This document contains the pre-bid questions and answers for the Ft. Buchanan Commissary, Puerto Rico (PR) Refrigeration, HVAC, and Décor Upgrade solicitation, Solicitation Number HQC00324B0010.
The solicitation is for a construction project at the Ft. Buchanan commissary in Puerto Rico to replace existing refrigeration, HVAC, and décor equipment without disrupting operations. The scope includes the refrigeration system, refrigeration display cases, Refrigeration Monitoring and Control System (RMCS), compressor racks, condensing units, unit coolers, and associated refrigerant piping. It also includes replacing outdated HVAC systems and equipment, as well as updating the interior décor. The government has proposed brand name or equivalent dual-path cooling and dehumidification units from Seasons 4 models and air-cooled condenser units for the refrigeration system.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fort Buchanan Commissary Pre-Bid Questions Page 1 of 1
Q1. Is there an Arch Flash study requirement on this project?
A: Yes, See the riser diagram on the attached sheet R1.5 and specification section
26 28 01 COORDINATED POWER SYSTEM PROTECTION.
Q2. Spec 239000 calls for 1P07 cases without doors and solicitation drawings show the same cases with doors. Please advise.
A: Provide 1P07 case with doors. See the attached revised specification.
Q3. Does the existing structure support the 6 to 8” steel piping required for the water loop system?
A: Existing joists can support the new water line loop system.
Q4. All existing exposed ceilings, joist, steel decking, conduits, duct, piping are painted on the sales floor. Will the new electrical conduits and refrigeration loop piping be required to be painted to match?
A: Yes, See the attached revised room finish schedule sheet A11.1.
Q5. Is there a proposed laydown area for office and storage trailers? Please advise so cost can be determined for temporary utilities.
A: See attached Fort Buchanan Commissary - staging area.
Q6. Will temporary restroom facilities be required during renovation of Meat/Produce Locker Restrooms 50/52?
A: No temporary facilities are required. Relocate existing lockers to breakroom 48 during the renovation of the toilet rooms. See the attached revised sheet A8.1.
Q7. Please provide Lockers Specification for the replacement locker required in Rm 50/52.
A: Lockers are to be removed and reinstalled. No new lockers are required.
Q8. The room finish schedule on A11.1 shows the Meat Chill Storage Rm 59 floors to be patched with resinous flooring per Remarks Note F1. Remark note G1 state the area is to remain as is unless shown otherwise. Please confirm the flooring requirement in Meat Chill Storage Rm 59.
A: The resinous flooring repair is in room 55. See the attached revised A11.1.
Q9. The room finish schedule on A11.1 shows the Deli Prep Area Rm 73 & Deli Chill Storage Rm 77 floors to be patched with resinous flooring per Remarks Note F1. Remark note G1 states the area is to remain as is unless shown otherwise. Demo drawing AD1.1 shows the existing floors to be removed per Sheet Note 6, existing flooring to be removed. Drawing A1.1, Key Note 8 call for new Resinous flooring. Please confirm the flooring removal and installation
Solicitation: HQC00324B0010
Fort Buchanan Commissary Pre-Bid Questions Page 2 of 1 requirements in RM 73 & 77.
A: Remove existing flooring in rooms 73 and 77 and provide new resinous flooring. See the attached revised sheet A11.1.
Q10. Plumbing drawing P1.1 shows Restroom 50/52 fixtures are to be removed and re-installed.
Please confirm the contractor is not required to replace the existing fixture carriers and relocated to meet ABA requirements.
A: Replace the existing fixture carriers, relocate fixtures to reflect drawings, and replace the existing flush valve parts.
Q11. The contract document does not show the underground refrigeration tunnels that have existing refrigeration piping. Please provide as-builts.
A: Remove items in tunnels, See the attached Structural As-built drawings and sheet RD1.0.
Q12. A1.0 shows the 1P07 to have doors but the spec. shows to be a multi deck. Please advise.
A: See response to Q2.
Additional Items
1. Phasing Plan G2.0. See the attached revised general note A, referring to sheet G2.1 for specific phasing notes and to clarify that not more than half of each refrigerated case type can be non-operational at any time and sub phases.
2. See revised Sheet A1.1 for additional partition information and closure at the island case.
Q13. The room finish schedule on A11.1 shows the Meat Chill Storage Rm 59 floors to be patched with resinous flooring per Remarks Note F1. Remark note G1 state the area is to remain as is unless shown otherwise. Please confirm the flooring requirement in Meat Chill Storage Rm 59.
A: See response to Q8
Q14. The room finish schedule on A11.1 shows the Deli Prep Area Rm 73 & Deli Chill Storage Rm 77 floors to be patched with resinous flooring per Remarks Note F1. Remark note G1 state the area is to remain as is unless shown otherwise. Demo drawing AD1.1 show the existing floors to be removed per Sheet Note 6, existing flooring to be removed. Drawing A1.1, Key Note 8 call for new Resinous flooring. Please confirm the flooring removal and installation requirements in RM 73 & 77.
A: See response to Q9
Q15. Plumbing drawing P1.1 shows Restroom 50/52 fixtures are to be removed and re-installed. Please confirm the contractor is not required to replace the existing fixture carriers and relocated to meet ABA requirements.
A: See response to Q10
Fort Buchanan Commissary Pre-Bid Questions Page 3 of 1
Q16. The contract document does not show the underground refrigeration tunnels that have existing refrigeration piping. Please provide as-builts.
A: See response to Q11
Q17. The existing Refrigeration System at the Ft Buchanan Commissary is in poor condition. Will all refrigerant leaks be repaired, and receiver levels be brought up to 30 percent prior to turnover of maintenance to the refrigeration contractor? If not, please provide the leak recovery rate so a budget can be determined.
A: Due to the issues with the refrigeration systems, is precisely why this project is being initiated.
Refrigerant leaks, if any, will not be repaired, leak recovery rate logs have been requested. Per specs.
23 01 00, Maintenance & Repair for HVAC & Refrigeration, the contractor is allowed to perform a pre-performance inspection and provide their concerns to the contracting officer.
Q18. R2.2 Detail 1 Note 1 refers to electrical sheets regarding a transfer switch. There are no electrical sheets. Is there an existing manual transfer switch or will a new one need to be provided?
A: See the attached revised Sheet R2.2 for updated one line diagram.
Q19. R2.2 Detail 1 Note 2 states all electrical per current NEC. Current NEC requires calculated arc flash labels to be installed on all electrical equipment. Are calculated arc flash labels required to be installed on the new electrical panels? Are calculated arc flash labels required to be installed on the existing electrical panels? If so, are specifications available?
A: See the response to Q1.
Q20. R2.2 Detail 1 Note 15 references a generator connection box on E5.1. There is no sheet E5.1 Is a generator connection box required and if so, is it required to be installed inside or outside and if outside, does it need to be stainless steel?
A: See the attached revised Sheet R2.2 for updated one line diagram eliminating the generator connection box.
Q21. For sealed bid offer, the solicitation letter (SF 1442) states that “sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due”. This statement conflicts with the procedures for submission of bids and virtual bid opening. Please clarify.
A: The information in this form uses standard language to encompass applicable contracts. The bidder must follow the information under the instructions to bidders regarding procedures for submission of bids and virtual bid opening for this action.
Q22. AD12.1 – Is the décor lighting included as part of Note 1 for removal?
A: Yes.
Q23. D/A12.1 Note 6 on the far right side of the page states “historic mural artwork…..” however the hatching appears to indicate existing diamond plate. Please clarify.
Fort Buchanan Commissary Pre-Bid Questions Page 4 of 1
A: See the attached revised sheet A12.1 for the corrected key notes.
Q24. Please provide hazardous material survey. Reference 00 31 00 – 1 1.1 D 1 Hazardous Material Report titled:
A: See the attached hazardous material survey.
Q25. G2.0 General Note A
a. Can the notification of 14-day requirement to commence work in a phase run concurrent with another phase?
A: Yes, as long as installed new equipment performance is acceptable. If performance of installed new equipment becomes unacceptable or troublesome, the 14-day requirement ia at the discretion of the DeCA Project Manager and/or Contracting Officer.
b. Can the 7-day requirement for the store to assume beneficial occupancy of a phase run concurrent with another phase?
A: Yes, as long as installed new equipment performance is acceptable. If performance of installed new equipment becomes unacceptable or troublesome, the 14-day requirement ia at the discretion of the DeCA Project Manager and/or Contracting Officer.
i. If the store is assuming “beneficial occupancy” of a phase, does this mean that the 12-month warranty period begins per 01 77 00 specification.
A: No, the warranty period for this project is governed by Specification 01 77 00 Closeout, Section 1.5.A.1 Warranty dates for Add/Alter Projects.
Q26. Please confirm it is acceptable to install the final UFC Décor elements once all of the refrigeration equipment is installed versus a phased décor installation.
A: This is acceptable.
Q27. G2.0 General Note G states to maintain egress/ingress/etc., has the base AHJ reviewed G2.1 and the barricading requirements for life safety?
A: Yes
Q28. Architectural demolition drawings show case protection rails being removed. The new construction architectural pages do not show any new case protection rails. Please confirm that DeCA does not want ANY case protection rails.
A: Confirmed
Q29. AD1.3 & AD1.4 Note 8 indicate the overhead coiling door and frame are to be removed. Please clarify if this is referencing the coiling door track or the support load bearing steel frame?
A: The coiling door track and hood are to be removed, and the load bearing frame is to remain.
Fort Buchanan Commissary Pre-Bid Questions Page 5 of 1
Q30. RMCS 23 90 09 16 – 7 Utility Monitoring: ….and/or other utility use..
a. Please clarify what utilities are to be included in language “other utility use”.
b. E 1 states to provide emergency shutoff in accordance with UFC 4-24-01 3-5 1.2. UFC criteria states “buildings must be provided with at least one emergency air distribution shutoff switch”.
This is not typical of DeCA requirements. Will one be adequate or will others be required?
A: Provide shut off switch per specification section 23 09 16
Q31. R2.2 Detail 1 Note 15 references E5.1. Please provide E5.1 Riser Diagram.
A: See response to Q20
Q32. General Notes G2.0 – Note D states contractor is to protect customers and employees from construction related activities during store operating hours. Unless noted otherwise, commissary to AVOID use of rooms/areas within current work……While Note E states – maintain access routes through areas of work for the safe passage of customers and employees during store operating hours.
a. Are the phases to be mutually occupied by the contractor/store employees/patrons?
b. If customers/store employees cause damage(s) to walls, refrigerated cases, materials, etc. who is responsible to correct this? At whose cost?
A: Phase two will be required to done during non-operational hours. See revised notes sheet G2.1
Q33. G2.0 Rm 50 & 52 are not included in the phasing plan.
A: See ‘ALL OTHER AREAS NOT INDICATED WITHIN A SPECIFIC CONSTRUCTION’ note on sheet G2.1.
Q34. A11.1 Room Finish Schedule – Room 73 & 77 Remarks F3 – Patch existing RES-1 floor finish as noted on drawings. Room finish schedule notes RES-2. AD1.1 Note 6 states to remove flooring for new floor finish.
a. Does the floor finish remove and replace in its entirety or is it to be patched and repaired?
A: See response Q9.
Q35. A11.1 Rooms 50 & 52 notes Ex-Conc for floor finish. AD1.4 Note 6 states Remove ceramic tile floor finish & setting bed to sub slab.
a. A8.1 Detail A notes no flooring indicated in either room (matching finish schedule)
b. A8.1 Detail C states “….. at transition between wall tile and FLOOR tile…..”.
i. What is the floor finish and necessary scope for these rooms?
A: Provide CT-2 floor finish per the attached updated sheet A11.1.
Q36. A8.1 Is ceramic tile required behind the lockers?
A: Yes, See updated sheet A8.1
Fort Buchanan Commissary Pre-Bid Questions Page 6 of 1
Q37. A1.3 Note 7 Mechanical Chase see detail B/A9.2.
a. A9.2 does not exist.
A: The detail is J on sheet A10.1. See the attached sheet A1.3.
Q38. K/A10.1 also references A9.2.
A: The detail is J on sheet A10.1. See the attached sheet A10.1.
Q39. AD12.1 note 5 notes wainscot vinyl FRP to be removed, wall to be prepped for new finish. This note is found in 4 locations on this elevation. A12.1 D Interior Elevation in two places notes RWC-1. Please clarify the limits of the demolition and the new.
A: Where wainscot FRP is removed provide new FRP. See revised sheet A12.1
Q40. AD12.1 Note 4 Existing wood protection rails to remain. F/A12.1 shows new wood protection rails.
No new wood protection rails are identified on the drawings. Please clarify.
A: No new wood protection rails are required on the project. Detail F/A10.1 has been updated to note the wood protection rails are existing to remain. See the attached updated sheet A10.1
Q41. 23 01 00 Maintenance & Repair for HVAC and Refrigeration 3.3 Government Reimbursement
a. Reimbursement for parts/Equipment: The government shall reimburse for individual parts or equipment, which exceeds $500. Is this aggregate or per incident?
A: This cost over $500 is per part/equipment. Read excluded items.
Q42. AD1.0 indicates 10 gondola runs as “Equipment to be relocated by contractor”. A1.0 shows new gondola spacing. Are the existing gondolas to be relocated in accordance with a store reset? Or, are the existing gondolas simply to be relocated to the new spacing? Meaning can the existing gondolas be shifted, regardless of product, to the locations dimensioned on A1.0?
A: Yes
Q43. PL-CS. Customer Service décor. This item is tagged on the overhead, but the elevations is tagged as existing and no other notes. Please clarify.
A: Provide Customer Service Décor per revised key note 27. See the attached updated sheet A12.1.
Q44. They mechanical schedule shows unit C being designated for the Chilled Receiving 54A box (low temp). 75 MBH (minimum) for Mark C and 54A is 35 MBH.
A: See revised sheet R3.1 for correct capacities.
Q45. A1.0 1DXX shows as 11’ and spec. shows it to be 6’. Please advise.
Fort Buchanan Commissary Pre-Bid Questions Page 7 of 1
A: 11’ is correct.
Q46. The elevations show painting of the interior Rm 69 Sales Area. The finish schedule notes existing.
Which is correct?
A: Paint Sales Area room 69 per the elevations. See the attached revised sheet A11.1
Q47. With the new refrigeration system and exposed ceiling system, is the new piping required to be painted in the exposed areas?
A: See response to Q4
Q48. Specifications note leak detection required for walk-in boxes. With this system utilizing considerably smaller refrigerant charges, please confirm DeCA wishes to have leak detection installed per this contract.
A: Provide leak detection.
Q49. Specifications and drawings make no reference to water treatment for closed loop system. Is this required for this project?
A: See the revised attached specification Section 23 90 00.
Q50. The access to the sales floor has (2) sets of double doors with tube steel frame. They are 7’ tall. The new refrigerated cases will not fit through the opening. DeCA should consider installation of 8’ doors and frames for this project and future work associated with this project.
A: See phasing note ‘L’ on sheet G2.0.
Q51. There are several places that note patch and repair of flooring. For example, AD1.2 Note 7 shows several places of patching damaged terrazzo. During the site visit, it was noted that these areas are fairly small in size. Are the limits of the floor patching to be done to scale or to the limits of the damage noted on the walk through?
A: Locations are shown for location. Patch damaged area of floor.
Q52. A1.1 includes a Note 6 which states, “Patch and repair existing damaged terrazzo flooring (1,000SF Max). Verify location in the field. Match color and pattern. However, the Note 6 is not identified on the drawing. Is this to be included?
A: Key note 6 is not used on sheet A1.1. See the attached revised sheet A1.1
Q53. The same question also applies to the damaged resinous flooring in the Meat Area. It notes (3) locations of resinous flooring damage. How is this to be quantified? Are these locations to be quantified as each, square footage, or other?
A: See response to Q51
Fort Buchanan Commissary Pre-Bid Questions Page 8 of 1
Q54. Soffit details H, K, L, & M on A9.1 do not match the existing soffit construction. Are existing soffits to be terminated at 8’ per the details?
A: Yes
Q55. AD1.3 note 6 states to remove dock bumpers. The dock bumpers on these doors are in great shape.
The dock seals are falling apart.
Please clarify if the intent was to replace the dock seals in lieu of the dock bumpers.
A: Remove dock seals, not dock bumpers. See revised sheet AD1.3 and AD1.4.
Q56. A1.0 shows the 1P07 to have doors but the spec. shows to be a multi deck. Please advise A: See response to Q2
Q57. Utilizing the capacities from the schedule in the adiabatic fluid cooler (BAC) calculator, we are showing that model is almost 20% short on capacity. This also calls into question whether the GPM listed on the schedule is accurate.
A: See revised sheet R3.1 for revised capacities.
Q58. The unit cooler schedule condensing unit types do not meet the MBH minimums listed in the packaged condensing unit schedule on R3.1.
A: See response to Q44
Fort Buchanan Commissary - staging area
Paul Zellmer Rectangle
Paul Zellmer Rectangle
Paul Zellmer Rectangle
Paul Zellmer Callout OfficeTrailer Location 1
Paul Zellmer Callout Office Trailer Location 2
Paul Zellmer Callout Material Trailers
ABOVE
MECH MEZZANINE
1A03
1A03 1A03
1A03
CO
MP
UT
ER
A
CC
ES
SO
RI
ES
RECEIVING DOCK
AT GRADE TRASH
PLATFORM
S
LO
P E
R A
M P
R E
F.
C
IV
IL
D W
G S
DN
D N
1A031A03
43A
1A
1B8
31A
3A2A2B3B 6/19
20C77
37A
21B
19B
21A
20A 63
54A
83B
65A
61/62
50 52
57 47A 45
44B
44A
65B
20B
18 19A
16A
D
D.1
F
G.6
G.6
H
K
L
N
Q
V
C
B
A
17161513121110.11098654321
1716141211
109754321
2R
1D09
1B2
1C
1G
1D2 1E1
1F 1E1
2A
2B
COMPOSITE CONSTRUCTION PHASING PLAN
SCALE: 1/16" = 1'-0"
GRAPHIC SCALE: 1/16" = 1'-0"
0 8' 16' 32'
MEZZANINE
G.9
D
F
DN
UP
G.6
83A
83B
H
10.1
2R
-1
2R
-1
2R
-1
2R
-1
2R
-1
2R
-1
2R
-1
2R
-1
1A
1A
1H
1E21D1
1D1
1B1
PHASING DIAGRAM
STORE OPERATING HOURS
SUNDAY: 0830 - 1900
MONDAY: CLOSED
TUESDAY: 0830 - 1900
WEDNESDAY: 0830 - 1900
THURSDAY: 0830 - 1900
FRIDAY: 0830 - 1900
SATURDAY: 0830 - 1900
CONFIRM STORE OPERATING AND STORE NON-OPERATING HOURS
WITH GOVERNMENT PRIOR TO COMMENCING WORK AS HOURS MAY
HAVE CHANGED
GENERAL NOTES
DRAWN BY:
SUBMITTED BY::
ENGINEER:
REVIEWED BY:
DESIGNED BY:
SYM. D.O. NO. ACTION DATE
DATE:
DRAWING NUMBER
CONTR. NO.
SOL. NO.
COMMISSARY
DESCRIPTION OF REVISION
SEQUENCE
NO.
FORT BUCHANAN
PUERTO RICO
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
DIRECTORATE OF ENGINEERING
FORT GREGG-ADAMS, VIRGINIA
300 Park Boulevard, Sui te 250 I tasca , I l l i no is 60143-2655
28 JUN 2023
REFRIGERATION, HVAC,
AND DECOR UPGRADE
28 JUN 23 SOLICITATION ISSUE - RTA
SYMBOL LEGEND
NOTE : THIS DRAWING TO BE
VIEWED / PRINTED IN COLOR
A. PHASE WORK AS INDICATED. COMMISSARY WILL CONTINUE TO OCCUPY AND CONDUCT BUSINESS
THROUGHOUT DURATION OF PROJECT. REFER TO SPECIFICATIONS AND SHEET G2.1 FOR EACH
SPECIFIC PHASE AND FOR ADDITIONAL INFORMATION. NOTE: NOT MORE THAN 1/2 OF EACH TYPE
OF REFRIGERATED CASE CAN BE NON OPERATIONAL AT ANYTIME. WORK CLOSELY WITH
COMMISSARY PERSONNEL ON SCHEDULING OF WORK. PROVIDE MINIMUM 14 CALENDAR DAYS
WRITTEN NOTICE OF INTENT TO COMMENCE WORK IN EACH PHASE AND / OR REMOVE / REPLACE
/ RELOCATE EQUIPMENT / FURNISHINGS SO AS TO MINIMIZE DISRUPTION OF STORE
OPERATIONS AND DOWN TIME ON REFRIGERATED DISPLAY CASES. SCHEDULE 7 CALENDAR DAYS
AT THE END OF EACH PHASE AS TIME FOR THE COMMISSARY TO ASSUME BENEFICIAL OCCUPANCY.
PREPARE AND SUBMIT FOR APPROVAL, A DETAILED SCHEDULE INDICATING START AND FINISH
DATES FOR ALL PHASES.
B. THIS DRAWING IS SCHEMATIC IN NATURE AND SERVES AS A GENERAL GUIDE INTENDED TO
ILLUSTRATE THE SEQUENCING AND LOCATIONS OF EACH PHASE. THE HEAVY LINES DEPICT THE
APPROXIMATE BOUNDARIES OF EACH PHASE WITHIN THE BUILDING'S INTERIOR. THESE
BOUNDARIES SHALL BE DEFINED BY TEMPORARY CONSTRUCTION BARRIERS. IN ORDER TO
COMPLETE WORK IN THE CURRENT WORK PHASE, IT WILL MOST LIKELY BE NECESSARY TO
POSITION THE TEMPORARY BARRICADES IN A LOCATION SLIGHTLY DIFFERENT FROM THAT SHOWN
ON THIS DRAWING. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF THE
TEMPORARY BARRICADES IN CONJUNCTION WITH DeCA, SO AS TO MINIMALLY IMPACT ADJACENT
PHASES INTENDED TO REMAIN IN OPERATION.
C. UNLESS NOTED OTHERWISE, WORK IN EACH PHASE MAY BE COMPLETED DURING STORE
OPERATING HOURS. UNLESS NOTED OTHERWISE, COMMISSARY TO AVOID USE OF ROOMS / AREAS
WITHIN CURRENT WORK PHASE UNTIL COMPLETION OF WORK WITHIN THAT PHASE.
D. PROTECT CUSTOMERS AND EMPLOYEES FROM CONSTRUCTION RELATED ACTIVITIES BY
PROVIDING TEMPORARY CONSTRUCTION BARRIERS AROUND PERIMETER AT EACH AREA OF WORK.
REFER TO DETAILS ON THIS SHEET.
E. MAINTAIN ACCESS ROUTES THROUGH AREAS OF WORK FOR THE SAFE PASSAGE OF CUSTOMERS
AND EMPLOYEES DURING STORE OPERATING HOURS. PROVIDE TEMPORARY CONSTRUCTION
BARRIERS TO IDENTIFY ACCESS ROUTES AND COVERED PLYWOOD ENCLOSURES DURING PERIODS
OF HAZARDOUS OVERHEAD WORK.
F. GOVERNMENT IS RESPONSIBLE FOR REMOVAL / RELOCATION OF MERCHANDISE WITHIN EACH
AREA OF WORK AND WILL DO SO AFTER RECEIPT OF CONTRACTOR'S WRITTEN NOTICE OF INTENT
TO COMMENCE WORK. CONTRACTOR SHALL TEMPORARILY REMOVE / RELOCATE EXISTING
EQUIPMENT / FURNISHINGS NEEDED TO COMPLETE WORK. THE SAME EQUIPMENT / FURNISHINGS IS TO BE REINSTALLED BACK TO ORIGINAL LOCATIONS, CLEANED AND FULLY OPERATIONAL DURING
STORE OPERATING HOURS, UNLESS THAT AREA OF WORK IS NOT DESIGNATED FOR COMMISSARY
USE DURING STORE OPERATING HOURS. PROTECT EXISTING ROOM / EQUIPMENT / FURNISHINGS / PRODUCTS IN AREAS OF WORK WHERE RELOCATION IS NOT NECESSARY. MAINTAIN IN OPERATION, EXISTING EQUIPMENT OUTSIDE AREAS OF WORK AND PROVIDE TEMPORARY UTILITY LINES /
CONNECTIONS NEEDED TO DO SO.
G. MAINTAIN INGRESS, EGRESS, FIRE EXITS AND SECURITY AT ALL TIMES.
H. GOVERNMENT WILL ALLOW CONTRACTOR USE OF AN AREA WHERE SHOWN FOR CONSTRUCTION
STAGING AND EQUIPMENT STORAGE. CONTRACTOR TO COMPLY WITH APPLICABLE REGULATIONS
(I.E. FENCING, UTILITIES, HAUL ROUTES, ACCESS HOURS, ETC.). CONTRACTOR IS RESPONSIBLE
FOR SECURITY OF CONSTRUCTION RELATED EQUIPMENT / MATERIALS AND DAMAGE TO BASE
PROPERTY / EQUIPMENT CAUSED BY CONSTRUCTION RELATED ACTIVITIES / PERSONNEL. UPON
PROJECT COMPLETION, REMOVE TEMPORARY FACILITIES, RESTORE LANDSCAPING, PAVEMENTS
AND OTHER PREVIOUSLY EXISTING ITEMS HAVING BEEN DAMAGED OR ALTERED DURING
CONSTRUCTION TO ORIGINAL CONDITION OR BETTER.
J. IT IS LIKELY THAT THE CURRENT AREA OF WORK WILL REQUIRE CONNECTIONS TO UTILITIES OUTSIDE THAT AREA OF WORK. IF SO, OBTAIN PRIOR APPROVAL FROM DeCA AND MAKE
CONNECTIONS WITH MINIMAL DISTURBANCE TO COMMISSARY OPERATIONS.
K. GOVERNMENT WILL REASONABLY ATTEMPT TO MAKE UTILITIES AVAILABLE FOR CONTRACTOR'S
TEMPORARY USE AS EXISTING UTILITY LINES / CONNECTIONS MAY OR MAY NOT BE LOCATED
NEARBY. IN ANY CASE, CONTRACTOR SHALL INSTALL AND MAINTAIN NEEDED UTILITY LINES /
CONNECTIONS AND REMOVE SAME PRIOR TO FINAL ACCEPTANCE OF WORK. GOVERNMENT IS NOT
LIABLE FOR CONTRACT DELAYS, DAMAGES OR COST INCREASES RESULTING FROM INTERRUPTION
OF UTILITY SERVICES.
L. CONTRACTOR IS RESPONSIBLE FOR DETERMINING HOW TO TRANSFER NEW AND EXISTING
EQUIPMENT INTO AND OUT OF WORK AREA, AS EQUIPMENT MAY OR MAY NOT FIT THROUGH
EXISTING DOOR OPENINGS. IF CONTRACTOR CHOOSES TO ROUTE EQUIPMENTTHROUGHT EXISTING OPENINGS THAT ARE TOO SMALL, TEMPORARILY REMOVE EXISTING DOOR(S) / DOOR FRAME(S) AND INCREASE SIZE OF WALL OPENING(S) AS NEEDED. CONTRACTOR IS RESPONSIBLE FOR DESIGN AND INSTALLATION OF ADDITIONAL FRAMING / HEADERS THAT MAY BE NEEDED FOR UPPORT OF WALL(S) ABOVE OPENING(S). RESTORE WALL OPENING(S) AND REINSTALL PREVIOUSLY REMOVED DOOR(S) /
DOOR FRAME(S) AFTER EQUIPMENT HAVE BEEN REPLACED.
M. SEE STRUCTURAL, PLUMBING, FIRE PROTECTION, MECHANICAL, REFRIGERATION AND ELECTRICAL
DRAWINGS FOR ADDITIONAL CONSTRUCTION PHASING REQUIREMENTS.
N. STORAGE OF CONSTRUCTION EQUIPMENT AND MATERIALS WITHIN BUILDING IS NOT PERMITTED, EXCEPT IN ACTIVE CONSTRUCTION PHASES. CONTRACTOR TO PROVIDE SEPARATE ON-SITE OR
OFF-SITE STORAGE FOR EQUIPMENT AND MATERIALS AS REQUIRED.
APPROVED SUBMITTALS
NOTICE TO PROCEED
1A 1B1 1C 1D1 1E1
2A
1F
2B
DEMOLISHED CONSTRUCTION OR RELOCATED
EQUIPMENT BY CONTRACTOR
NEW CONSTRUCTION OR RELOCATED
EQUIPMENT BY CONTRACTOR
EXISTING CONSTRUCTION OR EXISTING EQUIPMENT
TO REMAIN
1G 1H
COMPOSITE CONSTRUCTION PHASING PLAN
G2.0
PFZ
RMS
KNB
ADDENDUM 1 MISCELLANEOUS REVISIONS29 MAY 241
1B2 1D2 1E2
AutoCAD SHX Text
1500 KW STANDBY
AutoCAD SHX Text
GENERATOR SET
AutoCAD SHX Text
STORAGE TANK
AutoCAD SHX Text
8000 GAL FUEL
AutoCAD SHX Text
TCOM
AutoCAD SHX Text
XFMR
AutoCAD SHX Text
GENERATOR SET
AutoCAD SHX Text
50 KW EPOS
2A01 2A
DF
1D08
2D02
2R24 2R242R24
2R24 2R24 2R242R24
2D01
1D05
2K
2A
2K
2A01
2K04
2D02 1B01
1R09
1R01
2G14P
2G14P
2R16
2K04
2K04
2R
2R
2R
2R
2R182R182R182R182R182R18
2R182R182R182R182R182R18 2R182R182R182R182R182R18 2R182R182R182R182R18
2R
2R
2R
2R
2R
2R
2R182R182R18 2R182R182R182R182R182R18 2R182R182R182R182R18 2R18
2R
2R182R182R18 2R182R182R182R182R182R18 2R182R182R182R182R18 2R18
2R182R182R18 2R182R182R182R182R182R18 2R182R182R182R182R18 2R18
2R
2R182R182R18 2R182R182R182R182R182R18 2R182R182R182R182R18 2R18
2R182R182R18 2R182R182R182R182R182R18
2R182R182R18 2R182R182R182R182R182R18
2R182R182R18 2R182R182R182R182R182R18
2R182R182R18 2R182R182R182R182R182R18 2R
2R
2R182R182R18 2R182R182R182R182R182R18
2R182R182R18 2R182R182R182R182R182R18
2R
2R16
2R16
2R
2R
2R
2R
2R
2R
2R
2R
2R
2R
2R
2R21
2R
20C77
37A
21B
19B
2G
A T
Y P
IC
A
L
1G
G
D -1
1G
G
D -1
1G
G
D -1
1G
-5 1G
-5
1G
-5
1G
-5 1G
-5
1G
-4
1G10-3
1G
-3
1D00-121D00-12
1G
1G27-3
1G10-2
1G27-5
1G27-5
1G
-8 M
A
TC
H L
IN
E
A R
E A
'B
M A
TC
H
L
IN
E A
R E
A 'A
MATCH LINE
AREA 'A'
MATCH LINE
AREA 'C'
9754321
1G10-5 1G10-4
1G
G D
-1
1G
G D
-1
1G
G D
-1
1DXX
DELI
2R
L
N
Q
V
754321 9
ALIGN
4'-6 1/2" 23'-6"
3' -0
3' -1
0"
'-5
/2
1' -3
'-4
8'-7" 11'-0"
4'-1 1/2" 24'-1"
8'- 2"
3'-0"
12'-6 1/2" 6'-0 1/2" 12'-7" 8'-3 1/2" 12'-6" 6'-8 1/2" 7'-6"
9' -3
3'
-5
/2
'-3
/2
'-1
/2
'-6
/2
3 3 3
3 3
DRAWN BY:
SUBMITTED BY::
ENGINEER:
REVIEWED BY:
DESIGNED BY:
SYM. D.O. NO. ACTION DATE
DATE:
DRAWING NUMBER
CONTR. NO.
SOL. NO.
COMMISSARY
DESCRIPTION OF REVISION
SEQUENCE
NO.
FORT BUCHANAN
PUERTO RICO
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
DIRECTORATE OF ENGINEERING
FORT GREGG-ADAMS, VIRGINIA
300 Park Boulevard, Sui te 250 I tasca , I l l i no is 60143-2655
28 JUN 2023
REFRIGERATION, HVAC,
AND DECOR UPGRADE
28 JUN 23 SOLICITATION ISSUE - RTA
FLOOR PLAN - AREA A
NORTH
PLAN
KEY PLAN
2'0 16'8'4'
GRAPHIC SCALE: 1/8" = 1'-0"
A
SHEET KEYNOTES1
SYMBOL LEGEND
NOTE : THIS DRAWING TO BE
VIEWED / PRINTED IN COLOR
NEW WALL BY
CONTRACTOR ( RED )
REMAIN ( BLACK )
EXISTING TO
NEW EQUIPMENT BY
CONTRACTOR ( RED )
GALVANIZED STEEL CLOSURE AT
TOP OF CASE. SEAL AIR TIGHT
(RED)
CASE CORER GUARD ( 10 26 00 )
B
C D
NEW ROOM INDEX
1A ENTRY VESTIBULE
1B ENTRY VESTIBULE
2A EXIT VESTIBULE
2B EXIT VESTIBULE
3A CART RETURN VESTIBULE
3B CART RETURN VESTIBULE
4 CASHIER'S OFFICE
5 CASH COUNTING ROOM
6/19 CUSTOMER SERVICE OFFICE / STORE MANAGER
8 CART STORAGE
10 CUSTOMER RESTROOM (MEN)
11 CUSTOMER RESTROOM (WOMEN)
12 STORE DIRECTOR OR COMMISSARY OFFICER
14 ADMINISTRATIVE CORRIDOR
15 ADMINISTRATIVE AREA
16A EMPLOYEE BREAKROOM - ADMIN AREA
18 STORE ADMINISTRATOR
19A STORE MANAGER
19B STORE MANAGER
20A JANITOR'S CLOSET
20B JANITOR'S CLOSET
20C JANITOR'S CLOSET
21A VESTIBULE (RECEIVING/STAGING TO SALES AREA)
21B VESTIBULE (STAGING TO SALES)
23 DAMAGED MERCHANDISE
24 DAMAGED MERCHANDISE SALES NICHE
29 CONTROLLED TEMPERATURE STORAGE
31A CISIC ROOM
32 SENSITIVE STORAGE
34 MEDICAL FOOD INSPECTION OFFICE
35 RECEIVING MANAGER
36 RECEIVING AREA
37 STAGING AREA
37A STAGING AREA
38 MHE CHARGING AREA
43A PRODUCE CHILLED STORAGE
44A PRODUCE PROCESSING
44B PRODUCE AMBIENT STORAGE
45 PRODUCE MANAGER
46 SUSHI DISPLAY AREA
47 MEAT/PRODUCE OPERATING SUPPLY STORAGE
47A MEAT/PRODUCE OPERATING SUPPLY STORAGE
48 MEAT/PRODUCE BREAK ROOM
50 MEAT/PRODUCE MEN'S LOCKER
52 MEAT/PRODUCE WOMEN'S LOCKER
54 RECEIVING AISLE
54A CHILLED RECEIVING AISLE
55 MEAT PROCESSING
56 MEAT WRAPPING
57 MEAT MANAGER
59 MEAT CHILL STORAGE
61/62 PREPACKAGED MEAT CHILL STORAGE POULTRY
CHILL STORAGE
63 MECHANICAL CHASE TO MEZZANINE
65A AISLE RECEIVING TO SALES
65B AISLE RECEIVING TO SALES
67 DAIRY CHILL STORAGE
68 FROZEN FOOD STORAGE
69 SALES AREA
73 DELI PREPARATION AREA
77 DELI CHILL STORAGE
80 BAGGER BREAKROOM
81 CHECKOUT
82 CUSTOMER CHECKOUT QUEUING
83A MECHANICAL MEZZANINE
83B MEZZANINE STAIR
93 CASHIER'S LOCKER AREA
1. SALES AREA RM 69:
BASE PROVIDE RESILIENT BASE THROUGHOUT SALES AREA (M)
WALLS PROVIDE GWB PARTITIONS AS INDICATED - PAINT (M)
SOFFITS PAINT EXISTING SOFFITS AS INDICATED (M)
MISC PROVIDE DÉCOR, SOFFIT SIGNAGE, GRAPHICS, TRIM, ETC. THROUGHOUT SALES AREA (E) EQUIPMENT PROVIDE REFRIGERATED DISPLAY CASES AND OTHER EQUIPMENT AS INDICATED (E)
2. PROVIDE CONDENSING UNITS FOR DELI BAKERY ON EXISTING STORAGE RACKS (E)
3. DIMENSION INDICATED IS BASED ON SPECIFIED DISPLAY CASE MANUFACTURER FIXTURE SIZE AND REQUIRED CLEARANCES. IF COMPARABLE PRODUCTS FROM ANOTHER MANUFACTURER ARE PROVIDED, ADJUST DIMENSIONS ACCORDINGLY
4. PROVIDE 6'-0” HIGH STAINLESS STEEL METAL COLUMN COVER AT EXISTING STEEL COLUMNS. FORM COLUMN COVER TO TIGHTLY FIT BUILDING COLUMN. RETURN VERTICAL EDGES AND BEND TO FORM HOOK THAT WILL ENGAGE CONTINUOUS MOUNTING CLIPS. SECURE TO COLUMN WITH ADHESIVE. PAINT
EXPOSED STEEL COLUMN ABOVE METAL COLUMN COVER (05 50 13)
5. NEW CONCRETE FLOOR SLAB AT PLUMBING WITH NEW TERRAZZO FINISH TO MATCH EXISTING, SEE
DETAIL J/A8.1
6. NOT USED
7. PROVIDE CONDENSING UNITS FOR ROOM 29 ON EXISTING STORAGE RACK SHELF OVER DOOR
8. RESINOUS FLOOR FINISH, SEE FINISH SCHEDULE
9. EXISTING GUARDS, FOOT GUARDS, BOLLARDS, RAILING AND CURBS TO RECEIVE NEW "YELLOW SAFETY
PAINT".
BY CONTRACTOR ( GREEN )
EXISTING EQUIPMENT RELOCATED
NEW CONCRETE FLOOR SLAB AND
TERRAZZO FINISH
RESINOUS FLOOR FINISH
FLOOR PLAN - AREA A
A1.1
PFZ
RMS
KNB
ADDENDUM 1 MISCELLANEOUS REVISIONS29 MAY 241
DN
UP
CWS/CWRCWS/CWR
CWS/CWR
CW
RL/RS
RL/RS
RL/RS
RL/RS
RL/RS
CW
C W
S C
W R
RL/RS
RL/RS
RL/RS
RL/RS
RL/RS
RL/RS
RL/RS
RL/RS
CW
T
15 17
7 E-97 E-8
FLOOR PLAN - MEZZANINE
REFRIGERATION
R1.5
CLC
RLJ
CLC
DRAWN BY:
SUBMITTED BY::
ENGINEER:
REVIEWED BY:
DESIGNED BY:
SYM. D.O. NO. ACTION DATE
OF
SHEET NO.
DATE:
DRAWING NUMBER
CONTR. NO.
SOL. NO.
COMMISSARY
DESCRIPTION OF REVISION
SEQUENCE
NO.
FORT BUCHANAN
PUERTO RICO
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
DIRECTORATE OF ENGINEERING
FORT LEE, VIRGINIA
300 Park Boulevard, Sui te 250
I tasca , I l l i no i s 60143-2655
28 JUN 2023
28 JUN 23
SOLICITATION ISSUE - RTA
REFRIGERATION, HVAC,
AND DECOR UPGRADE
KEY PLAN
NEW ROOM INDEX
A B
C D
1 ENTRY VESTIBULE: 99 SF
2A EXIT VESTIBULE: 103 SF
2B EXIT VESTIBULE: 102 SF
2C EXIT VESTIBULE: 104 SF
3A CARRYOUT RETURN: 103 SF
3B CARRYOUT RETURN: 103 SF
4 CASHIER'S OFFICE: 180 SF
4A SAFE ROOM: 56 SF
5 CASH COUNTING RM: 74 SF
6 CUSTOMER SERVICE OFFICE: 108 SF
9 FAMILY RESTROOM: 66 SF
10 CUSTOMER RESTROOM (MEN): 170 SF
11 CUSTOMER RESTROOM (WOMEN): 174 SF
12 STORE DIRECTOR: 162 SF
14 ADMIN. CORRIDOR: 128 SF
15 ADMINISTRATIVE AREA: 1207 SF
15A SECURE STORAGE: 70 SF
15B SECRETARIES OFFICE: 178 SF
16A EMPLOYEE BREAKROOM: 798 SF
17 TRAINING ROOM: 346 SF
18 STORE ADMINISTRATOR: 150 SF
19 STORE MANAGER: 172 SF
19B GROCERY MANAGER: 130 SF
20A JANITOR'S CLOSET: 46 SF
20B JANITOR'S CLOSET: 46 SF
20C JANITOR'S CLOSET: 52 SF
21A VESTIBULE (RECEIVING/STAGING TO SALES
AREA): 136 SF
21B VESTIBULE (RECEIVING/STAGING TO SALES
AREA): 139 SF
21C VESTIBULE: 991 SF
22 ADMINISTRATIVE STORAGE: 550 SF
23 DAMAGED MERCHANDISE: 214 SF
25 LOCKER ROOM (WOMEN): 161 SF
26 EMPLOYEE RESTROOM (WOMEN): 118 SF
27 EMPLOYEE RESTROOM (MEN): 280 SF
28 LOCKER ROOM (MEN): 200 SF
29 CONTROLLED TEMPERATURE STORAGE:
506 SF
30 CONTRACT STOCKER STORAGE: 214 SF
31 MEZZANINE STAIR: 108 SF
31A COMMUNICATIONS ROOM (CISIC): 154 SF
31B COMMUNICATIONS CLOSET (CISIC): 208 SF
31C COMMUNICATIONS CLOSET (CISIC): 28 SF
31D MECHANICAL ROOM: 145 SF
31E ELECTRICAL ROOM: 249 SF
31F ELECTRICAL ROOM: 147 SF
32 SENSITIVE STORAGE: 362 SF
35 RECEIVING MANAGER: 73 SF
36A RECEIVING AREA: 507 SF
36B RECEIVING AREA: 472 SF
37 STAGING AREA: 24,733 SF
38 MHE CHARGING AREA: 183 SF
39 MASS DISPLAY AREA: 597 SF
43A PRODUCE CHILLED STORAGE: 428 SF
43B PRODUCE CHILLED STORAGE (GAS): 428 SF
44A PRODUCE PROCESSING: 467 SF
44B PRODUCE AMBIENT STORAGE: 424 SF
45 PRODUCE MANAGER'S OFFICE: 124 SF
47 OPERATING SUPPLY STORAGE: 134 SF
47A OPERATING SUPPLY STORAGE: 350 SF
54 RECEIVING AISLE: 1542 SF
55 MEAT PROCESSING: 1641 SF
56 MEAT WRAPPING: 1086 SF
56A MEAT HOLDING: 228 SF
57 MEAT MANAGER'S OFFICE: 103 SF
59 MEAT CHILL STORAGE: 1891 SF
67 DAIRY STORAGE: 2103 SF
68 FROZEN FOOD STORAGE: 2304 SF
68A FROZEN VESTIBULE: 128 SF
68B FROZEN VESTIBULE: 131 SF
69 SALES AREA: 36,515 SF
70 DELI SERVICE AREA: 280 SF
72 BAKERY SERVICE AREA: 304 SF
73 DELI PREP. AREA: 538 SF
74 BAKERY PREP. AREA: 815 SF
75 BAKERY CHILL STORAGE: 197 SF
76 BAKERY FREEZER: 185 SF
80 BAGGER BREAKROOM: 404 SF
81 CHECKOUT: 4331 SF
82 SINGLE LINE QUEUING: 619 SF
83 MECHANICAL MEZZANINE: 3028 SF
84 VENDOR'S ROOM: 155 SF
29 MAY 24
ADDENDUM 1 MISCELLANEOUS REVISIONS
1 PROVIDE PACKAGED PUMP SYSTEMS, WITH HYDRONIC SPECIALTIES, FOR CASES AND COOLERS. X
BID CATEGORIES
EM C
ITEMS OF WORK
X
MECHANICAL MEZZANINE
SCALE: 1/8" = 1'-0"
2 PROVIDE ELECTRICAL PANELS AND WIRING FOR NEW REFRIGERATION EQUIPMENT. X
3 PROVIDE REMOTE CONDENSING UNITS FOR UNIT COOLERS, PIPING, WIRING, AND CONTROLS. MOUNT ON CONDENSING
UNIT RACK. SEE ARCHITECTURALS.
X
4 PROVIDE RMCS PANELS AS NEEDED. X
5 PROVIDE REFRIGERANT PIPING AND WIRING TO REMOTE CASES AND CONDENSING UNITS. SEE R1.3 FOR CONTINUATION.X
6 SEE R1.3 FOR CONTINUATION. X
7 EXHAUST FAN CONTROLLED BY RMCS. X
9 SENSOR TO CONTROL E-8 AND E-9. X
8 PROVIDE 3/4" MAKE-UP WATER PIPING TO CONDENSER WATER SYSTEM WITH RPZ BACKFLOW PREVENTER. PIPE AIR GAP
TO FLOOR DRAIN AT WATER HEATERS.
X
10 PROVIDE CURRENT TRANSDUCERS IN EXISTING SWITCHBOARD FOR RMCS. X
11 PROVIDE TRANSFORMER(S) FOR NEW REFRIGERATION EQUIPMENT. X
12 SEE R1.4 FOR CONTINUATION. X
13 PROVIDE 1200A FUSED SWITCH AND ASSOCIATED HARDWARE FOR NEW REFRIGERATION EQUIPMENT. SEE RISER DIAGRAM
THIS SHEET.
X
14 PROVIDE NEW FEEDER TO EXISTING PANEL LEFT DISCONNECTED BY REMOVAL OF REFRIGERATION EQUIPMENT. X
2'0 16'8'4'
GRAPHIC SCALE: 1/8" = 1'-0"
NOT USED
TYPICAL MECHANICAL YARD PIPE SUPPORT
2'-0"x0'-8"x0'-8" CONCRETE
PAD.
PRE-PAINTED UNISTRUT
CHANNEL.
MAKE-UP WATER PIPING. APPROVED PIPE
CLAMPS.
EXISTING GRADE.
ANCHOR BOLT, TYPICAL
OF 2.
CONDENSER WATER PIPING
WITH 1/2" FLEX FOAM
INSULATION AND ALUM.
JACKET.
2" MIN.
RISER DIAGRAM
NO SCALE
SYMBOLS LEGEND
SEE REFRIGERATION PLAN
FOR WORK BY REF.
CONTRACTOR.
THREE SETS
4 #600MCM + #3/0 GND
EACH SET IN 4" CONDUIT
PROVIDE 1200A FUSED SWITCH AND
ASSOCIATED HARDWARE TO EXISTING
SPACE
4 #3/0 + #6 GND 2"C.
15 MOUNT CONDENSING UNITS FOR UNIT COOLERS ON SHELVING SYSTEM, SEE ARCH PLANS. PROVIDE CONDENSER WATER
PIPING, POWER WIRING, AND CONTROL WIRING TO CONDENSING UNITS.
X
16 CONDENSING UNITS FOR UNIT COOLERS 8-17. X
17 CONDENSING UNITS FOR UNIT COOLERS 18-36. X
REMOVE FAILED METER.
INSTALL NEW METER FOR RMCS.
SEE 23 09 16.
PROVIDE SUBMETER FOR REFRIG
POWER PER 23 09 16 2.3.H.
NOTE: THIS DRAWING TO BE
VIEWED / PRINTED IN COLOR
SEE 23 90 00 3.3.C FOR DELEGATED DESIGN REQUIREMENTS
FOR REFRIGERATION ELECTRICAL WORK.
PROVIDE ARC FLASH CALCULATIONS AND ARC FLASH LABELS ON
ALL NEW AND EXISTING EQUIPMENT, INCLUDING ALL
PANELBOARDS, TRANSFER SWITCHES, DISTRIBUTION GEAR, ETC.
Refrigeration, HVAC, Addendum No1 MAY 2024 and Decor Upgrade Fort Buchanan, Puerto Rico
COORDINATED POWER SYSTEM PROTECTION
26 28 01 - 1
SECTION 26 28 01
COORDINATED POWER SYSTEM PROTECTION
(Edited from DeCA June 2022 Design Criteria)
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Computer-based, fault-current and overcurrent protective device coordination studies, and the setting of these devices.
B. Electrical system shall be fully rated. Series rated systems and equipment are prohibited.
1.2 SUBMITTALS
A. Product Data: For computer software program to be used for studies.
B. Product Certificates: For coordination-study and fault-current-study computer software programs, certifying compliance with IEEE 399.
C. Qualification Data: For coordination-study specialist.
D. Other Action Submittals (Due before final setting of overcurrent devices prior to energizing the service):
1. Coordination-study input data, including completed computer program input data sheets.
2. Coordination-study report.
3. Equipment evaluation report.
4. Setting report.
1.3 QUALITY ASSURANCE
A. Studies shall use computer programs that are distributed nationally and are in wide use.
Software algorithms shall comply with requirements of standards and guides specified in this Section. Manual calculations are not acceptable.
B. Coordination-Study Specialist Qualifications: An organization experienced in the application of computer software used for studies, having performed successful studies of similar magnitude on electrical distribution systems using similar devices.
C. Testing Agency Qualifications: Member company of the InterNational Electrical Testing Association.
1. Testing Agency's Field Supervisor: Person currently certified by the InterNational Electrical Testing Association to supervise testing specified in Part 3.
26 28 01 - 2
D. Comply with IEEE 399 for general study procedures.
E. Comply with IEEE 242 for short-circuit currents and coordination time intervals.
PART 2 - PRODUCTS
2.1 COMPUTER SOFTWARE DEVELOPERS
A. Computer Software Developers: Subject to compliance with requirements, companies offering computer software programs that may be used in the Work include, but are not limited to, the following:
1. Power Analytics Corporation.
2. SKM Systems Analysis, Inc.
2.2 COMPUTER SOFTWARE PROGRAM REQUIREMENTS
A. Comply with IEEE 399.
B. Analytical features of fault-current-study computer software program shall include "mandatory," "very desirable," and "desirable" features as listed in IEEE 399, Table 7-4.
C. Computer software program shall be capable of plotting and diagramming time-current-characteristic curves as part of its output. Computer software program shall report device settings and ratings of all overcurrent protective devices.
D. Optional Features:
1. Arcing faults.
2. Simultaneous faults.
3. Explicit negative sequence.
4. Mutual coupling in zero sequence.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Examine Project overcurrent protective device submittals for compliance with electrical distribution system coordination requirements and other conditions affecting performance.
Devices to be coordinated are indicated on Drawings.
B. Proceed with coordination study only after relevant equipment submittals have been assembled.
Overcurrent protective devices not submitted for approval with coordination study may not be used in study.
3.2 FAULT-CURRENT STUDY
A. Source Impedance: Primary circuit fault-current contribution if obtainable; otherwise assume an infinite bus on primary side of utility transformer.
26 28 01 - 3
B. Study electrical distribution system from normal and alternate power sources throughout electrical distribution system for Project and use approved computer software program to calculate values. Include studies of system-switching configurations and alternate operations that could result in maximum fault conditions.
C. Calculate momentary and interrupting duties on the basis of maximum available fault current.
D. Calculations to verify interrupting ratings of overcurrent protective devices shall comply with the following:
1. Low-Voltage Circuit Breakers: IEEE 1015 and IEEE C37.50.
2. Low-Voltage Fuses: IEEE C37.46.
3. Circuit Breakers: IEEE C37.13.
E. Study Report: Enter calculated X/R ratios and interrupting (5-cycle) fault currents on electrical distribution system diagram of the report. List other output values from computer analysis, including momentary (1/2-cycle), interrupting (5-cycle), and 30-cycle fault-current values for 3-phase, 2-phase, and phase-to-ground faults.
F. Equipment Evaluation Report: Prepare a report on the adequacy of overcurrent protective devices and conductors by comparing fault-current ratings of these devices with calculated fault-current momentary and interrupting duties.
3.3 COORDINATION STUDY
A. Gather and tabulate the following input data to support coordination study:
1. Product Data for overcurrent protective devices specified in other Division 26 Sections and involved in overcurrent protective device coordination studies. Use equipment designation tags that are consistent with electrical distribution system diagrams, overcurrent protective device submittals, input and output data, and recommended device settings.
2. Impedance of utility service entrance.
3. Electrical distribution system diagram showing the following:
a. Load current that is the basis for sizing continuous ratings of circuits for cables and equipment.
b. Circuit-breaker and fuse-current ratings and types.
c. Relays and associated power and current transformer ratings and ratios.
d. Transformer kilovolt amperes, primary and secondary voltages, connection type, impedance, and X/R ratios.
e. Generator kilovolt amperes, size, voltage, and source impedance.
f. Cables. Indicate conduit material, sizes of conductors, conductor insulation, and length.
g. Busway ampacity and impedance.
h. Motor horsepower and code letter designation according to NEMA MG 1.
4. Data sheets to supplement electrical distribution system diagram, cross-referenced with tag numbers on diagram:
a. Special load considerations, including starting inrush currents and frequent starting and stopping.
b. Magnetic inrush current overload capabilities of transformers.
26 28 01 - 4
c. Motor full-load current, locked rotor current, service factor, starting time, type of start, and thermal-damage curve.
d. Ratings, types, and settings of utility company's overcurrent protective devices.
e. Special overcurrent protective device settings or types stipulated by utility company.
f. Time-current-characteristic curves of devices indicated to be coordinated.
g. Manufacturer, frame size, interrupting rating in amperes rms symmetrical, ampere or current sensor rating, long-time adjustment range, short-time adjustment range, and instantaneous adjustment range for circuit breakers.
h. Manufacturer and type, ampere-tap adjustment range, time-delay adjustment range, instantaneous attachment adjustment range, and current transformer ratio for overcurrent relays.
i. Panelboards, switchboards, motor-control center ampacity, and interrupting rating in amperes rms symmetrical.
B. Perform coordination study and prepare a written report using the results of fault-current study and approved computer software program. Comply with IEEE 399.
1. Comply with NFPA 70 for overcurrent protection of circuit elements and devices.
2. See Editing Instruction No. 4 in the Evaluations for discussion of two publications listed in first paragraph below.
3. Comply with IEEE 141 recommendations for fault currents and time intervals.
3.4 TRANSFORMER PRIMARY OVERCURRENT PROTECTIVE DEVICES
A. Device shall not operate in response to the following:
1. Self-cooled, full-load current or forced-air-cooled, full-load current, whichever is specified for that transformer.
2. Permissible transformer overloads according to IEEE C57.96 if required by unusual loading or emergency conditions.
B. Device shall protect transformer according to IEEE C57.12.00, for fault currents.
C. Motors served by voltages more than 600 V shall be protected according to IEEE 620.
3.5 CONDUCTOR PROTECTION
A. Protect cables against damage from fault currents according to ICEA P-32-382, ICEA P-45-482, and conductor melting curves in IEEE 242.
B. Verify adequacy of phase conductors at maximum three-phase bolted fault currents, equipment grounding conductors, and grounding electrode conductors at maximum ground-fault currents.
3.6 COORDINATION-STUDY REPORT
A. Prepare a written report indicating the following results of coordination study:
1. Tabular Format of Settings Selected for Overcurrent Protective Devices:
a. Device tag.
26 28 01 - 5
b. Relay-current transformer ratios; and tap, time-dial, and instantaneous-pickup values.
c. Circuit-breaker sensor rating; and long-time, short-time, and instantaneous settings.
d. Fuse-current rating and type.
e. Ground-fault relay-pickup and time-delay settings.
2. Coordination Curves: Prepared to determine settings of overcurrent protective devices to achieve selective coordination. Graphically illustrate that adequate time separation exists between series devices, including power utility company's upstream devices. Show the following specific information:
a. Device tag.
b. Voltage and current ratio for curves.
c. Three-phase and single-phase damage points for each transformer.
d. No damage, melting, and clearing curves for fuses.
e. Transformer inrush points.
f. Maximum fault-current cutoff point.
3. Completed data sheets for setting of overcurrent protective devices.
3.7 OVERCURRENT PROTECTIVE DEVICE SETTING
A. Manufacturer's Field Service: Engage a factory-authorized service representative, of electrical distribution equipment being set and adjusted, to assist in setting of overcurrent protective devices within equipment.
B. Testing: Engage a qualified testing agency to perform the following device setting and to prepare test reports.
1. After installing overcurrent protective devices and during energizing process of electrical distribution system, perform the following:
a. Verify that overcurrent protective devices meet parameters used in studies.
b. Adjust devices to values listed in study results.
2. Adjust devices according to recommendations in Chapter 7, "Inspection and Test Procedures," and Tables 100.7 and 100.8 in NETA ATS.
END OF SECTION
PRODUCT REFRIGERATION MICRO-DISTRIBUTED SYSTEMS
23 90 00
A. 1P0& Case, Produce, Pre-cut Packaged Vegetables and Juices, Upright, Refrigerated:
1. Salient characteristics:
a. Nominal Dimensions:
1) Length:
a) 1P07GD-8: 96-3/8 inches (1-1/2 inch end panels).
b) 1P07GD-12: 144-1/2 inches (1-1/2 inch end panels).
2) Height: 81-3/4 inches.
3) Depth: 42 inches.
4) Door Width: 24 inches
5) Upper Shelves: 22 inches deep.
6) Sill Height: 19-5/8 inches (max).
b. Canopy Lights: Horizontal lighting fixtures, with LED lighting,
c. Shelves: Six levels of display composed of bottom deck and 5 rows of removable upper cantilevered adjustable shelves.
d. Front edges of shelves and deck equipped with price tag molding to hold standard size price tags/labels.
e. French door style glass doors, 24 inches wide.
f. Self-contained, water cooled refrigeration designed to maintain a product temperature of 33 - 38 deg F.
2. Basis-of-Design Product: Hussmann, Model DDF5X-LP.
DRAWN BY:
SUBMITTED BY::
ENGINEER:
REVIEWED BY:
DESIGNED BY:
SYM. D.O. NO. ACTION DATE
DATE:
DRAWING NUMBER
CONTR. NO.
SOL. NO.
COMMISSARY
DESCRIPTION OF REVISION
SEQUENCE
NO.
FORT BUCHANAN
PUERTO RICO
DEFENSE COMMISSARY AGENCY
LACKLAND AFB, TEXAS
DIRECTORATE OF ENGINEERING
FORT GREGG-ADAMS, VIRGINIA
300 Park Boulevard, Sui te 250 I tasca , I l l i no i s 60143-2655
28 JUN 2023
REFRIGERATION, HVAC,
AND DECOR UPGRADE
28 JUN 23 SOLICITATION ISSUE - RTA
FINISHES LEGEND ROOM FINISH REMARKS
NEW EQUIPMENT COLORS
FINISH ABBREVIATIONS
DISPLAY CASES ( 1P03, 1P07 )
- BUMPER RAIL (HUSSMANN MFR.) : No. 701 - SHADOW BLACK
- KICK PLATE : MFR'S. STANDARD BLACK
DISPLAY CASES ( 1D00, 1DXX, 1G02, 1G24, 1M04, 1M07 )
- CASE INTERIOR (HUSSMANN MFR.) : No. 700 - INTERIOR WHITE
- CASE EXTERIOR & END PANELS (HUSSMANN MFR.) : No. 747 - CHOCOLATE BROWN
- CASE EXTERIOR & END PANELS (OTHER MFRS.) : MATCH BENJAMIN MOORE - No. 2106-10 - JAVA
CONCRETE MASONRY UNIT
PREFABRICATED INSULATED COLD STORAGE ROOM PANEL
FIBERGLASS REINFORCED PANEL
ACOUSTICAL PANEL CEILING
SOLID VINYL TILE
PLASTIC LAMINATE
RESINOUS FLOORING
EXPOSED STRUCTURE
PF
QT
PL
SVT
RES
WM
RB
S STAIN
WIRE MESH
QUARRY TILE
RESILIENT BASE
CMU
CONC
CT
EX
APC
EXP STR
FRP
CERAMIC TILE
CONCRETE
EXISTING
STD STANDARD
SS STAINLESS STEEL
MFR MANUFACTURER
UNO UNLESS NOTED OTHERWISE
- DOOR FRAMES, TRIM & HANDLES : MFR'S. STANDARD BLACK
- CASE EXTERIOR & END PANELS (HUSSMANN MFR.) : No. 747 - CHOCOLATE BROWN
- CASE EXTERIOR & END PANELS (OTHER MFRS.) : MATCH BENJAMIN MOORE - No. 2106-10 - JAVA
- CASE INTERIOR (OTHER MFRS.) : MATCH HUSSMANN - No. 700 - INTERIOR WHITE
- BUMPER RAIL (OTHER MFRS.) : MFR'S. STANDARD BLACK
- BUMPER RAIL (HUSSMANN MFR.) : No. 701 - SHADOW BLACK
- KICK PLATE : MFR'S. STANDARD BLACK
- CASE INTERIOR (HUSSMANN MFR.) : No. 701 - SHADOW BLACK
- DOOR FRAMES, TRIM & HANDLES : MFR'S. STANDARD BLACK
- CASE INTERIOR (OTHER MFRS.) : MATCH HUSSMANN - No. 701 - SHADOW BLACK
- BUMPER RAIL (OTHER MFRS.) : MFR'S. STANDARD BLACK
DISPLAY CASES ( 1G10, 1G27, 1G35 )
- BUMPER RAIL (HUSSMANN MFR.) : No. 701 - SHADOW BLACK
- KICK PLATE : MFR'S. STANDARD BLACK
- CASE INTERIOR (HUSSMANN MFR.) : No. 700 - INTERIOR WHITE
- CASE EXTERIOR & END PANELS (ALL MFRS.) : MATCH BENJAMIN MOORE - No. 840 - KENSINGTON BLUE
- DOOR FRAMES, TRIM & HANDLES : MFR'S. STANDARD BLACK
- CASE INTERIOR (OTHER MFRS.) : MATCH HUSSMANN - No. 700 - INTERIOR WHITE
- BUMPER RAIL (OTHER MFRS.) : MFR'S. STANDARD BLACK
OTHER EQUIPMENT NOT INDICATED HERE
- SEE SPECIFICATIONS
MOLD & MOISTURE RESISTANT GYPSUM WALL BOARDMR GWB
ALUMINUM / GLASSAL/GL
ECT ENTRANCE CARPET TILE
GYPSUM WALL BOARDGWB
REDS
PR-1 7526C
PR-2 7427C
PR-3 1815C
PR-4 1807C
PR-5 1797C
PR-6 484C
PR-7 187C
ORANGES
PO-1 715C
PO-2 718C
PO-3 713C
PO-4 167C
PO-5 7413C
PO-6 7414C
PO-7 471C
PO-8 485C
PO-9 158C
PO-10 1595C
PO-11 470C
YELLOWS
PY-1 157C
PY-2 128C
PY-3 127C
PY-4 600C
PY-5 100C
GREENS
PG-1 5763C
PG-2 5783C
PG-3 5767C
PG-4 5753C
PG-5 350C
PG-6 374C
PG-7 360C
PG-8 576C
BLUES
PB-1 2758C
PB-2 279C
PB-3 653C
PB-4 19-4118
TPX DARK
DENIM
PB-5 653C
PB-6 654C
NEUTRALS
PN-1 4625C
PN-2 1605C
PN-3 7510C
MISCELLANEOUS
PM-1 469C
PM-2 7510C
PM-3 7511C
PM-4 BLACK C
PM-5 WHITE C
PANTONE COLOR SCHEDULE
INTERIOR DECOR COMPONENT COLORS
CEILINGS
FLOORS
GENERAL
GLASS MAT FACED GYPSUM WALLBOARDGMF GWB
WALLS
ROOM FINISH SCHEDULE
ROOM
NUMBER ROOM NAME
FLOOR BASE
WALLS
CEILING
REMARKSNORTH EAST SOUTH WEST
FLOOR MATERIAL FINISH FINISH WALL
MATERIAL FINISH WALL
MATERIAL FINISH WALL
MATERIAL FINISH WALL
MATERIAL FINISH CEILING
MATERIAL FINISH HEIGHT
1 ENTRY VESTIBULE - - - - - - - - - - - - - - -
1A ENTRY VESTIBULE - - - - - - - - - - - - - - -
2A EXIT VESTIBULE - - - - - - - - - - - - - - -
2B EXIT VESTIBULE - - - - - - - - - - - - - - -
3A CART RETURN VESTIBULE - - - - - - - - - - - - - - -
3B CART RETURN VESTIBULE - - - - - - - - - - - - - - -
4 CASHIER'S OFFICE - - - - - - - - - - - - - - -
5 CASH COUNTING ROOM - - - - - - - - - - - - - - -
6 /19 CUSTOMER SERVICE OFFICE/
STORE MANAGER - - - - - - - - - - - - - - -
8 CART STORAGE - - - - - - - - - -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .