SBInet Acquisition Program Baseline
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001- HSBP1209R2340.DOC | DOC document | |
| Remaining PMOSS Questions-3- dtd 20MAY09 | — | |
| Remaining PMOSS Questions-2- dtd 13MAY09 | — | |
| Strat Planning Draft Output.ppt | PPT presentation | |
| RFP_PMO Support_ 05 12 09.doc | DOC document | |
| Remaining PMOSS Questions | — | |
| RFP PMO Support | — | |
| RFP PMO Support | — | |
| PMOSS INDUSTRY DAY QUESTIONS AND ANSWERS | — | |
| Final_PostDraftRFPQuestions | — | |
| SBInet Risk Managment Plan 6_6_08.pdf | ||
| SBI Systems Program Office.doc | DOC document | |
| DraftTestandEvalMasterplanv2.pdf | ||
| Industry Day Roster.xls | XLS spreadsheet | |
| Industry Day Briefing_draft 03 30 09_v5.ppt | PPT presentation | |
| BaselinePlan1April2009.pdf | ||
| TestEvaluationMasterPlan1Apr2009v1.pdf | ||
| SBInet SEP.doc | DOC document | |
| PMOSS Inbox-answers-03-20-2009version1.doc | DOC document |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2008 2009 2010 2011 2012 2013 2014 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S
System Development Milestone
CBP Infrastructure Project Deployment
Planning Only Project Design
Operations and Sustainment
Page 1 of 1 3/23/09
SBInet Program Roadmap
PROGRAM MILESTONES
BLOCK 1.0 SYSTEM DESIGN & QUALIFICATION
Block 1.0 System Design and Qualification
Block 1.1 - Legacy Sensor Integration (RVSS Integration, MSS w/ LI)
Block 1.2 - A&M BFT Integration: Mobile COP
Block 1.3 - AMOC Video Integration (Not Approved)
COMMUNICATIONS INFRASTRUCTURE
Microwave Spectrum Relocation
P25 Tactical Communication (TACCOMM) Modernization (Laredo-San Diego-Not Approved)
SBInet OneNet Connectivity
Highspeed / Broadband Wireless
BLOCK 1.0 DEPLOYMENT DESIGN & ACCEPTANCE
Tucson Sector Tucson West / Organ Pipe
Tucson East
Tucson TON
Yuma Sector Cabeza Prieta / Yuma
El Paso Sector Phase I (Not Approved)
Phase II (Not Approved)
Northern Border Project
BLOCK 2.0 SYSTEM DESIGN & QUALIFICATION
Block 2.0 System Design and Qualification
SUSTAINMENT
Integrated Logistic Support
Block 1.0 APB Approval S2 Az ATP Block 1.0 KDP 3
Block 2.0 KDP 2
Block 1.0 Complete
(APB OBJ)
CDR
COP
0.5
FQT
SQT Complete
PDR
CDR SQT
PDR CDR
SQT
PDR
CDR
SQT
ATP AWS Phase II
Tucson/Yuma Complete
Design Implementation
Definition
Test Train
Definition
Design
Design
Implementation
Implementation
Test
Test
Train
Train
Definition
Definition
Design
Design
Implementation
Implementation
Definition Design
Test
Test Train
Train
Implement Test Train
Tucson-1 Ajo-1 Tucson Remaining
Comms Study
ATP
HSW Demo
ATP
SWB Highspeed Wireless Build
Prior Tucson Design
DPR DDR
Con
DRR
I&CO
Con
Con
I&CO
OT
I&CO
Con
Con
I&CO
I&CO
DPR DDR DRR Con
Con I&CO
I&CO
DPR DDR DRR Con
Con
I&CO
I&CO
DPR DDR DRR
Con
Con
I&CO
I&CO
DPR DDR DRR
Con
Con
Con
I&CO
I&CO
I&CO
DPR DDR DRR
Con
Con
Con I&CO
I&CO
I&CO
Upgrades
ATP
ATP
ATP
DDR
/ DRR
DDR/DRR
Acceptance
Acceptance
Acceptance Future Sector Design and Deployment (TBD)
SRR PDR CDR SQT
SBInet Operations and Sustainment
System Development Milestone
CBP Infrastructure Project Deployment
Planning Only Project Design
Operations and Sustainment
Tucson-1
Ajo-1
Nogales
Sonoita
Naco
Douglas/Willcox
Casa Grande
Ajo-2
Tucson-2
Yuma/Blythe
Wellton
DRAFT 1.4d
ACRONYM LEGEND:
Con=Construction; I&CO=Integration & Check-out; OT=Operational Testing; SRR= System Requirements Review; PDR=Preliminary Design Review; CDR=Critical Design Review; FQT=Functional Qualification Test;
SQT=System Qualification Test; ATP=Authority To Proceed; DPR= Deployment Planning Review;DDR=Deployment Design Review; DRR= Deployment Readiness Review;KDP=Key Decision Point; APB=Acquisition Program Baseline; POE=Ports of Entry; HSW=High Speed Wireless;
AMOC=Air Marine Operations Center; COP=Common Operating Picture;
RVSS=Remote Video Surveillance System; MSS=Mobile Surveillance System;
LI=Laser Illuminator; TON=Tohono O'odham Nation; BFT=Blue Force Tracking;
SWB=South West Border
Detroit
Buffalo
Champlain POE
NOTE:
Some activities are grayed-out and identified as “not approved.”
CBP will continue to evaluate program trades. However, CBP is preserving options in 2011 among our priorities of (1) Adding/accelerating SBInet deployments along SWB; (2) Accelerating P25 Tactical Comms Modernization; (3) Implementing hi-speed broadband wireless infrastructure in SWB; and/or (4) robusting COP software spiral development.
Tucson / Yuma
El Paso
Rio Grande Valley
- Operational Assessments (Playas)
- M&S Improvements
- Sustaining Engineering
Fabens
Ysleta
El Paso/Santa Teresa
Deming
Lordsburg
Fort Hancock
Laredo
Del Rio San Diego