ATTACHMENT_2_-_JAMES_RANKIN_SPECS.pdf

PDF 2 MB Posted

Attached to
DRYDOCK REPAIRS FOR THE USCGC JAMES RANKIN
Solicitation number
HSC8517QP45972
Issued by

About this file

SPECIFICATIONS

View the file

Other files

File Type Posted
3653_245_P.pdf PDF
JAMES_RANKIN_SPEC_REV3.doc DOC document
Amendment_0003_CGC_JAMES_RANKIN.docx DOCX document
3653_245_B.pdf PDF
Amendment_0002_CGC_JAMES_RANKIN.pdf PDF
175-WLM_528_1_2_-_E.PDF PDF
175-WLM_528_1_3_-_E.PDF PDF
175-WLM_528_1_4_-_E.PDF PDF
JAMES_RANKIN_(WLM_175)_DD_JCC_17R2.doc DOC document
175-WLM_528_6_1_-_G.PDF PDF
175-WLM_528_1_5_-_E.PDF PDF
175-WLM_528_1_1_-_E.PDF PDF
A0001JAMESRANKIN.pdf PDF
QUESTION_AND_ANSWERS_-_AMEND_0001.doc DOC document
JAMES_RANKIN_REV1.pdf PDF
JAMES_RANKIN_SECTION_B.xls XLS spreadsheet
Attachment_5-_USCG_Ombudsman_Notice_JAMESRANKIN.doc DOC document
JAMES_RANKIN_FY17.pdf PDF
Attachment_3_Past_Performance_Information_Form_JAMESRANKIN.doc DOC document
Attachment_4_Request_for_ClarificationJAMERANKIN.docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC JAMES RANKIN (WLM 555)

SPECIFICATION FOR DRYDOCK REPAIRS

FY2017

Developed By: Jonathan C Copley

(Rev-0, 02 February 2017)

USCGC JAMES RANKIN (WLM-175) DRYDOCK AVAILABILITY FY2017

ii (Rev-0)

TABLE OF CONTENTS

Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ........................................................................................... xiv Principal Characteristics - TENDER .......................................................................................................... xvi General Requirements WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing WORK ITEM 2: Hull Plating (U/W Body), Inspect WORK ITEM 3: Hull Plating (Freeboard), Ultrasonic Testing WORK ITEM 4: Hull and Structural Plating (General) -10.2-Pound Steel, Renew WORK ITEM 5: Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew WORK ITEM 6: Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew WORK ITEM 7: Hull And Structural Plating (General) - 20.5-Pound Steel Plate, Renew WORK ITEM 8: Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew WORK ITEM 9: Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew WORK ITEM 10: Appendages (U/W), Leak Test WORK ITEM 11: Appendages (U/W) - Internal, Preserve WORK ITEM 12: Chain Locker, Clean, Inspect, and Preserve 100% WORK ITEM 13: Tanks (Mp Fuel Stowage And Overflow), Clean, Inspect, Blast and Coat WORK ITEM 14: Voids (Non-Accessible), Leak Test WORK ITEM 15: Voids (Non-Accessible), Internal Surfaces, Preserve WORK ITEM 16: Tanks (Potable Water), Clean, Inspect, and Preserve “100%” WORK ITEM 17: Tanks (Ballast), Clean and Inspect WORK ITEM 18: Tanks (Dirty Oil and Waste), Clean and Inspect WORK ITEM 19: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 20: Z-Drive Propulsion Units, Overhaul WORK ITEM 21: Sw Heat Exchangers; Clean, Inspect And Hydro WORK ITEM 22: Circuit Breakers (60 Hz), Inspect and Test WORK ITEM 23: Fathometer Transducer, Renew WORK ITEM 24: Sea Bay, Clean, Inspect, and Preserve “100%” WORK ITEM 25: Crane and Deck Hydraulic System, Flush WORK ITEM 26: Thruster Unit (General), Overhaul WORK ITEM 27: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 28: Hydraulic Chain Stoppers, Inspect And Service WORK ITEM 29: Hydraulic Crossdeck Winches, Inspect And Service WORK ITEM 30: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 31: Anchor Windlass, Inspect And Service WORK ITEM 32: Anchor Chain(s) and Ground Tackle, Inspect and Repair WORK ITEM 33: Buoy Crane, Inspect and Service WORK ITEM 34: Tanks (Ballast), Preserve “100%” WORK ITEM 35: Tanks (Ballast), Preserve “Partial” WORK ITEM 36: Tanks (Dirty Oil and Waste), Preserve “100%” WORK ITEM 37: Tanks (Dirty Oil and Waste), Preserve “Partial” WORK ITEM 38: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 39: U/W Body, Preserve (100%) WORK ITEM 40: Hull Plating Freeboard, Preserve “100%” WORK ITEM 41: Cathodic Protection / Zinc Anodes, Renew WORK ITEM 42: Drydock iii (Rev-0)

WORK ITEM 43: Temporary Services, Provide - Cutter WORK ITEM 44: Sea Trial Performance, Support, Provide WORK ITEM 45: Power Assisted Griping System, Remove WORK ITEM 46: Buoy Crane Main Winch, CT Function, Remove WORK ITEM 47: Hot Water Accumulator Tanks, Clean and Inspect WORK ITEM 48: Compressed Air Receivers and System Valves (All), Clean, Inspect, Hydro and Lift197 WORK ITEM 49: Tanks (MP Fuel Service), Clean, Inspect, Blast and Coat WORK ITEM 50: Tanks (Lube Oil), Clean and Inspect WORK ITEM 51: Compressed Air System Refrigerated Air Dryer, Replacement WORK ITEM 52: QAWT Door, Renew WORK ITEM 53: Weathertight Doors, Renew WORK ITEM 54: Fuel Oil Gooseneck Vent, Renew WORK ITEM 55: Bilges, Preserve WORK ITEM 56: Deck Covering, Electrical Matting, Renew WORK ITEM 57: Shower Stalls, Renew WORK ITEM 58: Deck Covering (Interior Wet/Dry) and Deck Drain, Renew WORK ITEM 59: Tanks (Hydraulic Oil Stowage And Service), Clean And Inspect WORK ITEM 60: Underwater (Speed) Log Transducer(s), Inspect and Service WORK ITEM 61: Sea Strainers - Duplex (All Sizes), Overhaul WORK ITEM 62: Sea Strainers - Simplex (All Sizes), Clean and Inspect WORK ITEM 63: Anti-Fatigue Matting, Install iv (Rev-0)

REVISIONS RECORD

This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE REV# WORK

ITEM#

CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

v (Rev-0)

CONSOLIDATED LIST OF REFERENCES

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

• MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

• Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

• Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws::

www.gpoaccess.gov

The Government is aware of the following internet web links where contractors may procure commercial specifications:

• American Welding Society (AWS): http://www.awspubs.com/index.php

• ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

• NFPA: http://www.nfpa.org

• SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 114-001, Rev D, Shell Appendages Coast Guard Drawing 175 WLM 130-001, Rev -, Mods to Buoy Deck Incidental to Hawser Pipe Cover Coast Guard Drawing 175 WLM-167-001, Rev L, Structural Closures Coast Guard Drawing 175 WLM 184-001, Rev -, V850 Transducer Adapter Ring Coast Guard Drawing 175 WLM 201-001, Rev C, Machinery Spaces Arrangement Coast Guard Drawing 175 WLM 243-002, Rev F, Propulsion Shaft Arrangement Coast Guard Drawing 175 WLM 245-001, Rev A, Propeller Coast Guard Drawing 175 WLM 256-001, Rev J, Seawater Cooling System Diagram Coast Guard Drawing 175 WLM 256-003, Rev D, Seawater Cooling System, Fr 61 Fwd Blocks 910, 920, Coast Guard Drawing 175 WLM 256-004, Rev J, Seawater Cooling System A&D, Hull Blks 940-970 Coast Guard Drawing 175 WLM 256-005, Rev -, Z-Drive Lube Oil Heat Exchanger Tube Bundle, Replacmnt & Piping Mods Coast Guard Drawing 175 WLM 256-012, Rev B, ASW System Piping Modifications Coast Guard Drawing 175 WLM 256-013, Rev -A, Sea Bay Thermometer Probe Install Coast Guard Drawing 175 WLM 320-001, Rev AF, Electrical One Line Diagram Coast Guard Drawing 175 WLM 320-002, Rev G, Power System Deck Plan Frame 24 Fwd, Hull Blocks

910 & 901 Coast Guard Drawing 175 WLM 320-009, Rev R, Power Sys Elem Wiring Diagram http://www.assistdocs.com/search/search_basic.cfm http://www.uscg.mil/directives/default.asp http://www.gpoaccess.gov/ http://www.awspubs.com/index.php http://www.techstreet.com/ http://www.nfpa.org/ http://shopping.netsuite.com/sspcmarketplace vi (Rev-0)

Coast Guard Drawing 175 WLM 330-002, Rev F, Lighting System Fr 24 Forward, Hull Blocks 910 &

Coast Guard Drawing 175 WLM 437-007, Rev P, Buoy Dk Control Sys Block, Iso & Elem Wrg Diag Coast Guard Drawing 175 WLM 505-003, Rev B, Sea Connection Arrangements Coast Guard Drawing 175 WLM-506-001, Rev G, Overflows, Air Escapes & Sounding Tubes Diagrams Coast Guard Drawing 175 WLM 512-005, Rev A, Hvac A & D, Frame 6 Forward, Hull Block 901 Coast Guard Drawing 175 WLM 512-006, Rev D, Hvac A & D, Frame 24-6, Hull Block 910 Coast Guard Drawing 175 WLM 512-013, Rev B, Hvac Std Details & General Instructions Coast Guard Drawing 175 WLM 528-002, Rev M, Weather Deck Drains Diagram Coast Guard Drawing 175 WLM 528-008, Rev E, Plumbing & Deck Drains A & D, Hull Block 970 Coast Guard Drawing 175 WLM 533-001, Rev G, Potable Water System Diagram Coast Guard Drawing 175 WLM 533-006, Rev D, Independent Tank Potable Water Hb 950 Coast Guard Drawing 175 WLM 541-001, Rev H, Fuel Oil System Diagram Coast Guard Drawing 175 WLM 541-006, Rev C, Independent Tanks, Emergency Generator Day Tank

IIP: 7-1

Coast Guard Drawing 175 WLM 549-001, Rev F, Onboard Lubrication Requirements Coast Guard Drawing 175 WLM 551-001, Rev J, Compressed Air System Diagram Coast Guard Drawing 175 WLM 551-005, Rev E, Compressed Air System A/D Hull Block 940, 950 Coast Guard Drawing 175 WLM 556-001, Rev L, Hydraulic System Diagram Coast Guard Drawing 175 WLM 556-004, Rev D, Fwd Hydraulic System A/D Hull Block 920 Coast Guard Drawing 175 WLM 568-001, Rev B, Bow Thruster Arrangement & Detail Coast Guard Drawing 175 WLM 568-002, Rev K, Bow Thruster Detail Coast Guard Drawing 175 WLM 573-001, Rev U, Buoy Deck Arrangement Coast Guard Drawing 175 WLM 573-008, Rev A, Aton Tie Downs Coast Guard Drawing 175 WLM 573-050, Rev A, Hydraulic Piping Installation for Chain Stopper Coast Guard Drawing 175 WLM 573-051, Rev B, Chain Stopper Structural Mods for Hydraulic Roller

Assembly Coast Guard Drawing 175 WLM 581-001, Rev F, Anchor Handling System Arrgt Coast Guard Drawing 175 WLM 601-001, Rev T, General Arrangement Inboard and Outboard Profiles Coast Guard Drawing 175 WLM 601-003, Rev N, Booklet of General Plans Coast Guard Drawing 175 WLM 631-002, Rev E, Painting Schedule (552 On) Coast Guard Drawing 175 WLM 633-001, Rev D, Cathodic Protection Coast Guard Drawing 175 WLM 634-001, Rev G, Deck Covering Schedule Coast Guard Drawing 175 WLM 644-001, Rev G, Sanitary Facilities & Laundry Space Arrangement &

Details Coast Guard Drawing 175 WLM 801-001, Rev A, Hull Lines Coast Guard Drawing 175 WLM 801-003, Rev A, Curves of Form Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-015, Rev C, Scantlings, Decks & Platforms Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion Coast Guard Drawing 175 WLM 920-001, Rev K, Hull Block 920 Panels Coast Guard Drawing 175 WLM 920-002, Rev L, Hull Block 920 Modules vii (Rev-0)

Coast Guard Drawing 175 WLM 920-003, Rev -, Hull Block 920 Block Assembly Coast Guard Drawing FL-1602-89, Rev , Fleet 26’ x 66” Weathertight Door Coast Guard Fleet Drawing FL 2605-029, Rev H, Chain Stopper System Rising Sheave Assembly Coast Guard Fleet Drawing FL 2804-012, Rev -, U.S.C.G. Emblem Coast Guard Fleet Drawing FL 2804-022, Rev-, Consolidated Visual ID for Cutters (Vessels 65 FT And

Over In Length) Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors

Manual Coast Guard Technical Publication (TP) 3446, Jun 2009, Doppler Speed Log, Model SRD-500 Dual Axis Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch Coast Guard Technical Publication (TP) 3610, Section 167-A, Nov 2005, Hydraulic Cargo Hatch - Model

No. D-WK-787 Coast Guard Technical Publication (TP) 3619, 13-AUG-98, Manufacturers Instruction Book-SWBS

Group(s) 324 Coast Guard Technical Publication (TP) 3628, 1/1/1999; Vol 4 of 9, Instruction Manual, Bow Thruster Coast Guard Technical Publication (TP) 3630, 07-JAN-97, Manufacturers Instruction Book-SWBS

Group(s) 573 Coast Guard Technical Publication (TP) 3630, SWBS 573, Section A (573A), Jun 2015, Manufacturer's

Instruction Book-SWBS Group 573, Buoy Crane Coast Guard Technical Publication (TP) 3631, Mar 2007, Manufacturer’s Instruction Book-SWBS

Group(s) 573-581, Section B, Cross Deck Winch – Appleton Marine Model BMD-463 Coast Guard Technical Publication (TP) 3631, Section 581-A, Sep 2013, Manufacturer's Instruction

Book-SWBS Groups 573-581, Anchor Windlass Coast Guard Technical Publication (TP) 3653, Jul 2013; SWBS 245, Section A; Z-Drive - Model 1350-H Coast Guard Technical Publication (TP) 3939, SWBS 573-A, Apr 2007, Rising Sheave Chain Stopper Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard

Electrical Cable Test Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard

Electrical Cable Removal, Relocation, Splice, Repair, and Installation Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary

Machine Systems Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior

Deck Covering Systems Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary

Services viii (Rev-0)

Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System

Components - Health Effects American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for

Personal Qualification and Certification in Nondestructive Testing American Society for Testing and Materials (ASTM) International F1508, 2010, Standard Specification for Angle Style, Pressure Relief Valves for Steam, Gas, and Liquid Services American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and

Welding End ASTM International (ASTM) A53, 2005, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated Welded and Seamless ASTM International (ASTM) D1330, 2010 Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D4138, 2013, Standard Practices for Measurement of Dry Film Thickness of Protective Coating Systems by Destructive, Cross-Sectioning Means ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component

Adhesives (AN) Code of Federal Regulations (CFR) Title 29, Part 1915, Section 15, 2007, Shipyard Employment Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-

Petrolatum Commercial Item Description (CID) A-A-59323, Rev A, Cloths, Cleaning, Low-Lint Commercial Item Description (CID) A-A-59588, 2013, Rubber Silicone DOD-STD-2188, Apr 1987, Babbitting of Bearing Shells Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert Federal Specification (Fed Spec) RR-C-271, Rev E, Dec 2010, Chain and Attachments, Welded and

Weldless International Organization for Standardization (ISO) 4406, 1999, Hydraulic Fluid Power – Fluids –

Method for Coding the Level of Contamination by Solid Particles Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves MIL-PRF-16173, Sep 2006, Corrosion Prevention Compound, Solvent Cut-Back, Cold-Application MIL-A-18001, May 2005, Anodes, Sacrificial Zinc Alloy (Commercially Accepted - ASTM B418) MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded MIL-DTL-23549, Dec 2011, Grease, General Purpose ix (Rev-0)

MIL-F-24402, May 1995, Filters (Hydraulic), Filter Elements (High Efficiency), and Filter Differential Pressure Indicators, General Specification

MIL-PRF-24176 , Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric) MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-1622, Nov 2006, Cleaning of Shipboard Compressed Air Systems MIL-STD-419, Jul 1987, Cleaning and Protecting Piping, Tubing and Fittings for Hydraulic Power

Transmission Equipment National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for

Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications

Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA- PRO-160, Jan 2011, Chapter 16, Cofferdams

NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation Details

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets

Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric

Surface Forces Logistics Center Time Compliant Technical Order (TCTO) TP2030.1, Buoy Crane Main Winch, CT Function, Remove

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2004, Power Tool Cleaning to Bare Metal

The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2004, Power Tool Cleaning

The Society for Protective Coatings (SSPC), January 2015, Paint Application Specification No. 2 (PA-2), Procedure for Determining Conformance to Dry Coating Thickness Requirements

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning

The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning

Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker x (Rev-0)

CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK

ITEM

MTI ITEM

DESCRIPTION

NSN/PN QTY ESTIMATED

COST

($/UNIT)

20 N Prop Shaft Seal NSN: 5330-20-009-3957 2 ea. 25,493.00 20 Y **Seal Ring, MN

Bronze NSN: 5330-01-F15-4225 2 ea. 2,206.00

20 N Clutch Overhaul Kit (Original Clutch)

NSN: 2010-01-551-1161 2 ea. 7,959.62

20 N Clutch Overhaul Kit (New Clutch)

NSN: 2520-01-645-8279 2 ea. 7,959.62

20 N **O-Ring NSN: 5331-21-912-4287 2 ea. 7,007.00 20 N **Lantern Ring NSN: 4320-21-912-4285 2 ea. 1,017.00 21 Y **Z-Drive Lube Oil

Cooler NSN: 4420-01-505-9267 2 ea. 7,725.00

21 N **Main HPU Cooler NSN: 4420-01-561-2970 1 ea. 21,518.33 21 N Heat Exchanger, Gasket NSN: 5330-01-449-2451 2 ea. 22.53

21 N Heat Exchanger, Gasket

NSN: 5330-01-449-2479 2 ea. 18.66

23 N ***Fathometer Transducer, Shallow Water, 50-200 kHz

(Airmar Technology

SS505)

NSN: 5845-01-518-6920 1 ea. 343.63

26 N Seal Kit, Bow Thruster NSN: 2010-01-555-9048 1 ea. 3,634.00 26 N Anode, Zinc NSN: 5365-01-495-5350 9 ea. 113.75 26 N Brush, Electrical Contact NSN: 5977-01-299-9205 24 ea. 52.55 26 N Spring NSN: 5360-01-069-3068 24 ea. 21.57 28 N Repair Kit Assembly NSN: 2040-01-496-9418 2 ea. 1,968.67 28 N Rod Seal Repair Kit

(FL-2605-29 PC#37)

NSN: 2040-01-496-9422 2 ea. 3,030.07

28 N Repair Kit, Cable Chain (Includes Pads)

(FL-2605-29 PC#36)

NSN: 3020-01-538-0684 16 ea. 257.99

28 N Cylinder Assembly Actuating, Linear

NSN: 3040-01-496-9424 2 ea. 1,969.24

29 N Hydraulic Brake Assembly

NSN: 2530-01-550-7474 4 ea. 399.00

29 Y Winch Gear Box Assembly

NSN: 3010-01-F16-4570 PN:

SK9052AZ-SAEB-31.4-H1

(Nord Gear Corp) or YMD- 7914 (Appleton Marine Inc)

4 ea. 1,000.00

29 Y Hydraulic Motor NSN: 4320-01-470-8467 4 ea. 900.00 29 N Wire Rope NSN: 4010-01-620-9604 4 ea. 577.95 29 N Counter Balance Valve NSN: 4820-01-324-4269 8 ea. 107.50 29 N Shuttle Valve NSN: 4820-01-317-2748 8 ea. 34.78 xi (Rev-0)

29 N Needle Valve NSN: 4820-01-329-0051 4 ea. 38.00 29 N **Directional Control

Valve NSN: 4810-01-543-3252 4 ea. 3,465.17

29 N Electrical Connector, Hirshmann

NSN: 5935-01-640-6747 2 ea. 32.00

30 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00 30 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25 30 N Level wind pivot bushing NSN: 3120-01-621-2293 1 ea. 1,139.00

30 N Level wind thrust bearing

NSN: 3120-01-621-2300 2 ea. 483.30

30 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29 30 N Rexroth Sandwich

Flow Control NSN: 4810-01-505-9289 1 ea. 250.00

30 N Sun Sandwich Relief Valves

NSN: 4820-01-439-2451 2 ea. 900.00

30 N Rexroth Tandem Center Proportional Directional Valve

NSN: 4810-01-506-3841 1 ea. 300.00

30 Y Level Wind Hydraulic Cylinder

NSN: 3040-01-441-3721 1 ea. 7,423.00

30 N 3:1 Pilot Ratio, Vented Counterbalance Valve

Assembly

NSN: 4820-01-563-5841 1 ea 98.70

30 N Fully Adjustable Needle Valve

NSN: 4820-01-416-0579 1 ea 48.75

30 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00 30 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998 30 N **Pump, Hydraulic

Ram, Hand Driven NSN: 4320-01-286-4065 1 ea. 419.77

30 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00 30 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00 31 N Anchor Windlass

Overhaul kit NSN: 5430-01-546-4684 1 ea. 12,474.00

31 N Ball Valve NSN: 4820-01-013-3430 1 ea. 87.36 31 N Valve, Counterbalance NSN: 4820-01-F16-4571 PN:

CBEH-LKN-BCL Sun Hydraulics Corp

1 ea. 354.00

31 Y ** Motor, Hydraulic NSN: 4320-01-419-3520 1 ea. 1,811.00 31 N ** Valve, Linear, Directional Control NSN: 4810-01-511-3173 1 ea. 983.14

31 Y Hydraulic Brake NSN: 2530-01-F14-4033 PN:

90B3C4G087

1 ea. 2,000.00

31 N ** Main Shaft PN: JC-20245-1 1 ea. 4,134.81 33 N Wire Rope, Crane Aux

Fall NSN: 3950-01-617-1692 1 ea 629.00

33 N Wire Rope, Crane Main Fall

NSN: 3950-01-617-1700 1 ea 1,425.00

33 N Luff Cylinder Seal kit NSN: 5330-01-433-6307 1 ea 380.00 33 N Holding Valve NSN: 4810-01-353-0586 2 ea 84.88 33 N Shuttle Valve NSN: 4820-01-317-2748 2 ea 18.97 33 N Needle Valve NSN: 4820-01-329-0051 1 ea 36.17 33 Y Luff Cylinder Control

Valve NSN: 4820-01-602-7668 1 ea 5,259.00

33 N Bushing, Heel NSN: 5365-01-F12-2920 4 ea 81.00 xii (Rev-0)

33 N Snap ring NSN: 5325-00-005-5768 4 ea 274.99 33 N Hydraulic swivel seal kit NSN: 4730-01-566-2864 1 ea 1,125.00

33 N **Pin, Heel NSN: 5315-01-500-6931 2 ea 1006.60 33 N **Hand pump w/

Stainless Steel Option, P18

NSN: 4320-01-517-1444 1 ea 473.00

33 N **Plate, Backing, Brake (Item 231)

NSN: 3040-00-119-9848 1 ea 1,575.00

33 N **Plate, Brake (Item 232)

NSN: 3040-01-068-7647 1 ea. 377.00

33 N **Driver Plate (Item 233)

NSN: 3040-01-F14-3994 1 ea. 197.00

33 N **Plate, Backing, Brake (Item 234)

NSN: 3040-00-119-9848 1 ea 1,575.00

33 N **Packing Assortment, Preformed

NSN: 5330-01-191-2622 2 ea. 10.94

33 N **GH30 seal kit NSN: 2590-01-398-5741 1 ea. 165.23 33 N **Disc-Friction, Brake NSN: 3040-01-051-3606 1 ea. 24.42 33 N **Spring, Helical, Comp NSN: 5360-01-268-0044 12 ea 13.13

33 N **PD12C Seal kit NSN: 2590-01-398-5741 1 ea 60.73 33 N **Disc, Steel NSN: 2530-01-066-9585 1 ea 24.42 33 N **Master brake rebuild kit

NSN: 5330-01-F16-4572 PN:

98-015-3001 (Eskridge Inc)

3 ea 1,758.00

33 Y **Hydraulic Control Valve Assembly

(winch)

NSN: 4810-01-506-7738 1 ea. 9,222.00

33 N **Hydraulic Control Valve Assembly

(Swing/Luff)

NSN: 4820-01-602-7668 1 ea. 5.259.00

33 N **Aux Hoist Hook (Overhaul Ball)

NSN: 4030-01-572-3945 1 ea 629.31

33 Y Block, Tackle NSN: 3940-01-566-2929 1 ea 1,425.45 33 N **Relief Valve

Cartridge

NSN: 4820-01-481-7116 PN:

RPIC-LAN (Sun Hydraulics

Inc)

1 ea 425.00

33 N **Control Stand Selector Valve

Assembly

NSN: 4730-01-507-3516 1 ea 1,145.21

33 N **Bushing, Luff Cylinder

NSN: 3120-01-363-7629 4 ea 105.91

33 N **Pin, Luff Cylinder NSN: 5315-01-F12-2922 PN:

MMD-2232

2 ea 1,576.00

42 Y *Transducer Cover Plate

N/A 2 ea. 50.00

46 Y Main CT Winch NSN: 3950-01-419-1845 1 ea. 26,000.00 46 N Joystick Controller, Winch NSN: 3950-01-603-1550 1 ea 500.00

47 N **Hubbell 90 Gal. Hot Water Tank

PN: MSH90-0-24CNT4 1 ea. 34,695.00

51 N Refrigerated Air Filter- Dryer

NSN: 4440-01-F15-4374 1 1,000.00

52 N QAWT Door 1-15-2 Left Hand Outward

MMC P/N 0216701-11 1 ea 7,300.00 xiii (Rev-0)

Opening, Steel, 26x66 inches, IAW NAVSEA

DWG 805-1400050

53 Y Steel WeaTD, 26” X

66”; 2 dog; LH USCG DWG FL-1602-89 1 ea 4,500.00

53 Y Steel WeaTD, 26” X 66”; 2 dog; RH

USCG DWG FL-1602-89 1 ea 4,500.00

53 Y Steel WeaTD, 26” X 66”; 2 dog; LH

USCG DWG FL-1602-89 1 ea 4,500.00

56 N Blue Insulating Floor Matting

NSN: 7220-00-267-4630 6 ro. 530.18

57 N Oemga Products Inc Model S Shower 32” x 32” x 80” Type 304 18 ga SS w/ 14 gal tub Including hardware and light hole

PN: Model S 6 ea. 2,249.00

57 N Speakman Company Shower Pressure

Balancing valve with shower head

PN: 1160514 6 ea. 511.92

60 Y ****Sperry SRD 500 Doppler speed log

NSN: 5999-01-472-7499 1 ea. 16504.43

61 N **Kreissl 3” Duplex Sea Strainer

NSN:4730-01-614-9064 1 ea. 5,580.00

63 N 3’ x 3’ anti-fatigue matting

NSN: 7220-01-598-6144 80 ea. 46.36

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter ****New or refurbished equipment that the Government may provide for installation in place of existing equipment , which is to be supplied by either the vessel or the C4IT Service Center upon receipt of CFR.

xiv (Rev-0)

CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS

The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item Title

1 Hull Plating (Side Scan), Ultrasonic Testing

3 Hull Plating (Freeboard), Ultrasonic Testing

10 Appendages (U/W), Leak Test

14 Voids (Non-Accessible), Leak Test

19 Hydraulically Operated Cargo Hatch, Inspect and Service

20 Z-Drive Propulsion Units, Overhaul

24 Sea Bay, Clean, Inspect, and Preserve “100%”

28 Hydraulic Chain Stoppers, Inspect And Service

29 Hydraulic Crossdeck Winches, Inspect And Service

30 Hydraulic Inhaul Winch, Inspect And Service

31 Anchor Windlass, Inspect And Service

32 Anchor Chain(s) and Ground Tackle, Inspect and Repair

33 Buoy Crane, Inspect and Service

39 U/W Body, Preserve (100%)

46 Buoy Crane Main Winch, CT Function, Remove

Fuel Oil Gooseneck Vent, Renew

Bilges, Preserve

56 Deck Covering, Electrical Matting, Renew

58 Deck Covering (Interior Wet/Dry) and Deck Drain, Renew

61 Sea Strainers - Duplex (All Sizes), Overhaul xv (Rev-0)

62 Sea Strainers - Simplex (All Sizes), Clean and Inspect xvi (Rev-0)

PRINCIPAL CHARACTERISTICS - TENDER

175' WLM, BUOY TENDER

PHYSICAL

Length overall 174' 8" Length between perpendiculars 155' 1" Depth 14' 8" Maximum beam 36' 0" Designed draft 8' 0" Mast height (above 8' waterline) 58' 8" Frame spacing 20" Full load displacement 855.15 Long Tons SW Light load displacement 719.78 Long Tons SW Minimum op condition displ 852.19 Long Tons SW

HULL

Hull material Steel

MACHINERY

Main propulsion Two Caterpillar 3508 DITA V-8 diesel; 999 BHP ea @ 1500 RPM

Two Ulstein 360 degree steerable Z-Drives, 403 SRPM @ 1600 ERPM Reduction gears Two Z-Drive units, Cardan shafting; 3.973:1 gear ratio Shaft seal John Crane Type ND Shaft bearings Five pedestal mounted, Cooper split roller bearings Number of propellers 2 Number of blades 4 Diameter 57.1" Rudders None; Z-drive Ship's service generators Three Caterpillar Model 3406 DITA Turbocharged; 285KW, 450V, 60 Hz, 1800

RPM

Emergency diesel generator One Caterpillar Model 3406 DIT 210 KW, 24V, 60 Hz, 1800 RPM

TANK CAPACITIES

Diesel oil capacity (100%) 16,385 gal Fresh water capacity (100%) 7,339 gal Lubricating oil (100%) 86 gal

1 (Rev-0)

00000_0316_FLT

REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)

General Requirements

1. SCOPE

1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.

1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.

2. REFERENCES

COAST GUARD DRAWINGS

None

COAST GUARD PUBLICATIONS

Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General

Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and

Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures

OTHER REFERENCES

None

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.

2 (Rev-0)

3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes (provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:

3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.

3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.

3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.

3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-0) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;

ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.

3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.

3.6 Local Policy. None.

3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:

3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.

3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".

3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel Surfaces by Stripe Coating”

3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED- STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.

3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:

SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".

3.7.2 SFLC Standard Specification 0000 General Requirements.

3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”

3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph

3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC Std Spec 6310 (Critical drying time requirements)).”

4 (Rev-0)

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

5 (Rev-0)

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE

LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).

Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME

6 (Rev-0)

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE

TIME

ACTIVITY (SURFACE

PREPARATION, PRIMER COAT,

BARRIER COAT, TOP COAT,

ETC…)

LOCATION (FRAME &

DECK, RELATION TO

EQUIPMENT, ETC.)

TEMPERATURE % REL.

HUMID-

ITY

DEW

PT.

SURFACE AMBIENT ΔT

| DP -

SURFACE |

7 (Rev-0)

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Place Surface Profile Replica Tape Here

Reading (mils): Reading (mils): Reading (mils):

MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:

8 (Rev-0)

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)

MIN MAX MEAN

SSPC-SP-10/NACE No. 2

SSPC-SP WJ-1/NACE WJ-1

SSPC-SP WJ-2/NACE WJ-2

SSPC-SP WJ-3/NACE WJ-3

SSPC-SP WJ-4/NACE WJ-4

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)

ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Reading (mils):

Mean Reading (mils)

Mean Reading (mils) IAW ASTM DD4417).

9 (Rev-0)

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.

DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)

10 (Rev-0)

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

COATING MFG PRODUCT NAME BATCH

INDUCTION

TIME

COATING SYSTEM SEQUENCE

(PRIMER/TOUCHUP/3RD COAT, ETC.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.

SPOT 1 2 3 4 5 AVERAGE

VALUE

*BASE METAL READING

(BMR) Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

LOCATION (FRAME REFERENCE):

SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS

1 AVG. BMR DEVIATION

3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS

AVG.

1 AVG. BMR DEVIATION

1 AVG. BMR DEVIATION

APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,

ROLLED)

AVERAGE DFT

11 (Rev-0)

11000_SideScan_1215_FLT REC_11000_Side_Scan_FLT_175 WLM- ALL (1211)

WORK ITEM 1: Hull Plating (Side Scan), Ultrasonic Testing

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 175 WLM 801-006, Rev J, Docking Plan Coast Guard Drawing 175 WLM 801-019, Rev C, Shell Expansion

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements

OTHER REFERENCES

American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2013, Recommended Practice for Personal Qualification and Certification in Nondestructive Testing

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

• 3.2 Side scan requirements and procedures.

3.1.2 Tech Rep.

Not applicable.

12 (Rev-0)

3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:

• Hull zinc anode system

• Docking blocks.

3.2 Work coordination and preparation. The Contractor shall plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor shall abide by the following guidance, to facilitate the ultrasonic survey:

• Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.

• Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.

• Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.

• After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.

• Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.

3.3 Side scan requirements and procedures. The Contractor shall ensure the following referring to the Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.

3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:

• All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended Practice No. SNT-TC-1A.

• An SNT Level III Analyst is on site, to oversee the project and evaluate the collected data.

• An SNT Level III…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .