Evaluation Plan
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 Additional Instructions for Preparation of Proposals.doc | DOC document | |
| HSBP1009R2119 - Revision 1.pdf | ||
| Attachment 1 SOW AW139.doc | DOC document | |
| HSBP1009R2119 - 2-13-09.pdf | ||
| Attachment 2 Additional Instructions for Preparation of Proposals.doc | DOC document | |
| Past Performance Questionnaire.doc | DOC document | |
| Attachment 4 CBP SB Subcontracting Plan Outline.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of Homeland Security
U.S. Customs and Border Protection (CBP)
Office of CBP Air and Marine
EVALUATION PLAN
FOR
AW 139 HELICOPTER PILOT TRAINING
REQUEST FOR PROPOSAL
NUMBER HSBP1009R2119
U.S. CUSTOMS and BORDER PROTECTION
NATIONAL AIR TRAINING CENTER - OKC
5020 SOUTH MERIDIAN AVENUE
OKLAHOMA CITY, OKLAHOMA
EVALUATION PLAN
FOR
AW 139 HELICOPTER PILOT TRAINING
1.0 INTRODUCTION
1.1 Purpose This plan specifies the process used to select a contractor from competing offerors, whose proposal is most likely to satisfy the requirements for the performance of services in support of AW139 Helicopter Pilot Training, as defined in Solicitation Number HSBP1009R2119. This is a full and open competitive acquisition. This procurement is being conducted on a “best value” basis and will include qualitative evaluation factors and tradeoff process procedures. “Best value” means the expected outcome of an acquisition that, in the Government’s estimation, provides the greatest overall benefit in response to the requirement. The Government intends to award a single contract as a result of this solicitation.
The evaluation of the proposals and oral presentations, if conducted, will be conducted as necessary, in accordance with this SSP and in conjunction with FAR Clause 52.212-2, Evaluation---Commercial Items contained in the RFP. Award will be made to the offeror who is deemed responsible in accordance with the FAR, whose proposal conforms to the solicitation’s requirements, and is judged to represent the best value to the Government. All persons participating in the source selection process will use only this plan, the solicitation, and accompanying Technical/Cost Evaluation Board Instructions.
1.2 Scope
The terms source selection evaluation plan and technical evaluation plan are synonymous, and refer to the procedures that will be used to assess the technical capability of all offerors responding to the solicitation.
The source selection methodology is designed to:
a. Assure clear understanding by all participants in technical evaluation and source selection activities of applicable Customs and Border Protection and Department of Homeland Security instructions, policies, and procedures.
b. Establish a structure for the evaluation and scoring of proposals that assures fair and equitable treatment of all potential sources through an accurate, thorough and impartial appraisal of each offeror’s response to the solicitation.
c. Assure that each review team assembles, collates, and presents pertinent data and information in support of their recommendations for review by the Source Selection Evaluation Board, Contracting Officer and Source Selection Authority (SSA), if applicable. This methodology will also consider tradeoffs pertinent to costs, risks and technical merits.
d. Enable the Contracting Officer, or SSA, if applicable to select the source whose proposal best satisfies the Government’s requirements at a reasonable cost for award of the contract.
e.
Assure that accurate and complete records of the evaluation and selection proceedings are developed and retained in permanent files.
1.3 Applicable Documents
a.
Copy of the entire solicitation b.
Federal Acquisition Regulation (FAR) Part 12
I. TECHNICAL/COST EVALUATION BOARDS INSTRUCTIONS
1. PURPOSE OF EVALUATION BOARD INSTRUCTIONS
a.
Explain the evaluation procedure.
2.
EVALUATION PROCEDURE
The contract resulting from the solicitation will be awarded to that responsible offeror whose offer conforms to the solicitation and is evaluated to be the best value to the Government, cost and other factors considered. The evaluators shall evaluate offerors’ responses in accordance with the evaluation criteria as presented below.
DEFINITIONS OF RATINGS
Each technical proposal shall be evaluated on an adjectival basis. The adjectives that will be used in assessing the technical and past performance factors are provided below.
| Outstanding (O) |
| The proposal significantly exceeds all or most of the requirements and contains at least one exceptional enhancing feature that benefits the Government. The offeror has clearly demonstrated a capability to provide products and services in a timely manner and of the highest quality, reliability, safety and functionality. |
| Highly Satisfactory (HS) |
| The proposal fully meets minimum requirements or exceeds a small number of the minimum requirements in a way that benefits the Government. The areas in which the offeror exceeds the requirements are anticipated to result in a high level of quality, reliability, safety and functionality. |
| Satisfactory (S) |
| The proposal fully meets all of the minimum requirements. Areas where the proposal exceeds the minimum solicitation requirements, if any, are of minor or no value to the Government. Any weaknesses are generally offset by strengths. |
| Marginal (M) |
| The proposal is ambiguous or vague and does not meet the minimum requirements. It contains weaknesses or minor deficiencies that could impact quality, reliability, safety and functionality. |
| Unsatisfactory (U) |
| The proposal has many or very significant deficiencies or gross omissions and does not substantially comply with the requirements. Numerous weaknesses and deficiencies exist |
The following adjectives will be used in assessing risk factors for each technical factor.
| Low (L) |
| Has little or no potential to cause disruption of schedule, increase in cost, or degradation of performance. Normal contractor effort will probably be able to overcome difficulties. |
| Medium (M) |
| Can potentially cause some disruption of schedule, increase in cost or degradation of performance. However, special contractor emphasis will probably be able to overcome difficulties. |
| High (H) |
| Likely to cause significant serious disruption of schedule; increase in cost, or degradation of performance even with special contractor emphasis. |
The following will be used in assessing risk factors for past performance.
| Very Low (VL) |
| Based on the offeror's past experience or specialized experience, no risk anticipated that the offeror will not successfully perform the required effort. |
| Low (L) |
| Based on the offeror's past performance or specialized experience, little risk anticipated that the offeror will not successfully perform the required effort. |
| Moderate (M) |
| Based on the offeror's past performance or specialized experience, some potential risk exists that the offeror will not successfully perform the required effort. |
| High (H) |
| Based on the offeror's past performance or specialized experience, substantial risk exists that the offeror will not successfully perform the required effort. |
| Very High (VH) |
| Based on the offeror's past performance or specialized experience, extreme risk exists that the offeror will not successfully perform the required effort. |
| Neutral (N) |
| No performance record is identifiable. |
The adjectives that will be used in assessing the cost factor are provided below.
| High Confidence |
| Based on the Cost/price analysis, the government has high confidence the offeror will successfully perform with the proposed Cost/price. |
| Satisfactory Confidence |
| Based on the Cost/price analysis, the government has confidence the offeror will successfully perform with the proposed Cost/price. Normal contractor emphasis should preclude any problems. |
| Little Confidence |
| Based on the Cost/price analysis, substantial doubt exists that the offeror will successfully perform with the proposed Cost/price. |
| No Confidence |
| Based on the Cost/price analysis, extreme doubt exists that the offeror will successfully perform with the proposed Cost/price. |
RATING AND VALUE INSTRUCTIONS
The Board will evaluate responsive offeror’s proposals using rating factors established below. Award will be made to the offeror proposing the combination most advantageous to the Government based upon an integrated assessment of the evaluation factors and sub-factors described below. Technical Compliance/Management and Past Performance are of equal importance. The evaluation factors other than cost or price, when combined, are approximately equal cost or price.
The Factors and Rating Ranges established are as follows:
a. TECHNICAL COMPLIANCE/MANAGEMENT CAPABILITY The offeror’s technical compliance and management capability will be evaluated based on the assessed strengths, weaknesses, deficiencies, and risks of each offeror’s technical proposal. Subfactor ratings will be individually evaluated then rolled up into an overall rating for the technical factor.
Technical Compliance/Management has five subfactors which are of equal importance:
1.) Use of FAA Qualified Level C or D AW139 Flight Simulator The offeror has demonstrated the capability to conduct the required training in a Federal Aviation Administration Qualified Level C or D AW139 Simulator.
2.) Technical Approach
The proposal provides the required practical exercises in all technical subjects. Minimum standards have been established for the completion of the courses. Equipment will be provided in an acceptable condition to conduct the practical exercises. Pilot training is conducted in accordance with the Federal Aviation Regulations (Title 14, Code of Federal Regulations Part 61 and 142 as appropriate for aircraft type ratings for Commercial and or Airline Transport rated pilots).
3.) Training Content
The proposed course materials are adequate.
4.) Infrastructure
Offeror provides all management, planning, facilities, equipment, aircraft/simulator, course materials and staffing required to conduct training and associated scheduling.
5.) Availability of Classes
Offeror is capable of meeting all requested pilot training dates within 30 days of request from Contracting Officer Technical Representative
b. PAST PERFORMANCE
The Government will evaluate the offeror’s demonstrated record of contract compliance in supplying services that meet user’s needs, including cost and schedule. The team will, as deemed necessary, confirm past performance data identified by offerors in their proposals and as submitted on the Past Performance Questionnaire and obtain additional past performance data, if available, from other sources such as the Past Performance Information Retrieval System and personal interviews with other relevant Government references outside of CBP.
All proposals will be evaluated to ensure that the proposal describes recent and relevant past performance on contracts for similar types of pilot training projects with Government or private industry, which adequately demonstrates the offeror’s technical expertise.
For purposes of this evaluation, recency is defined as work completed or ongoing during the past three (3) years from the date of issuance of this solicitation.
When relevant performance record indicates performance problems, the Government will consider the number and severity of the problems and the appropriateness and effectiveness of any corrective actions taken (not just planned or promised). The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and to evaluate their effectiveness.
All offerors will be given an opportunity to respond to any adverse present and past performance information they have not had the opportunity to respond to. Adverse past performance is defined as past performance information that supports a less than satisfactory rating on any evaluation element or any unfavorable comments received from sources without a formal rating system.
Offerors without any past performance history will not be evaluated favorably or unfavorably on past performance. The offeror shall receive a neutral rating.
A strong record of relevant present and past performance may be considered more advantageous to the Government than a neutral rating.
c.
Cost/Price
The offeror’s cost proposal will be evaluated using one or more of the techniques defined in FAR Part 15, in order to determine if the price proposed is fair and reasonable. The base period of performance and all options will be evaluated.
i) Cost/Price Reasonableness
Offerors’ cost volume will be evaluated, using one or more of the techniques defined in FAR 15.4, in order to determine if the price proposed is reasonable. A price is reasonable when it provides best value to the Government when consideration is given to the current market prices, technical and functional capabilities of the offeror, and risk.
ii) Unbalanced Pricing
Price analysis will be used to determine if the proposed prices are unbalanced. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or under-stated as indicated by the application of cost or price analysis techniques. Unbalanced pricing may increase performance risk and result in higher proposal risk rating or the offer may be rejected if the Government determines the lack of balance poses an unacceptable risk to the Government.
In accordance with FAR 15.304(e), the evaluation factors other than cost or price, when combined, are approximately equal to cost or price.