Attachment_4_Cost_Breakdown_SeaTrain_HR001120S0010.xlsx

XLSX spreadsheet 133 KB Posted

Attached to
Sea Train
Solicitation number
HR001120S0010
Issued by

About this file

This document contains a cost proposal template for a federal contract opportunity with the Defense Advanced Research Projects Agency to develop a Sea Train system for long range naval operations using connected unmanned surface vessels. Key details include:

  • The contractor must provide detailed cost breakdowns by labor category, fringe benefits, overhead, subcontracts, consultants, materials, travel and other direct costs for the base period and any option periods. Indirect rates and escalation assumptions must be supported.

  • Costs must be itemized for each task in the statement of work. The total of all task-level costs must equal the total proposed cost. Options must be fully priced.

  • The template includes tables for labor hours and rates by period, indirect rates, subcontractor data, consultant details, materials, equipment, travel and other costs. Supporting documentation is required.

  • The resulting award will be a cost-plus-fixed-fee contract. Profit or fee cannot be applied to direct equipment or other costs.

  • The period of performance and labor categories must match those proposed technically. Costs will be evaluated for allowability, allocability and reasonableness.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Cost Proposal

GENERAL INFORMATION

The purpose of the requested information in the attached worksheets is to assist government personnel in the review and evaluation of cost proposals submitted by Proposers. Proposers are reminded that the responsibility for providing adequate supporting data and attachments lies solely with them. Further, the Proposer must also bear the burden of proof in establishing reasonableness of proposed costs; therefore, it is in the Proposer’s best interest to submit a fully supportable and well-prepared cost proposal. The basis and rationale for all proposed costs should be provided as part of the proposal so that Government personnel can place reliance on the information as current, complete and accurate. Further, FAR 15.403-4 sets forth those circumstances in which Proposers are required to submit certified cost or pricing data.

Cost by Task: In addition to providing summary by period of performance (base and any options), the contractor is also responsible for providing a breakdown of cost for each task indentified in the statement of work. The sum of all cost by task worksheets MUST equal the total cost summary.

Options: DARPA does not accept unpriced options. Any option that is not fully priced, will not be included in any resulting award.

Enter the proposed cost detail for the base and each option period (as needed) on the tabs entitled, "Phase 1", "Phase 2". The tab entitled, "Total Amount" will automatically calculate from the Base and Option tabs.

Below is a summary of the proposed cost. This chart will automatically fill in from the "Total Amount" tab.

Total Direct Labor Costs$0
Total Fringe Benefit Costs$0
Total Labor Overhead Costs$0
Total Subcontract Costs$0
Total Consultant Costs$0
Total Other Direct Costs$0
Total Material Handling Costs$0
Subtotal Costs$0
Total G&A Costs$0
Subtotal Costs$0
Total Cost of Money$0
Total Estimated Costs$0
Fixed Fee (If proposing a CPFF contract)$0
Total Estimated Costs Plus Fixed Fee$0

TOTAL PROGRAM

Cost Proposal
Prime Offeror Name:
Subcontractor Name:
(NOTE 2)(NOTE 2)
PHASE 1

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

PHASE 2

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
Direct Labor (DL) (Note 1)MM/YR to MM/YR

Wade Wargo: Note:

The months during the base period of performance that these rates apply

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

(NOTE 3) X-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
0$0.000$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalIdentify Tab/File Name of Each Sub$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00
Consultants
Consultant Name - #01Provide details on next Worksheet$0.00$0.00$0.00
Consultant Name - #02Provide details on next Worksheet$0.00$0.00$0.00
Consultant Name - #03Provide details on next Worksheet$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsProvide details on next Worksheet$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00$0.00$0.00
EquipmentProvide details on next Worksheet$0.00$0.00$0.00
TravelProvide details on next Worksheet$0.00$0.00$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$00.000%$0.00$00.000%$0.00ERROR:#REF!$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$00.000%$0.00$00.000%$0.00ERROR:#REF!$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$00.000%$0.00$00.000%$0.00ERROR:#REF!$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 4)$00.000%$0.00$00.000%$0.00ERROR:#REF!$0.00
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the period of performance. Ensure that the length of the periods proposed match those stated in the technical proposal.
Note 3: The values under Total Direct Labor "hours/base" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: Profit or fee is not allowed on direct costs for equipment, Government entities or cost share contracts. In addition, DD Fom 1547 (DFARS 215.404-70) may be utilized in calculating the Government objective for fee.

Phase 1

Cost Proposal - Base
Prime Offeror Name:
Subcontractor Name:
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)
CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
Direct Labor (DL) (Note 1)MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

(NOTE 3) X-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #02Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #03Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
EquipmentProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TravelProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 4)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "hours/base" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: Profit or fee is not allowed on direct costs for equipment, Government entities or cost share contracts.In addition, DD Fom 1547 (DFARS 215.404-70) may be utilized in calculating the Government objective for fee.

&"Arial,Bold"&12&A

Offeror: Page &P of &N Pages &F

Phase 2

Cost Proposal - Option
Prime Offeror Name:
Subcontractor Name:
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)
CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
Direct Labor (DL) (Note 1)MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

(NOTE 3) X-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #02Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #03Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
EquipmentProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
TravelProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 4)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "hours/base" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: Profit or fee is not allowed on direct costs for equipment, Government entities or cost share contracts. In addition, DD Fom 1547 (DFARS 215.404-70) may be utilized in calculating the Government objective for fee.

Labor&Ind Rates LABOR Information

Year 1Year 2Year 3Year 4Basis of Labor Rate
Labor Category (Note 1)NameEscalation RateEscalation RateEscalation RateEscalation Rate(Example: Individual Payrate, Average for Job Category, etc.)
Y
N
Indirect Rates (Note 2)
Year 1Year 2Year 3Year 4Basis of RateApplied Against
Rate CategoryRateRateRateRate(Example: FPRA, FPRP, Estimate, etc.)
Fringe Benefits
Labor Overhead
Material Handling
General and Administrative
Facilities Cost of Money

Note 1: Add additional labor categories if needed.

Note 2:Add additional indirect rates as needed.
If the offeror does not have a Forward Pricing Rate Agreement (FPRA), Forward Pricing Rate Recommendation (FPRR), or provisional billing rates; in order
to assist the Government in evaluating the reasonableness of your proposed indirect rates, please provide the following information:
1. Proforma data used to develop your proposed indirect rates. This typically consists of pool costs and base costs that demonstrate
how the indirect rates were derived.
2. Information regarding your projections for out years, including your assumptions and method for developing these estimates.

Subcontractor

SUBCONTRACTOR COST DATA
Subcontracts/Interorganizational Transfers – A fully disclosed cost proposal as detailed as the Proposer’s cost proposal including support documentation will be required to be submitted by all proposed subcontractors and for all interorganizational transfers over $150,000. For subcontracts and interorganizational transfers under $150,000, only a cost proposal with cost categories broken out must be provided. If options are proposed, the option periods should be separately priced. The subcontract or interorganizational transfer proposal, along with supporting documentation, must be provided either in a sealed envelope with the prime’s proposal or via email directly to the Program Officer or Contract Specialist upon request. The email should identify the prime Proposer, proposal title, and that the attached proposal is a subcontract. The subcontractor and interorganizational transfer proposals with supporting documentation must be received and reviewed before the Government can complete its cost analysis of the proposal and enter negotiations.

The prime contractor should perform and provide a cost/price analysis of each subcontractor’s cost proposal. Proposers are required to obtain competition to the maximum extent practicable when selecting subcontractors; if the Proposer has obtained competitive quotes, copies should be provided. If the Proposer has selected other than the low bid for inclusion in their proposal or intends to award the subcontract on a sole-source basis, the Proposer should provide rationale for their decision. For sole-sourced subcontracts, the prime contractor must provide a short sole-source justification.

Certified cost or pricing data may be required for subcontractor proposals over $700,000.

*Note: Federal Acquisition Regulation provision 52.215-22 is incorporated into this solicitation by reference. The Proposer is to exclude excessive pass-through charges from subcontractors. The Proposer must identify in its proposal the percentage of effort it intends to perform and the percentage to be performed by each of its proposed subcontractors. If more than 70 percent of the total effort will be performed through subcontractors, the Proposer must include the additional information required by the above-cited clause.

SubcontractorCage CodeCompetitive/Sole SourceCost/price analysis included (Y/N)Type of Subcontract (i.e., Fixed Price, Time and Materials, etc.)Competitive Quotes or Sole Source Documentation Included (Y/N)Total amount exceeds $700K (Y/N)
Y
N

&"Arial,Bold"&12&A

Offeror: Page &P of &N Pages &F

Consultants CONSULTANTS (Note 2)

NameWBSDescription of effort to be performed by the Consultant or attach Consultant Statement of WorkNumber of HoursHourly RateTravel costsOther CostsTotalBasis of Estimate (Note 1)Included copy of Consulting Agreement or other documentation supporting the proposed rate (Y/N)Reference Document Number
BaseY
N

Option I

TOTAL $0.00

Note 1: Describe how and why the consultant was selected.

Note 2: Include a separate section in the above table for the base and each option

Materials-Supplies MATERIALS - SUPPLIES (Note 1 and 2)

ItemWBSDescription of MaterialQtyUnit PriceTotal PriceCompetitive /Sole SourceVendor/Source (If known)Basis of Estimate (Note 3)Supporting documentation has been provided (Y/N) (Note 3)Reference Document Number
BaseY
1N
2
3
Option I
4
5
6
7
TOTAL$0.00
Note 1:Material is property that may be incorporated into or attached to a deliverable end item or that may be consumed
or expended in performing a contract. It includes assemblies, components, parts, raw and processed materials, and
small tools and supplies that may be consumed in normal use in performing a contract. Material should be proposed
separately from Equipment (see following spreadsheet and definitions).

Note 2: Include a separate section in the above table for the base and each option

Note 3: Provide as an attachment all supporting documentation to support your price basis i.e. copy of quote, page from catalog, or a detailed explanation of how the engineering estimate was derived

Equipment Equipment (Note 1 and 2)

ItemWBSDescription of Equipment (Note 1)Justification for why the equipment is neededWill the equipment be included as part of a deliverable item under the award? (Y/N)Type of Equipment (special test equipment, special tooling, general purpose equipment, or plant equipment) (Note 3)QtyUnit of IssueUnit PriceTotal PriceVendor/SourceBasis of Estimate (Note 4)Supporting documentation has been provided (Y/N) (Note 4)Reference Document Number
BaseY
N

Option I

TOTAL $0

Note 1: Contractors are normally required to furnish all equipment and/or facilities necessary to perform Government contracts (see FAR 45.102(a)). The Government may allow equipment and/or facilities only under a special circumstances. If equipment and/or facilities are proposed, the specific description should identify the component, nomenclature, and configuration of the equipment/hardware that it proposes to purchase for this effort. The purchase on a direct reimbursement basis of equipment that is not included in a deliverable item will be evaluated for allowability on a case-by-case basis. Maximum use of Government integration, test, and experiment facilities is encouraged.

Note 2: Include a separate section in the above table for the base and each option

Note 3:Definitions:
Special Test Equipment is defined as either single or multipurpose integrated test units engineered, designed, fabricated, or modified to accomplish special purpose testing in performing a contract. It consists of items or assemblies of equipment including standard or general purpose items or components that are interconnected and interdependent so as to become a new functional entity for special testing purposes.

Special tooling is defined as jigs, dies, fixtures, molds, patterns, taps, gauges, and all components of these items, including foundations and similar improvements necessary for installing special test equipment, and which are of such a specialized nature that without substantial modification or alteration their use is limited to the development or production of particular supplies or parts thereof or to the performance of particular services.

Plant equipment means personal property of a capital nature (including equipment, machine tools, test equipment, furniture, vehicles, and accessory and auxiliary items) for use in manufacturing supplies, in performing services, or for any administrative or general plant purpose. It does not include special tooling or special test equipment.

Note 4: Provide as an attachment all supporting documentation to support your price basis i.e. copy of quote, page from catalog, or detailed explanation of how the engineering estimate was derived.

Travel TRAVEL (Note 1 and 2)

TripNumberNumberNumberNumberAir/RailPer DiemPer DiemCarParkingMileageConferenceTaxiOther
WBSPurposeTRIPSTRVLRSDAYSNIGHTSMEALSLODGINGRentalFeeTOTAL
Base
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
Option 1
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
From:xx
To:trip costs$0$0$0$0$0
TOTAL$0

Note 1: Estimates and the resultant costs claimed must conform to the applicable Federal cost principles.

Note 2: Include a separate section in the above table for the base and each option

Note 3: If there are miscellaneous expenses associated with the trip, provide description and rationale.

Note 4:Per Diem Rates proposed should not exceed General Services Administration (GSA) Per Diem rates for the destination area,
available at http://www.gsa.gov/portal/category/21287

http://en.wikipedia.org/wiki/Marine_Corps_Logistics_Base_Albany ODC Details OTHER DIRECT COSTS (Notes 1 and 2)

DescriptionWBSQtyUnit of IssueUnit PriceTotal PriceBasis of Estimate (Note 3)Supporting documentation has been provided (Y/N) (Note 3)Reference Document Number
BaseY
N

Option I

TOTAL $0

Note 1: Examples include rental fees, shipping costs, license fees

Note 2: Include a separate section in the above table for the base and each option

Note 3: Provide as an attachment all supporting documentation to support your price basis, e.g., copy of quote or detailed explanation of how the engineering estimate was derived

Task 1

Cost Proposal (NOTE 4)
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

(NOTE 3) X-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #02Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #03Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00
EquipmentProvide details on next Worksheet$0.00
TravelProvide details on next Worksheet$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 5)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "hours/base" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: A separate spreadsheet must be provided for any proposed option period/effort.
Note 5: Profit or fee is not allowed on direct costs for equipment, Government entities or cost share contracts. In addition, DD Fom 1547 (DFARS 215.404-70) may be utilized in calculating the Government objective for fee.

Task 2

Cost Proposal (NOTE 4)
(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 2)(NOTE 4)(NOTE 2)
Direct Labor (DL) (Note 1)CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

CY/FY

Wade Wargo: Note:

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year

Total
MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR

Offeror to insert whether it's accounting system uses the Calendar Year (CY) or Fiscal Year (FY) and the current year MM/YR to MM/YR Wade Wargo: Note:

The months during the base period of performance that these rates apply

(NOTE 3) X-Months wade.wargo: Indicate total months of base period

Offeror's Labor Category (NOTE 1)Name (Last, First)Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursRateExtended $Base/HoursExtended $
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
$0.00$0.00$0.00$0.00$0.00$0.000$0.00
Total Direct Labor Costs0$0.000$0.000$0.000$0.000$0.000$0.000$0.00
Fringe Benefits (F/B) (See Escalation and Indirect Rate Worksheet)
Insert F/B rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other F/B rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Fringe Benefit Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Labor Overhead (O/H) (See Escalation and Indirect Rate Worksheet)
Insert O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Labor Overhead Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontracts/Interorganizational TransferFile/Tab Name or Link
Subcontract/Interorganizational Name - #01Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #02Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subcontract/Interorganizational Name - #03Identify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional Subcontractors/InterorganizationalIdentify Tab/File Name of Each Sub$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Subcontract Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultants
Consultant Name - #01Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #02Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Consultant Name - #03Provide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Insert line(s) for any additional ConsultantsProvide details on next Worksheet$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Consultant Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Other Direct Costs
Materials/SuppliesProvide details on next Worksheet$0.00
EquipmentProvide details on next Worksheet$0.00
TravelProvide details on next Worksheet$0.00
Insert line(s) for any other types of ODCsProvide details on next Worksheet$0.00
Total Other Direct Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Material Handling (M/H O/H) (See Escalation and Indirect Rate Worksheet)
Insert M/H O/H rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other M/H O/H rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Material Handling Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
General and Administrative (G&A) (See Escalation and Indirect Rate Worksheet)
Insert G&A rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other G&A rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total G&A Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Subtotal Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Facilities Cost of Money (COM) (See Escalation and Indirect Rate Worksheet)
Insert COM rate title$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Insert line(s) & title(s) for any other COM rates$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Cost of Money$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Total Estimated Costs$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Fixed Fee (If proposing a CPFF contract)(Note 5)$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0$0.00$0.00
Total Estimated Costs Plus Fixed Fee$0.00$0.00$0.00$0.00$0.00$0.00$0.00
Note 1: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 2: Indicate the start and end date of Offeror's Fiscal Year/Calendar Year
Note 3: The values under Total Direct Labor "hours/base" column indicate the total level of effort for the project for each labor category. The Offeror must define the split of hours between initial and subsequent rate years based on its FY or CY in the prior columns.
Note 4: A separate spreadsheet must be provided for any proposed option period/effort.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .