Air Dryer, Replacement

219WORK ITEM 52: QAWT Door, Renew

222WORK ITEM 53: Weathertight Doors, Renew

226WORK ITEM 54: Fuel Oil Gooseneck Vent, Renew

230WORK ITEM 55: Bilges, Preserve

233WORK ITEM 56: Deck Covering, Electrical Matting, Renew

235WORK ITEM 57: Shower Stalls, Renew

239WORK ITEM 58: Deck Covering (Interior Wet/Dry) and Deck Drain, Renew

243WORK ITEM 59: Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect

247WORK ITEM 60: Underwater (Speed) Log Transducer(s), Inspect and Service

250WORK ITEM 61: Sea Strainers - Duplex (All Sizes), Overhaul

254WORK ITEM 62: Sea Strainers - Simplex (All Sizes), Clean and Inspect

257WORK ITEM 63: Anti-Fatigue Matting, Install

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-2) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE
08 March 2017
1
49
Updated intent to reflect cleaning, inspection, blasting , and coating of the MP fuel service tanks and removed A-team note.
15 March 2017
2
01
Updated paragraph 3.3.2 to allow work to be completed within 14 days and Updated paragraph 3.2 to allow for 10 days with report due 03 days after side scan is completed.
21 March 2017
2
54
Changed UT shots in WI 54 to 100, updated Table 1 to include correct location and length, and updated paragraph 3.4 to reflect correct length and location.
22 March 2017
2
56
Removed paragraph 3.4.
22 March 2017
2
61
Removed paragraph 3.1.5
22 March 2017
2
62
Clarified 3.6 for preservation of interior surfaces to include interior surfaces of the vessel. Preservation of the sea strainers should be the exterior surfaces of the strainer.

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover Coast Guard Drawing 175 WLM-167-001, Rev L, Structural Closures Coast Guard Drawing 175 WLM 184-001, Rev -, V850 Transducer Adapter Ring Coast Guard Drawing 175 WLM 201-001, Rev C, Machinery Spaces Arrangement Coast Guard Drawing 175 WLM 243-002, Rev F, Propulsion Shaft Arrangement Coast Guard Drawing 175 WLM 245-001, Rev A, Propeller Coast Guard Drawing 175 WLM 256-001, Rev J, Seawater Cooling System Diagram Coast Guard Drawing 175 WLM 256-003, Rev D, Seawater Cooling System, Fr 61 Fwd Blocks 910, 920, 930 Coast Guard Drawing 175 WLM 256-004, Rev J, Seawater Cooling System A&D, Hull Blks 940-970 Coast Guard Drawing 175 WLM 256-005, Rev -, Z-Drive Lube Oil Heat Exchanger Tube Bundle, Replacmnt & Piping Mods Coast Guard Drawing 175 WLM 256-012, Rev B, ASW System Piping Modifications Coast Guard Drawing 175 WLM 256-013, Rev -A, Sea Bay Thermometer Probe Install Coast Guard Drawing 175 WLM 320-001, Rev AF, Electrical One Line Diagram

Coast Guard Drawing 175 WLM 320-002, Rev G, Power System Deck Plan Frame 24 Fwd, Hull Blocks 910 & 901 Coast Guard Drawing 175 WLM 320-009, Rev R, Power Sys Elem Wiring Diagram Coast Guard Drawing 175 WLM 330-002, Rev F, Lighting System Fr 24 Forward, Hull Blocks 910 & 901

Coast Guard Drawing 175 WLM 437-007, Rev P, Buoy Dk Control Sys Block, Iso & Elem Wrg Diag Coast Guard Drawing 175 WLM 505-003, Rev B, Sea Connection Arrangements Coast Guard Drawing 175 WLM-506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagrams Coast Guard Drawing 175 WLM 512-005, Rev A, Hvac A & D, Frame 6 Forward, Hull Block 901

Coast Guard Drawing 175 WLM 512-006, Rev D, Hvac A & D, Frame 24-6, Hull Block 910

Coast Guard Drawing 175 WLM 512-013, Rev B, Hvac Std Details & General Instructions

Coast Guard Drawing 175 WLM 528-002, Rev M, Weather Deck Drains Diagram Coast Guard Drawing 175 WLM 528-008, Rev E, Plumbing & Deck Drains A & D, Hull Block 970 Coast Guard Drawing 175 WLM 533-001, Rev G, Potable Water System Diagram

Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950 Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank IIP: 7-1 Coast Guard Drawing 175 WLM 549-001, Rev F, Onboard Lubrication Requirements Coast Guard Drawing 175 WLM 551-001, Rev J, Compressed Air System Diagram Coast Guard Drawing 175 WLM 551-005, Rev E, Compressed Air System A/D Hull Block 940, 950 Coast Guard Drawing 175 WLM 556-001, Rev L, Hydraulic System Diagram Coast Guard Drawing 175 WLM 556-004, Rev D, Fwd Hydraulic System A/D Hull Block 920

Coast Guard Drawing 175 WLM 568-001, Rev B, Bow Thruster Arrangement & Detail Coast Guard Drawing 175 WLM 568-002, Rev K, Bow Thruster Detail Coast Guard Drawing 175 WLM 573-001, Rev U, Buoy Deck Arrangement Coast Guard Drawing 175 WLM 573-008, Rev A, Aton Tie Downs

Coast Guard Drawing 175 WLM 573-050, Rev A, Hydraulic Piping Installation for Chain Stopper

Coast Guard Drawing 175 WLM 573-051, Rev B, Chain Stopper Structural Mods for Hydraulic Roller Assembly

Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System Arrgt Coast Guard Drawing 175 WLM 601-001, Rev T, General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-003, Rev N, Booklet of General Plans Coast Guard Drawing 175 WLM 631-002, Rev E, Painting Schedule (552 On) Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection Coast Guard Drawing 175 WLM 634-001, Rev G, Deck Covering Schedule

Coast Guard Drawing 175 WLM 644-001, Rev G, Sanitary Facilities & Laundry Space Arrangement & Details

Coast Guard Drawing 175 WLM 801-001, Rev A, Hull Lines Coast Guard Drawing 175 WLM 801-003, Rev A, Curves of Form Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-015, Rev C, Scantlings, Decks & Platforms Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels Coast Guard Drawing 175 WLM 920-002, Rev L, Hull Block 920 Modules

Coast Guard Drawing 175 WLM 920-003, Rev -, Hull Block 920 Block Assembly Coast Guard Drawing FL-1602-89, Rev , Fleet 26’ x 66” Weathertight Door

Coast Guard Fleet Drawing FL 2605-029, Rev H, Chain Stopper System Rising Sheave Assembly

Coast Guard Fleet Drawing FL 2804-012, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-022, Rev-, Consolidated Visual ID for Cutters (Vessels 65 FT And Over In Length) Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors Manual

Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis

Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch

Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch - Model No. D-WK-787

Coast Guard Technical Publication (TP) 3619, 13-AUG-98, Manufacturers Instruction Book-SWBS Group(s) 324

Coast Guard Technical Publication (TP) 3628, 1/1/1999; Vol 4 of 9, Instruction Manual, Bow Thruster

Coast Guard Technical Publication (TP) 3630, 07-JAN-97, Manufacturers Instruction Book-SWBS Group(s) 573

Coast Guard Technical Publication (TP) 3630, SWBS 573, Section A (573A), Jun 2015, Manufacturer's Instruction Book-SWBS Group 573, Buoy Crane

Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463

Coast Guard Technical Publication (TP) 3631, Section 581-A, Sep 2013, Manufacturer's Instruction Book-SWBS Groups 573-581, Anchor Windlass

Coast Guard Technical Publication (TP) 3653, Jul 2013; SWBS 245, Section A; Z-Drive - Model 1350-H

Coast Guard Technical Publication (TP) 3939, SWBS 573-A, Apr 2007, Rising Sheave Chain Stopper

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard Electrical Cable Test

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior Deck Covering Systems

Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking

Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary Services

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System Components - Health Effects

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing

American Society for Testing and Materials (ASTM) International F1508, 2010, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services

American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and Welding End

ASTM International (ASTM) A53, 2005, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless

ASTM International (ASTM) D1330, 2010 Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means

ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component Adhesives (AN)

Code of Federal Regulations (CFR) Title 29, Part 1915, Section 15, 2007, Shipyard Employment

Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-Petrolatum

Commercial Item Description (CID) A-A-59323, Rev A, Cloths, Cleaning, Low-Lint

Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone DOD-STD-2188, Apr 1987, Babbitting of Bearing Shells

Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert

Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and Weldless

International Organization for Standardization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids – Method for Coding the Level of Contamination by Solid Particles

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves

Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service

Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves

MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418)

MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

MIL-DTL-23549, Dec 2011, Grease, General Purpose

MIL-F-24402, May 1995, Filters (Hydraulic), Filter Elements (High Efficiency), and Filter Differential Pressure Indicators, General Specification

MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)

MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric

MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant

MIL-STD-1622, Nov 2006, Cleaning of Shipboard Compressed Air Systems

MIL-STD-419, Jul 1987, Cleaning and Protecting Piping, Tubing and Fittings for Hydraulic Power Transmission Equipment

National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-PRO-160, Jan 2011, Chapter 16, Cofferdams

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

Surface Forces Logistics Center Time Compliant Technical Order (TCTO) TP2030.1, Buoy Crane Main Winch, CT Function, Remove

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning

Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

20
N
Prop Shaft Seal
NSN: 5330-20-009-3957
2 ea.
25,493.00
20
Y
**Seal Ring, MN Bronze
NSN: 5330-01-F15-4225
2 ea.
2,206.00
20
N
Clutch Overhaul Kit (Original Clutch)
NSN: 2010-01-551-1161
2 ea.
7,959.62
20
N
Clutch Overhaul Kit (New Clutch)
NSN: 2520-01-645-8279
2 ea.
7,959.62
20
N
**O-Ring
NSN: 5331-21-912-4287
2 ea.
7,007.00
20
N
**Lantern Ring
NSN: 4320-21-912-4285
2 ea.
1,017.00
21
Y
**Z-Drive Lube Oil Cooler
NSN: 4420-01-505-9267
2 ea.
7,725.00
21
N
**Main HPU Cooler
NSN: 4420-01-561-2970
1 ea.
21,518.33
21
N
Heat Exchanger, Gasket
NSN: 5330-01-449-2451
2 ea.
22.53
21
N
Heat Exchanger, Gasket
NSN: 5330-01-449-2479
2 ea.
18.66
23
N
***Fathometer Transducer, Shallow Water, 50-200 kHz (Airmar Technology SS505)
NSN: 5845-01-518-6920
1 ea.
343.63
26
N
Seal Kit, Bow Thruster
NSN: 2010-01-555-9048
1 ea.
3,634.00
26
N
Anode, Zinc
NSN: 5365-01-495-5350
9 ea.
113.75
26
N
Brush, Electrical Contact
NSN: 5977-01-299-9205
24 ea.
52.55
26
N
Spring
NSN: 5360-01-069-3068
24 ea.
21.57
28
N
Repair Kit Assembly
NSN: 2040-01-496-9418
2 ea.
1,968.67
28
N
Rod Seal Repair Kit (FL-2605-29 PC#37)
NSN: 2040-01-496-9422
2 ea.
3,030.07
28
N
Repair Kit, Cable Chain (Includes Pads) (FL-2605-29 PC#36)
NSN: 3020-01-538-0684
16 ea.
257.99
28
N
Cylinder Assembly Actuating, Linear
NSN: 3040-01-496-9424
2 ea.
1,969.24
29
N
Hydraulic Brake Assembly
NSN: 2530-01-550-7474
4 ea.
399.00
29
Y
Winch Gear Box Assembly
NSN: 3010-01-F16-4570 PN: SK9052AZ-SAEB-31.4-H1 (Nord Gear Corp) or YMD-7914 (Appleton Marine Inc)
4 ea.
1,000.00
29
Y
Hydraulic Motor
NSN: 4320-01-470-8467
4 ea.
900.00
29
N
Wire Rope
NSN: 4010-01-620-9604
4 ea.
577.95
29
N
Counter Balance Valve
NSN: 4820-01-324-4269
8 ea.
107.50
29
N
Shuttle Valve
NSN: 4820-01-317-2748
8 ea.
34.78
29
N
Needle Valve
NSN: 4820-01-329-0051
4 ea.
38.00
29
N
**Directional Control Valve
NSN: 4810-01-543-3252
4 ea.
3,465.17
29
N
Electrical Connector, Hirshmann
NSN: 5935-01-640-6747
2 ea.
32.00
30
N
Roller bearing Unit
NSN: 3130-01-504-4363
2 ea.
4,012.00
30
N
Grease seal
NSN: 5330-01-462-5544
4 ea.
79.25
30
N
Level wind pivot bushing
NSN: 3120-01-621-2293
1 ea.
1,139.00
30
N
Level wind thrust bearing
NSN: 3120-01-621-2300
2 ea.
483.30
30
N
Rexroth DCV
NSN: 4810-01-507-0037
1 ea.
208.29
30
N
Rexroth Sandwich Flow Control
NSN: 4810-01-505-9289
1 ea.
250.00
30
N
Sun Sandwich Relief Valves
NSN: 4820-01-439-2451
2 ea.
900.00
30
N
Rexroth Tandem Center Proportional Directional Valve
NSN: 4810-01-506-3841
1 ea.
300.00
30
Y
Level Wind Hydraulic Cylinder
NSN: 3040-01-441-3721
1 ea.
7,423.00
30
N
3:1 Pilot Ratio, Vented Counterbalance Valve Assembly
NSN: 4820-01-563-5841
1 ea
98.70
30
N
Fully Adjustable Needle Valve
NSN: 4820-01-416-0579
1 ea
48.75
30
N
Wire Rope Assembly
NSN: 4010-01-646-6972
1 ea.
500.00
30
Y
**Hydraulic Motor
NSN: 4320-01-445-2248
1 ea
23,998
30
N
**Pump, Hydraulic Ram, Hand Driven
NSN: 4320-01-286-4065
1 ea.
419.77
30
N
**Cylinder Pin
NSN: 5315-01-515-9847
1 ea
500.00
30
N
**Cylinder Pin
NSN: 5315-01-515-9912
1 ea
520.00
31
N
Anchor Windlass Overhaul kit
NSN: 5430-01-546-4684
1 ea.
12,474.00
31
N
Ball Valve
NSN: 4820-01-013-3430
1 ea.
87.36
31
N
Valve, Counterbalance
NSN: 4820-01-F16-4571 PN: CBEH-LKN-BCL Sun Hydraulics Corp
1 ea.
354.00
31
Y
** Motor, Hydraulic
NSN: 4320-01-419-3520
1 ea.
1,811.00
31
N
** Valve, Linear, Directional Control
NSN: 4810-01-511-3173
1 ea.
983.14
31
Y
Hydraulic Brake
NSN: 2530-01-F14-4033 PN: 90B3C4G087
1 ea.
2,000.00
31
N
** Main Shaft
PN: JC-20245-1
1 ea.
4,134.81
33
N
Wire Rope, Crane Aux Fall
NSN: 3950-01-617-1692
1 ea
629.00
33
N
Wire Rope, Crane Main Fall
NSN: 3950-01-617-1700
1 ea
1,425.00
33
N
Luff Cylinder Seal kit
NSN: 5330-01-433-6307
1 ea
380.00
33
N
Holding Valve
NSN: 4810-01-353-0586
2 ea
84.88
33
N
Shuttle Valve
NSN: 4820-01-317-2748
2 ea
18.97
33
N
Needle Valve
NSN: 4820-01-329-0051
1 ea
36.17
33
Y
Luff Cylinder Control Valve
NSN: 4820-01-602-7668
1 ea
5,259.00
33
N
Bushing, Heel
NSN: 5365-01-F12-2920
4 ea
81.00
33
N
Snap ring
NSN: 5325-00-005-5768
4 ea
274.99
33
N
Hydraulic swivel seal kit
NSN: 4730-01-566-2864
1 ea
1,125.00
33
N
**Pin, Heel
NSN: 5315-01-500-6931
2 ea
1006.60
33
N
**Hand pump w/ Stainless Steel Option, P18
NSN: 4320-01-517-1444
1 ea
473.00
33
N
**Plate, Backing, Brake (Item 231)
NSN: 3040-00-119-9848
1 ea
1,575.00
33
N
**Plate, Brake (Item 232)
NSN: 3040-01-068-7647
1 ea.
377.00
33
N
**Driver Plate (Item 233)
NSN: 3040-01-F14-3994
1 ea.
197.00
33
N
**Plate, Backing, Brake (Item 234)
NSN: 3040-00-119-9848
1 ea
1,575.00
33
N
**Packing Assortment, Preformed
NSN: 5330-01-191-2622
2 ea.
10.94
33
N
**GH30 seal kit
NSN: 2590-01-398-5741
1 ea.
165.23
33
N
**Disc-Friction, Brake
NSN: 3040-01-051-3606
1 ea.
24.42
33
N
**Spring, Helical, Comp
NSN: 5360-01-268-0044
12 ea
13.13
33
N
**PD12C Seal kit
NSN: 2590-01-398-5741
1 ea
60.73
33
N
**Disc, Steel
NSN: 2530-01-066-9585
1 ea
24.42
33
N
**Master brake rebuild kit
NSN: 5330-01-F16-4572 PN: 98-015-3001 (Eskridge Inc)
3 ea
1,758.00
33
Y
**Hydraulic Control Valve Assembly (winch)
NSN: 4810-01-506-7738
1 ea.
9,222.00
33
N
**Hydraulic Control Valve Assembly (Swing/Luff)
NSN: 4820-01-602-7668
1 ea.
5.259.00
33
N
**Aux Hoist Hook (Overhaul Ball)
NSN: 4030-01-572-3945
1 ea
629.31
33
Y
Block, Tackle
NSN: 3940-01-566-2929
1 ea
1,425.45
33
N
**Relief Valve Cartridge
NSN: 4820-01-481-7116 PN: RPIC-LAN (Sun Hydraulics Inc)
1 ea
425.00
33
N
**Control Stand Selector Valve Assembly
NSN: 4730-01-507-3516
1 ea
1,145.21
33
N
**Bushing, Luff Cylinder
NSN: 3120-01-363-7629
4 ea
105.91
33
N
**Pin, Luff Cylinder
NSN: 5315-01-F12-2922 PN: MMD-2232
2 ea
1,576.00
42
Y
*Transducer Cover Plate
N/A
2 ea.
50.00
46
Y
Main CT Winch
NSN: 3950-01-419-1845
1 ea.
26,000.00
46
N
Joystick Controller, Winch
NSN: 3950-01-603-1550
1 ea
500.00
47
N
**Hubbell 90 Gal. Hot Water Tank
PN: MSH90-0-24CNT4
1 ea.
34,695.00
51
N
Refrigerated Air Filter-Dryer
NSN: 4440-01-F15-4374
1
1,000.00
52
N
QAWT Door 1-15-2 Left Hand Outward Opening, Steel, 26x66 inches, IAW NAVSEA DWG 805-1400050
MMC P/N 0216701-11
1 ea
7,300.00
53
Y
Steel WeaTD, 26” X 66”; 2 dog; LH
USCG DWG FL-1602-89
1 ea
4,500.00
53
Y
Steel WeaTD, 26” X 66”; 2 dog; RH
USCG DWG FL-1602-89
1 ea
4,500.00
53
Y
Steel WeaTD, 26” X 66”; 2 dog; LH
USCG DWG FL-1602-89
1 ea
4,500.00
56
N
Blue Insulating Floor Matting
NSN: 7220-00-267-4630
6 ro.
530.18
57
N
Oemga Products Inc Model S Shower 32” x 32” x 80” Type 304 18 ga SS w/ 14 gal tub Including hardware and light hole
PN: Model S
6 ea.
2,249.00
57
N
Speakman Company Shower Pressure Balancing valve with shower head
PN: 1160514
6 ea.
511.92
60
Y
****Sperry SRD 500 Doppler speed log
NSN: 5999-01-472-7499
1 ea.
16504.43
61
N
**Kreissl 3” Duplex Sea Strainer
NSN:4730-01-614-9064
1 ea.
5,580.00
63
N
3’ x 3’ anti-fatigue matting
NSN: 7220-01-598-6144
80 ea.
46.36

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

****New or refurbished equipment that the Government may provide for installation in place of existing equipment , which is to be supplied by either the vessel or the C4IT Service Center upon receipt of CFR.

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
1
Hull Plating (Side Scan), Ultrasonic Testing
3
Hull Plating (Freeboard), Ultrasonic Testing
10
Appendages (U/W), Leak Test
14
Voids (Non-Accessible), Leak Test
19
Hydraulically Operated Cargo Hatch, Inspect and Service
20
Z-Drive Propulsion Units, Overhaul
24
Sea Bay, Clean, Inspect, and Preserve “100%”
28
Hydraulic Chain Stoppers, Inspect And Service
29
Hydraulic Crossdeck Winches, Inspect And Service
30
Hydraulic Inhaul Winch, Inspect And Service
31
Anchor Windlass, Inspect And Service
32
Anchor Chain(s) and Ground Tackle, Inspect and Repair
33
Buoy Crane, Inspect and Service
39
U/W Body, Preserve (100%)
46
Buoy Crane Main Winch, CT Function, Remove

Fuel Oil Gooseneck Vent, Renew Bilges, Preserve

56
Deck Covering, Electrical Matting, Renew
58
Deck Covering (Interior Wet/Dry) and Deck Drain, Renew
61
Sea Strainers - Duplex (All Sizes), Overhaul
62
Sea Strainers - Simplex (All Sizes), Clean and Inspect

Principal Characteristics - TENDER

175' WLM, BUOY TENDER

Physical

Length overall
174' 8"
Length between perpendiculars
155' 1"
Depth
14' 8"
Maximum beam
36' 0"
Designed draft
8' 0"
Mast height (above 8' waterline)
58' 8"
Frame spacing
20"
Full load displacement
855.15 Long Tons SW
Light load displacement
719.78 Long Tons SW
Minimum op condition displ
852.19 Long Tons SW

HULL

Hull material
Steel

Machinery

Main propulsion
Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM

Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM

Reduction gears
Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio
Shaft seal
John Crane Type ND
Shaft bearings
Five pedestal mounted, Cooper split roller bearings
Number of propellers
2
Number of blades
4
Diameter
57.1"
Rudders
None; Z-drive
Ship's service generators
Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800 RPM
Emergency diesel generator
One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM

Tank Capacities

Diesel oil capacity (100%)
16,385 gal
Fresh water capacity (100%)
7,339 gal
Lubricating oil (100%)
86 gal

00000_0316_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

Coast Guard Drawings

None

Coast Guard Publications

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

Other References

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3: SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer:

Abrasive Sieve Size:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Place Surface Profile

Place Surface Profile Replica Tape Here Place Surface Profile Replica Tape Here

Reading (mils):

Reading (mils):

Reading (mils):

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings:

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer:

Abrasive Sieve Size:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

Date
Test Locations
Conductivity (Microsiemens/CM)
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Location (Frame Reference):

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

11000_SideScan_1215_FLT REC_11000_Side_Scan_FLT_175 WLM- ALL (1211)

WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion COAST GUARD Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

Other References

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

· 3.2 Side scan requirements and procedures.

3.1.2 Tech Rep.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

· Hull zinc anode system

· Docking blocks.

3.2 Work coordination and preparation. The Contractor shall plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor shall abide by the following guidance, to facilitate the ultrasonic survey:

· Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.

· Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.

· Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.

· After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.

· Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.

3.3 Side scan requirements and procedures. The Contractor shall ensure the following referring to the Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.

3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:

· All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended Practice No. SNT-TC-1A.

· An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.

· An SNT Level III or II Analyst is on site, to verify with a hand…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .